10437 N DES MOINES AVE 91326

Certificate Information: 10437 N DES MOINES AVE 91326

Application / Permit
21014-20000-03701
Plan Check / Job No.
B21VN09551
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 12'-5.5" x 22'-11.75" ADDITION TO THE (E) SINGLE FAMILY DWELLING FOR A NEW MASTER BEDROOM AND INTERIOR REMODEL TO RELOCATE (E) MASTER BATHROOM'S DOOR.
Permit Issued
Issued on 12/10/2021
Issuing Office
Current Status
Issued on 12/10/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/23/2021 APPLICANT
Assigned to Plan Check Engineer 7/30/2021 SARKIS HARABEDIAN
Corrections Issued 7/30/2021 SARKIS HARABEDIAN
Applicant returned to address corrections 9/1/2021 SARKIS HARABEDIAN
Plan Check Approved 11/4/2021 SARKIS HARABEDIAN
Building Plans Picked Up 11/8/2021 APPLICANT
Issued 12/10/2021 APPLICANT

Permit Application Clearance Information

ZA Case Cleared 8/6/2021 PABLO ESTRADA
Roof/Waste drainage to street Cleared 8/9/2021 GABRIEL ROBLES
Sewer availability Cleared 8/9/2021 GABRIEL ROBLES
Grading Pre-Inspection Cleared 8/11/2021 MANUEL TEJADA
Eng Process Fee Ord 176,300 Cleared 8/13/2021 GABRIEL ROBLES
Construction near power lines Cleared 10/15/2021 RIDWAN HARDY

Contact Information

Contractor Hudnall Construction; Lic. No.: 1036622-B 18224 GRESHAM ST      NORTHRIDGE, CA 91325
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

JACK KARGODORIAN, (818) 774-4319 Office Hours: 7:00-8:00 AM MON-FRI
KRISTEN CAUSEY, (818) 774-4319 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 4/19/2022 Conditional Approval JUSTIN HAWLEY
BUILDING-Rough-Frame 7/22/2022 Not Ready for Inspection JEFFREY PARD
Green Building Rough 7/22/2022 Not Ready for Inspection JEFFREY PARD
BUILDING-Rough-Frame 8/11/2022 Approved JEFFREY PARD
Green Building Rough 8/11/2022 Approved JEFFREY PARD
Wood Frame 8/11/2022 Approved JEFFREY PARD
Insulation 8/17/2022 No Access for Inspection KRISTEN CAUSEY
Floor/Roof Diaphrgm/Shear Wall 8/23/2022 Approved KRISTEN CAUSEY
Insulation 8/23/2022 Approved KRISTEN CAUSEY
Drywall Nailing 8/29/2022 Approved KRISTEN CAUSEY
Interior/Exterior Lathing 9/6/2022 Approved KRISTEN CAUSEY
Final 9/20/2022 Not Ready for Inspection JEFFREY PARD
Footing/Foundation/Slab 9/20/2022 Approved JEFFREY PARD
Green Building Final 9/20/2022 Not Ready for Inspection JEFFREY PARD
SGSOV-Seismic Gas S/O Valve 9/20/2022 SGSOV Approved JEFFREY PARD
Smoke Detectors 9/20/2022 Not Ready for Inspection JEFFREY PARD
Green Building Final 10/13/2022 Corrections Issued JOHN KIDWELL
Smoke Detectors 10/13/2022 Approved JOHN KIDWELL