13545 W GOLETA ST 91331

Certificate Information: 13545 W GOLETA ST 91331

Application / Permit
21014-20000-02430
Plan Check / Job No.
B21VN05966
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 18' X 20' DETACHED GARAGE AND ADD 20' X 26'-6" TO CREATE A (N) ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER WFPP AND ENGINEERING DETAILS. “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the issuance of the Certificate of Occupancy.”
Permit Issued
Issued on 4/25/2022
Issuing Office
Current Status
Issued on 4/25/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/14/2021 APPLICANT
Assigned to Plan Check Engineer 5/21/2021 RAPHAEL ROSAS
Corrections Issued 5/22/2021 RAPHAEL ROSAS
Building Plans Picked Up 7/19/2021 APPLICANT
Plan Check Approved 4/24/2022 RAPHAEL ROSAS
Issued 4/25/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 10/26/2021 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 11/8/2021 CARLOS AGUILERA
Sewer availability Cleared 11/8/2021 CARLOS AGUILERA
Construction near power lines Cleared 1/5/2022 RIDWAN HARDY
Roof/Waste drainage to street Cleared 4/7/2022 ABDULLAH SADOZAI

Contact Information

Contractor Owner-Builder       ,
Engineer Mah,, Edwin Poy-Dor; Lic. No.: C27141 1740 APPIAN WAY      MONTEBELLO, CA 90640

Inspector Information

MICHEL ABAJAN, (818) 374-9932 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/23/2023 Corrections Issued JOHN COLEMAN
Underground Mechanical 1/23/2023 Approved JOHN COLEMAN
Deputy Drilled-In Anchors 1/27/2023 Conditional Approval JUAN VALENZUELA
Footing/Foundation/Slab 3/8/2023 Approved MICHEL ABAJAN
Floor/Roof Diaphrgm/Shear Wall 4/4/2023 Corrections Issued MICHEL ABAJAN
Pre-Inspection 9/29/2023 Partial Inspection MICHEL ABAJAN
BUILDING-Rough-Frame 5/29/2024 Corrections Issued MICHEL ABAJAN
ELECTRICAL-Rough 5/29/2024 Approved MICHEL ABAJAN
Green Building Rough 5/29/2024 Not Ready for Inspection MICHEL ABAJAN
HVAC-Rough 5/29/2024 Approved MICHEL ABAJAN
MERV13>=Rough 5/29/2024 Approved MICHEL ABAJAN
PLUMBING-Rough 5/29/2024 Not Ready for Inspection MICHEL ABAJAN
BUILDING-Rough-Frame 6/14/2024 Approved MICHEL ABAJAN
Green Building Rough 6/14/2024 Approved MICHEL ABAJAN
PLUMBING-Rough 6/14/2024 Approved MICHEL ABAJAN
Interior/Exterior Lathing 8/8/2024 Approved MICHEL ABAJAN
Insulation 9/3/2024 Not Ready for Inspection MATTHEW NELSON
Drywall Nailing 9/11/2024 Approved JACK KARGODORIAN
Shower Pan 10/2/2024 Approved LOUIS ESCOTO
Final 12/27/2024 Corrections Issued ARAM AVEDISIAN
Green Building Final 12/27/2024 Not Ready for Inspection ARAM AVEDISIAN
MERV13>=Final 12/27/2024 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 12/27/2024 SGSOV Not Ready ARAM AVEDISIAN
Smoke Detectors 12/27/2024 Approved ARAM AVEDISIAN
ELECTRICAL-Final 1/3/2025 Approved MICHEL ABAJAN
Final 1/3/2025 Corrections Issued MICHEL ABAJAN
Green Building Final 1/3/2025 Approved MICHEL ABAJAN
HVAC-Final 1/3/2025 Approved MICHEL ABAJAN
PLUMBING-Final 1/3/2025 Approved MICHEL ABAJAN
SGSOV-Seismic Gas S/O Valve 1/3/2025 SGSOV Approved MICHEL ABAJAN
Final 1/10/2025 Corrections Issued MICHEL ABAJAN