4233 N NOELINE AVE 91436

Certificate Information: 4233 N NOELINE AVE 91436

Application / Permit
21014-20000-02239
Plan Check / Job No.
B21VN05499
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED INT/EXT REMODEL & ADDITION TO EX SFD: ENCLOSE & CONVERT PORTION OF EX BREAKFAST AREA WITH NEW ADDITION FOR A NEW FAMILY RM. CONVERT OFFICE RM & BATHRM INTO BEDRM. CONVERT EX LAUNDRY RM INTO BATHRM. CONVERT PORTION OF GARAGE SPACE INTO LAUNDRY RM. REMOVE EXISTING MASONRY FIREPLACE. REMODEL EX DINING AREA. ENCLOSE UNDER EXISTING ROOF/PATIO COVER FOR NEW STUDY RM & 1/2 BATHRM. RAISE FLR W/ SLAB OVER NEW BEDRM, BATHRM, LAUNDRY RM & EX DINING AREA PER PLAN. NEW ROOF FRAMING OVER NEW BED & BATH RMS.
Permit Issued
Issued on 8/28/2025
Issuing Office
Valley
Current Status
Issued on 8/28/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/7/2021 APPLICANT
Assigned to Plan Check Engineer 5/14/2021 RAPHAEL ROSAS
Corrections Issued 5/16/2021 RAPHAEL ROSAS
Plan Check Approved 7/16/2021 RAPHAEL ROSAS
Building Plans Picked Up 7/26/2021 APPLICANT
No Progress 5/16/2025 HAYATO TSUCHIYA
Plan Check Approved 8/21/2025 ARAMIK SHAHMIRZAIAN
Issued 8/28/2025 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 6/28/2021 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 6/29/2021 CARLOS AGUILERA
Sewer availability Cleared 6/29/2021 CARLOS AGUILERA
ZA Case Cleared 7/2/2021 LAUREN PADICK
Grading Pre-Inspection Cleared 7/16/2021 RAPHAEL ROSAS

Contact Information

Architect Lee,, Kenneth David; Lic. No.: C10141 16501 ACADEMIA DRIVE      ENCINO, CA 91436
Contractor Dva Construction; Lic. No.: 1141289-B 1140 CENTRE DRIVE #Z      WALNUT, CA 91789
Engineer Shakiban,, George; Lic. No.: C39908 23945 CALABASAS RD STE 101      CALABASAS, CA 91302

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 9/22/2025 Conditional Approval MORRIS JACKSON
Footing/Foundation/Slab 9/24/2025 Approved THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 10/2/2025 Partial Approval MORRIS JACKSON
PLUMBING-Rough 10/2/2025 Partial Approval MORRIS JACKSON
Floor/Roof Diaphrgm/Shear Wall 10/3/2025 Partial Approval THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 10/15/2025 Partial Approval MORRIS JACKSON
Floor/Roof Diaphrgm/Shear Wall 10/20/2025 Partial Inspection THOMAS FINNILA
Deputy Wood Construction 11/13/2025 Partial Approval SEAN WIRCH
Floor/Roof Diaphrgm/Shear Wall 11/17/2025 Not Ready for Inspection THOMAS FINNILA
HVAC-Rough 11/17/2025 Approved THOMAS FINNILA
PLUMBING-Rough 11/17/2025 Approved THOMAS FINNILA
BUILDING-Rough-Frame 11/20/2025 Partial Approval JUAN ALVARADO
Floor/Roof Diaphrgm/Shear Wall 11/20/2025 Approved JUAN ALVARADO
Green Building Rough 11/20/2025 Not Ready for Inspection JUAN ALVARADO
Wood Frame 11/20/2025 Partial Approval JUAN ALVARADO
BUILDING-Rough-Frame 11/25/2025 Conditional Approval THOMAS FINNILA
Interior/Exterior Lathing 11/25/2025 Partial Approval THOMAS FINNILA
Insulation 11/26/2025 Approved THOMAS FINNILA
Drywall Nailing 12/3/2025 Approved MORRIS JACKSON
Shower Pan 12/3/2025 Approved MORRIS JACKSON
Interior/Exterior Lathing 12/8/2025 Approved SEAN WIRCH
Shower Pan 12/8/2025 Approved SEAN WIRCH
BUILDING-Rough-Frame 5/26/2026 Approved SEAN WIRCH
ELECTRICAL-Final 5/26/2026 Corrections Issued SEAN WIRCH
Green Building Rough 5/26/2026 Approved SEAN WIRCH
HVAC-Final 5/26/2026 Approved SEAN WIRCH
PLUMBING-Final 5/26/2026 Approved SEAN WIRCH
Final 6/2/2026 Corrections Issued THOMAS FINNILA
Green Building Final 6/2/2026 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 6/2/2026 SGSOV No Gas THOMAS FINNILA
Smoke Detectors 6/2/2026 Approved THOMAS FINNILA