13228 W RAVEN ST 91342

Certificate Information: 13228 W RAVEN ST 91342

Application / Permit
21014-20000-04197
Plan Check / Job No.
B21VN11114
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
IRREGULAR SHAPED ADDITIONS TO AND CONVERT THE (E) REC. ROOM AND STORAGE INTO A (N) ACCESSORY DWELLING UNIT, PER LAMC 12.22 A.33(c) and (d). TO REFRAME (E) ROOF, ALL WORK PER ENGINEERING.
Permit Issued
Issued on 3/19/2022
Issuing Office
Current Status
CofO Issued on 7/23/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/1/2021 APPLICANT
Assigned to Plan Check Engineer 9/8/2021 LUISANGEL VALENZUELA
Corrections Issued 9/8/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 11/15/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 12/22/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 1/15/2022 SAMUEL GONZALEZ
Applicant returned to address corrections 3/2/2022 LUISANGEL VALENZUELA
Plan Check Approved 3/10/2022 LUISANGEL VALENZUELA
Building Plans Picked Up 3/14/2022 APPLICANT
Issued 3/19/2022 APPLICANT
CofO in Progress 7/18/2022 ARAM AVEDISIAN
CofO Issued 7/23/2022 MICHAEL SMITH
Permit Finaled 7/23/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 11/29/2021 JOSE DUARTE-DIAZ
Roof/Waste drainage to street Cleared 11/29/2021 JOSE DUARTE-DIAZ
Eng Process Fee Ord 176,300 Cleared 12/6/2021 JOSE DUARTE-DIAZ
Sewer availability Cleared 12/6/2021 JOSE DUARTE-DIAZ
Grading Pre-Inspection Cleared 12/9/2021 TIMOTHY POWELL

Contact Information

Contractor Sarahang Construction Inc; Lic. No.: 897724-B 39312 DUNBAR      PALMDALE, CA 93551
Engineer Gonzalez,, Fernando Francisco; Lic. No.: C53256 11607 AMESTOY AVE      GRANADA HILLS, CA 91344

Inspector Information

KEVIN BERBERYAN, (818) 374-9931 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/23/2022 Conditional Approval MICHAEL TEMPLE
PLUMBING-Rough 3/23/2022 Partial Approval MICHAEL TEMPLE
Footing/Foundation/Slab 3/25/2022 Approved MICHAEL TEMPLE
BUILDING-Rough-Frame 4/25/2022 Corrections Issued JOHN HAYES
Floor/Roof Diaphrgm/Shear Wall 4/25/2022 Partial Approval JOHN HAYES
Rough-Elec/Plmb/HVAC 4/25/2022 Not Ready for Inspection JOHN HAYES
Special/Order Compliance 4/25/2022 Not Ready for Inspection JOHN HAYES
Deputy Wood Construction 4/27/2022 Conditional Approval JOHN HAYES
BUILDING-Rough-Frame 4/28/2022 Approved JOHN HAYES
ELECTRICAL-Rough 4/28/2022 Approved JOHN HAYES
Green Building Rough 4/28/2022 Approved JOHN HAYES
HVAC-Rough 4/28/2022 Approved JOHN HAYES
PLUMBING-Rough 4/28/2022 Approved JOHN HAYES
Insulation 5/6/2022 Approved RAUL OLAGI
Interior/Exterior Lathing 5/6/2022 Partial Approval RAUL OLAGI
Drywall Nailing 5/17/2022 Approved JOHN HAYES
Final 7/5/2022 Corrections Issued ARAM AVEDISIAN
Green Building Final 7/5/2022 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 7/5/2022 SGSOV Not Ready ARAM AVEDISIAN
Smoke Detectors 7/5/2022 Approved ARAM AVEDISIAN
Final 7/11/2022 Corrections Issued ARAM AVEDISIAN
Final 7/18/2022 OK to Issue CofO ARAM AVEDISIAN
PLUMBING-Final 7/18/2022 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 7/18/2022 SGSOV Approved ARAM AVEDISIAN