716 N VISTA ST 90046

Certificate Information: 716 N VISTA ST 90046

Application / Permit
21014-20000-02650
Plan Check / Job No.
B21VN06594
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
MAJOR REMODEL & 212 SQ. FT. ADDITION TO (E) IRREGULAR SHAPED SINGLE FAMILY DWELLING WHICH INCLUDES NEW WINDOWS, DOORS, ELECTRICAL, PLUMBING RE-ROOF W/ DECK ADDITION. NFPA 13D FIRE SPRINKLERS REQUIRED THROUGHOUT. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 9/20/2021
Issuing Office
Current Status
CofO Issued on 5/11/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/25/2021 APPLICANT
Assigned to Plan Check Engineer 7/1/2021 COLIN LOREDO
Corrections Issued 7/6/2021 COLIN LOREDO
Quality Review Completed 7/7/2021 OMID HEDAYAT
Building Plans Picked Up 7/12/2021 APPLICANT
Applicant returned to address corrections 7/21/2021 COLIN LOREDO
Plan Check Approved 8/10/2021 COLIN LOREDO
Issued 9/20/2021 APPLICANT
CofO in Progress 5/5/2023 LILIANA PORTILLO
Permit Finaled 5/11/2023 DEROLD HAUFF
CofO Issued 5/11/2023 DEROLD HAUFF
Permit Finaled 5/11/2023 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 7/28/2021 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 8/2/2021 STEVE MELGAR

Contact Information

Contractor Behr Construction Co; Lic. No.: 409066-B 1363 FOOTHILL BLVD      LA CANADA, CA 91011
Engineer Sadeghi,, Hamid M; Lic. No.: C33504 30941 W AGOURA RD 236      WESTLAKE VILLAGE, CA 91361

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/30/2021 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 2/1/2022 Partial Approval CHRIS CHRISTENSEN
Green Building Rough 2/1/2022 Not Ready for Inspection CHRIS CHRISTENSEN
METHANE-Rough 2/1/2022 Approved CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 2/4/2022 Partial Approval CHRIS CHRISTENSEN
BUILDING-Rough-Frame 5/27/2022 Conditional Approval JOSEPH MCGARRY
ELECTRICAL-Rough 5/27/2022 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 5/27/2022 Approved JOSEPH MCGARRY
Green Building Rough 5/27/2022 Not Ready for Inspection JOSEPH MCGARRY
HVAC-Rough 5/27/2022 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 5/27/2022 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 6/24/2022 Conditional Approval JOSEPH MCGARRY
Insulation 6/24/2022 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 6/24/2022 Partial Approval JOSEPH MCGARRY
Drywall Nailing 7/11/2022 Approved ADAM ESCOTO
Green Building Rough 7/11/2022 Approved ADAM ESCOTO
Interior/Exterior Lathing 10/17/2022 Approved MICHAEL LEWIS
Shower Pan 10/17/2022 Approved MICHAEL LEWIS
ELECTRICAL-Final 3/14/2023 Approved MICHAEL LEWIS
HVAC-Final 3/14/2023 Partial Approval MICHAEL LEWIS
PLUMBING-Final 3/14/2023 Approved MICHAEL LEWIS
Service/Power Release 3/14/2023 Approved MICHAEL LEWIS
HVAC-Final 4/18/2023 Approved MICHAEL LEWIS
PLUMBING-Final 4/18/2023 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 5/4/2023 Approved LILIANA PORTILLO
ELECTRICAL-Final 5/4/2023 Approved LILIANA PORTILLO
Final 5/4/2023 OK to Issue CofO LILIANA PORTILLO
Footing/Foundation/Slab 5/4/2023 Approved LILIANA PORTILLO
Green Building Final 5/4/2023 Approved LILIANA PORTILLO
METHANE-Barrier 5/4/2023 Approved LILIANA PORTILLO
METHANE-Subgrade 5/4/2023 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 5/4/2023 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 5/4/2023 Approved LILIANA PORTILLO