5048 N PALOMAR DR 91356

Certificate Information: 5048 N PALOMAR DR 91356

Application / Permit
21014-20000-04338
Plan Check / Job No.
B21VN11582
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 11'-7" x 4'-3" ADDITION TO THE (E) SINGLE FAMILY DWELLING TO EXTEND (E) DINING ROOM. INTERIOR REMODEL TO THE (E) DINING ROOM, LIVING ROOM, KITCHEN, LAUNDRY ROOM, POWDER ROOM, BEDROOMS AND BATHROOMS.
Permit Issued
Issued on 11/22/2021
Issuing Office
Current Status
Issued on 11/22/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/26/2021 APPLICANT
Assigned to Plan Check Engineer 9/3/2021 SARKIS HARABEDIAN
Corrections Issued 9/6/2021 SARKIS HARABEDIAN
Plan Check Approved 11/18/2021 SARKIS HARABEDIAN
Issued 11/22/2021 APPLICANT
Building Plans Picked Up 11/22/2021 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/10/2021 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 9/10/2021 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 9/10/2021 LEE GUILBEAUX
Grading Pre-Inspection Cleared 11/18/2021 SARKIS HARABEDIAN

Contact Information

Contractor Owner-Builder       ,
Engineer Khansa,, Eyass Wafik; Lic. No.: C91758 2252 JOSIE AVE      LONG BEACH, CA 90815

Inspector Information

JOHN KIDWELL, (818) 774-4314 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/4/2022 Corrections Issued DAVID SANDOVAL
Footing/Foundation/Slab 3/21/2022 Corrections Issued DAVID SANDOVAL
Footing/Foundation/Slab 3/24/2022 Approved DAVID SANDOVAL
Floor/Roof Diaphrgm/Shear Wall 8/9/2022 Not Ready for Inspection DAVID SANDOVAL
Shower Pan 11/15/2022 Corrections Issued DAVID SANDOVAL
Shower Pan 11/23/2022 Approved DAVID SANDOVAL
BUILDING-Rough-Frame 11/1/2023 Approved HENRY KIM
ELECTRICAL-Final 11/1/2023 Corrections Issued HENRY KIM
Final 11/1/2023 Corrections Issued HENRY KIM
Green Building Final 11/1/2023 Approved HENRY KIM
Green Building Rough 11/1/2023 Approved HENRY KIM
HVAC-Final 11/1/2023 Corrections Issued HENRY KIM
PLUMBING-Final 11/1/2023 Corrections Issued HENRY KIM
SGSOV-Seismic Gas S/O Valve 11/1/2023 SGSOV Not Ready HENRY KIM
Smoke Detectors 11/1/2023 Approved HENRY KIM