3623 N DIXIE CANYON PL 91423

Certificate Information: 3623 N DIXIE CANYON PL 91423

Application / Permit
21014-20000-04258
Plan Check / Job No.
B21VN11320
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE PORTION OF STORAGE ROOMS AT 1ST (7 SF) AND 2ND (95 SF) FLR, AND ADD (N) ENTRY AT 2ND FLOOR (59 SF), AND REMODEL OF (E) SINGLE FAMILY DWELLING W/ ATT. 2-CAR GARAGE;
Permit Issued
Issued on 7/27/2022
Issuing Office
Valley
Current Status
Issued on 7/27/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/20/2021 APPLICANT
Assigned to Plan Check Engineer 9/9/2021 SEAN SHAHMIRI
Corrections Issued 9/13/2021 SEAN SHAHMIRI
Quality Review Completed 9/13/2021 OMID HEDAYAT
Building Plans Picked Up 9/15/2021 APPLICANT
Applicant returned to address corrections 4/20/2022 SEAN SHAHMIRI
Applicant returned to address corrections 4/21/2022 SEAN SHAHMIRI
Applicant returned to address corrections 7/12/2022 SEAN SHAHMIRI
Plan Check Approved 7/27/2022 SEAN SHAHMIRI
Issued 7/27/2022 APPLICANT

Permit Application Clearance Information

Construction near power lines Cleared 10/28/2021 RIDWAN HARDY
BHO/Hillside ordinance Cleared 11/15/2021 MARY MARCUS
BHO/Hillside ordinance Cleared 11/15/2021 MARY MARCUS
BHO/Hillside ordinance Cleared 11/15/2021 MARY MARCUS
BHO/Hillside ordinance Cleared 11/15/2021 MARY MARCUS
BHO/Hillside ordinance Cleared 11/15/2021 MARY MARCUS
BHO/Hillside ordinance Cleared 11/20/2021 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 11/20/2021 GABRIEL ROBLES
Watercourse Cleared 11/20/2021 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 11/23/2021 CARLOS AGUILERA
Specific Plan Cleared 12/7/2021 OLGA AYALA
Hydrant and Access approval Cleared 1/26/2022 KURT CORRAL

Contact Information

Contractor Csi Building Inc; Lic. No.: 1067948-B 261 E COLORADO BLVD STE 212      PASADENA, CA 91101
Engineer Phan,, Phillip Trung Tri; Lic. No.: C76425 641 S ALMIRANTE DR      WEST COVINA, CA 91791

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 9/1/2022 Partial Approval CHRISTOPHE COCHRAN
ELECTRICAL-Rough 10/26/2022 Partial Approval CHRISTOPHE COCHRAN
PLUMBING-Rough 10/26/2022 Partial Approval CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 6/20/2023 Conditional Approval CHRISTOPHE COCHRAN
ELECTRICAL-Rough 9/8/2023 Corrections Issued DAVID MATSON
PLUMBING-Rough 9/8/2023 Corrections Issued DAVID MATSON
ELECTRICAL-Rough 10/3/2023 Approved CHRISTOPHER ROJAS
PLUMBING-Rough 10/3/2023 Corrections Issued CHRISTOPHER ROJAS
Wood Frame 10/3/2023 Approved CHRISTOPHER ROJAS
ELECTRICAL-Rough 10/16/2023 Approved CHRISTOPHE COCHRAN
PLUMBING-Rough 10/16/2023 Partial Approval CHRISTOPHE COCHRAN
Wood Frame 10/16/2023 Corrections Issued CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 11/16/2023 Corrections Issued JOHN COLEMAN
Footing/Foundation/Slab 11/16/2023 Not Ready for Inspection JOHN COLEMAN
Excavation/Setback/Form/Re-Bar 1/17/2024 Not Ready for Inspection JOHN COLEMAN
Floor/Roof Diaphrgm/Shear Wall 1/17/2024 Not Ready for Inspection JOHN COLEMAN
Footing/Foundation/Slab 1/17/2024 Not Ready for Inspection JOHN COLEMAN
Wood Frame 1/17/2024 Corrections Issued JOHN COLEMAN
Pre-Inspection 2/1/2024 Approved CHRISTOPHE COCHRAN
Wood Frame 2/1/2024 Partial Approval CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 4/10/2024 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 4/11/2024 Partial Inspection CHRISTOPHE COCHRAN
Interior/Exterior Lathing 4/12/2024 Partial Approval CHRISTOPHE COCHRAN
Wood Frame 4/12/2024 Approved CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 5/6/2024 Partial Approval CHRISTOPHE COCHRAN
Footing/Foundation/Slab 5/6/2024 Partial Approval CHRISTOPHE COCHRAN
Insulation 5/6/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Masonry Wall/Backfill 5/6/2024 Partial Approval CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 5/29/2024 Partial Approval CHRISTOPHE COCHRAN
Insulation 5/29/2024 Approved CHRISTOPHE COCHRAN
Masonry Wall/Backfill 5/29/2024 Partial Approval CHRISTOPHE COCHRAN
Deputy Reinf. Concrete 6/12/2024 Conditional Approval JUAN VALENZUELA
Drywall Nailing 8/26/2024 Approved CHRISTOPHE COCHRAN
Green Building Rough 8/26/2024 Approved CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 10/8/2024 Conditional Approval ROBERT GOLD
BUILDING-Rough-Frame 11/12/2024 Partial Approval CHRISTOPHE COCHRAN
Wood Frame 11/12/2024 Partial Approval CHRISTOPHE COCHRAN
Interior/Exterior Lathing 1/27/2025 Partial Approval JACK KARGODORIAN
Shower Pan 1/27/2025 Partial Approval JACK KARGODORIAN
Floor/Roof Diaphrgm/Shear Wall 2/24/2025 Approved CHRISTOPHE COCHRAN
Shower Pan 2/24/2025 Approved CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 7/8/2025 Approved JACK KARGODORIAN
Footing/Foundation/Slab 7/8/2025 Approved JACK KARGODORIAN
BUILDING-Rough-Frame 9/2/2025 Corrections Issued CHRISTOPHE COCHRAN
Structural Steel Frame 9/2/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
Structural Steel Frame 9/5/2025 Approved MISAEL ESPARZA
Wood Frame 9/5/2025 Approved MISAEL ESPARZA
Shower Pan 5/5/2026 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 5/21/2026 Approved CHRISTOPHE COCHRAN
Pre-Inspection 5/21/2026 Approved CHRISTOPHE COCHRAN