532 1/4-3/4 N SPAULDING AVE 90036
Certificate Information: 532 1/4-3/4 N SPAULDING AVE 90036
- Application / Permit
- 21014-20000-02879
- Plan Check / Job No.
- B21VN07181
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Accessory Dwelling Unit
- Work Description
- NEW 2 STORY 2 ADUS (42'-0"x37'-0"),1495 SQFT W/NEW 4 CAR GARAGE ON 1ST FLOOR (783 SQFT)PER SB897 “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.”
- Permit Issued
- Issued on 4/18/2023
- Issuing Office
- Valley
- Current Status
- CofO Issued on 7/22/2024
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 6/8/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 7/8/2021 | PETER MOSESIAN |
| Corrections Issued | 7/15/2021 | PETER MOSESIAN |
| Quality Review Completed | 7/19/2021 | OMID HEDAYAT |
| Building Plans Picked Up | 7/21/2021 | APPLICANT |
| Applicant returned to address corrections | 2/1/2022 | PETER MOSESIAN |
| Applicant returned to address corrections | 10/12/2022 | PETER MOSESIAN |
| Plan Check Approved | 11/4/2022 | PETER MOSESIAN |
| Issued | 4/18/2023 | APPLICANT |
| CofO in Progress | 7/18/2024 | AMIR NAZARIAN |
| CofO Issued | 7/22/2024 | DEROLD HAUFF |
| Permit Finaled | 7/22/2024 | DEROLD HAUFF |
Permit Application Clearance Information
| Address approval | Cleared | 7/28/2021 | THOMAS LANG |
| Address approval | Cleared | 7/28/2021 | THOMAS LANG |
| Eng Process Fee Ord 176,300 | Cleared | 8/2/2021 | THOMAS LANG |
| Sewer availability | Cleared | 8/2/2021 | THOMAS LANG |
| Historic monument | Cleared | 10/28/2021 | MICAELA TORRES-GIL |
| Construction near power lines | Cleared | 1/3/2022 | RIDWAN HARDY |
| Roof/Waste drainage to street | Cleared | 1/12/2022 | JEANETTE VONG |
Contact Information
| Contractor | Eden Development & Consulting Inc; Lic. No.: 984612-B | 13455 VENTURA BLVD STE 215 SHERMAN OAKS, CA 91423 |
| Engineer | Kaligi,, Sean; Lic. No.: M37797 | 655 N CENTRAL AVE 17TH FL GLENDALE, CA 91203 |
| Engineer | Standley,, Craig Erick; Lic. No.: C87675 | 5330 ZELZAH AVE UNIT 7 ENCINO, CA 91316 |
Inspector Information
| JOSE MACIAS, (213) 202-3125 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Methane Barrier | 4/20/2023 | Conditional Approval | LARRY ARNICK |
| Footing/Foundation/Slab | 4/20/2023 | Partial Approval | LARRY ARNICK |
| METHANE-Barrier | 4/20/2023 | Not Ready for Inspection | LARRY ARNICK |
| METHANE-Subgrade | 4/20/2023 | Not Ready for Inspection | LARRY ARNICK |
| Deputy Methane Barrier | 4/26/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Footing/Foundation/Slab | 8/4/2023 | Partial Approval | JEROME BLACKWOOD |
| METHANE-Barrier | 8/4/2023 | Partial Approval | JEROME BLACKWOOD |
| METHANE-Subgrade | 8/4/2023 | Partial Approval | JEROME BLACKWOOD |
| METHANE-Barrier | 8/29/2023 | Partial Inspection | JEROME BLACKWOOD |
| METHANE-Subgrade | 8/29/2023 | Partial Inspection | JEROME BLACKWOOD |
| Footing/Foundation/Slab | 9/5/2023 | Partial Approval | JEROME BLACKWOOD |
| METHANE-Barrier | 9/5/2023 | Partial Approval | JEROME BLACKWOOD |
| METHANE-Subgrade | 9/5/2023 | Partial Approval | JEROME BLACKWOOD |
| Deputy Reinf. Concrete | 9/7/2023 | Partial Approval | JEROME BLACKWOOD |
| Floor/Roof Diaphrgm/Shear Wall | 9/27/2023 | Partial Approval | JEROME BLACKWOOD |
| Floor/Roof Diaphrgm/Shear Wall | 11/14/2023 | Partial Approval | EDWIN GREGORYONA |
| Green Building Rough | 1/23/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| METHANE-Rough | 1/23/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Structural Steel Frame | 1/23/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Verify Sprinkler Sign Off | 1/23/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Wood Frame | 1/23/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Green Building Final | 1/29/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| METHANE-Rough | 1/29/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Verify Rec and Parks Fee Memo | 1/29/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Drywall Nailing | 7/16/2024 | Approved | AMIR NAZARIAN |
| Final | 7/16/2024 | OK to Issue CofO | AMIR NAZARIAN |
| Footing/Foundation/Slab | 7/16/2024 | Approved | AMIR NAZARIAN |
| Green Building Final | 7/16/2024 | Approved | AMIR NAZARIAN |
| Green Building Rough | 7/16/2024 | Approved | AMIR NAZARIAN |
| METHANE-Barrier | 7/16/2024 | Approved | AMIR NAZARIAN |
| METHANE-Final | 7/16/2024 | Approved | AMIR NAZARIAN |
| METHANE-Rough | 7/16/2024 | Approved | AMIR NAZARIAN |
| METHANE-Subgrade | 7/16/2024 | Approved | AMIR NAZARIAN |
| SGSOV-Seismic Gas S/O Valve | 7/16/2024 | SGSOV Approved | AMIR NAZARIAN |
| Smoke Detectors | 7/16/2024 | Approved | AMIR NAZARIAN |
| Verify Sprinkler Sign Off | 7/16/2024 | Approved | AMIR NAZARIAN |
| Wood Frame | 7/16/2024 | Approved | AMIR NAZARIAN |