532 1/4-3/4 N SPAULDING AVE 90036

Certificate Information: 532 1/4-3/4 N SPAULDING AVE 90036

Application / Permit
21014-20000-02879
Plan Check / Job No.
B21VN07181
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 2 STORY 2 ADUS (42'-0"x37'-0"),1495 SQFT W/NEW 4 CAR GARAGE ON 1ST FLOOR (783 SQFT)PER SB897 “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.”
Permit Issued
Issued on 4/18/2023
Issuing Office
Valley
Current Status
CofO Issued on 7/22/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/8/2021 APPLICANT
Assigned to Plan Check Engineer 7/8/2021 PETER MOSESIAN
Corrections Issued 7/15/2021 PETER MOSESIAN
Quality Review Completed 7/19/2021 OMID HEDAYAT
Building Plans Picked Up 7/21/2021 APPLICANT
Applicant returned to address corrections 2/1/2022 PETER MOSESIAN
Applicant returned to address corrections 10/12/2022 PETER MOSESIAN
Plan Check Approved 11/4/2022 PETER MOSESIAN
Issued 4/18/2023 APPLICANT
CofO in Progress 7/18/2024 AMIR NAZARIAN
CofO Issued 7/22/2024 DEROLD HAUFF
Permit Finaled 7/22/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/28/2021 THOMAS LANG
Address approval Cleared 7/28/2021 THOMAS LANG
Eng Process Fee Ord 176,300 Cleared 8/2/2021 THOMAS LANG
Sewer availability Cleared 8/2/2021 THOMAS LANG
Historic monument Cleared 10/28/2021 MICAELA TORRES-GIL
Construction near power lines Cleared 1/3/2022 RIDWAN HARDY
Roof/Waste drainage to street Cleared 1/12/2022 JEANETTE VONG

Contact Information

Contractor Eden Development & Consulting Inc; Lic. No.: 984612-B 13455 VENTURA BLVD STE 215      SHERMAN OAKS, CA 91423
Engineer Kaligi,, Sean; Lic. No.: M37797 655 N CENTRAL AVE 17TH FL      GLENDALE, CA 91203
Engineer Standley,, Craig Erick; Lic. No.: C87675 5330 ZELZAH AVE UNIT 7      ENCINO, CA 91316

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 4/20/2023 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 4/20/2023 Partial Approval LARRY ARNICK
METHANE-Barrier 4/20/2023 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 4/20/2023 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 8/4/2023 Partial Approval JEROME BLACKWOOD
METHANE-Barrier 8/4/2023 Partial Approval JEROME BLACKWOOD
METHANE-Subgrade 8/4/2023 Partial Approval JEROME BLACKWOOD
METHANE-Barrier 8/29/2023 Partial Inspection JEROME BLACKWOOD
METHANE-Subgrade 8/29/2023 Partial Inspection JEROME BLACKWOOD
Footing/Foundation/Slab 9/5/2023 Partial Approval JEROME BLACKWOOD
METHANE-Barrier 9/5/2023 Partial Approval JEROME BLACKWOOD
METHANE-Subgrade 9/5/2023 Partial Approval JEROME BLACKWOOD
Deputy Reinf. Concrete 9/7/2023 Partial Approval JEROME BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Partial Approval JEROME BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 11/14/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/23/2024 Not Ready for Inspection ALFREDO LOPEZ
METHANE-Rough 1/23/2024 Not Ready for Inspection ALFREDO LOPEZ
Structural Steel Frame 1/23/2024 Not Ready for Inspection ALFREDO LOPEZ
Verify Sprinkler Sign Off 1/23/2024 Not Ready for Inspection ALFREDO LOPEZ
Wood Frame 1/23/2024 Not Ready for Inspection ALFREDO LOPEZ
Green Building Final 1/29/2024 Not Ready for Inspection ALFREDO LOPEZ
METHANE-Rough 1/29/2024 Not Ready for Inspection ALFREDO LOPEZ
Verify Rec and Parks Fee Memo 1/29/2024 Not Ready for Inspection ALFREDO LOPEZ
Drywall Nailing 7/16/2024 Approved AMIR NAZARIAN
Final 7/16/2024 OK to Issue CofO AMIR NAZARIAN
Footing/Foundation/Slab 7/16/2024 Approved AMIR NAZARIAN
Green Building Final 7/16/2024 Approved AMIR NAZARIAN
Green Building Rough 7/16/2024 Approved AMIR NAZARIAN
METHANE-Barrier 7/16/2024 Approved AMIR NAZARIAN
METHANE-Final 7/16/2024 Approved AMIR NAZARIAN
METHANE-Rough 7/16/2024 Approved AMIR NAZARIAN
METHANE-Subgrade 7/16/2024 Approved AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 7/16/2024 SGSOV Approved AMIR NAZARIAN
Smoke Detectors 7/16/2024 Approved AMIR NAZARIAN
Verify Sprinkler Sign Off 7/16/2024 Approved AMIR NAZARIAN
Wood Frame 7/16/2024 Approved AMIR NAZARIAN