5642 N TROOST AVE 91601

Certificate Information: 5642 N TROOST AVE 91601

Application / Permit
21014-20000-01703
Plan Check / Job No.
B21VN04103
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION TO SFD OF A NEW BATHROOM AND LAUNDRY, ATTACHED TO THE (E) BEDROOM. AND INTERIOR REMODEL TO THE (E) BATHROOM. ALL STRUCTURAL WORK PER ENGINEERING
Permit Issued
Issued on 7/14/2021
Issuing Office
Current Status
CofO Issued on 1/21/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/13/2021 APPLICANT
Assigned to Plan Check Engineer 4/14/2021 LUISANGEL VALENZUELA
Corrections Issued 4/14/2021 LUISANGEL VALENZUELA
Plan Check Approved 5/6/2021 LUISANGEL VALENZUELA
Building Plans Picked Up 5/6/2021 APPLICANT
Issued 7/14/2021 APPLICANT
CofO in Progress 1/17/2023 JACK KARGODORIAN
CofO Issued 1/21/2023 MICHAEL SMITH
Permit Finaled 1/21/2023 MICHAEL SMITH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/15/2021 LEE GUILBEAUX
Roof/Waste drainage to street Cleared 4/15/2021 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 4/15/2021 LEE GUILBEAUX

Contact Information

Contractor Design Pro & Starlite Inc; Lic. No.: 948621-B 2951 HONOLULU AVENUE UNIT F      LA CRESCENTA, CA 91214
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

JAVIER RAMOS JR, (818) 374-1163 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 7/22/2021 Conditional Approval DANIEL ORRANTE
Footing/Foundation/Slab 8/4/2021 Conditional Approval THOMAS FINNILA
PLUMBING-Rough 8/16/2021 Partial Approval CHRISTOPHER DELLEFIELD
Wood Frame 8/16/2021 Partial Approval CHRISTOPHER DELLEFIELD
Insulation 8/19/2021 Partial Approval LILIANA PORTILLO
Wood Frame 8/19/2021 Partial Approval LILIANA PORTILLO
Rough-Elec/Plmb/HVAC 9/20/2021 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 9/22/2021 Corrections Issued THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 9/22/2021 Not Ready for Inspection THOMAS FINNILA
Green Building Rough 9/22/2021 Not Ready for Inspection THOMAS FINNILA
MERV13>=Rough 9/22/2021 Not Ready for Inspection THOMAS FINNILA
BUILDING-Rough-Frame 9/28/2021 Not Ready for Inspection THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 9/28/2021 Partial Approval THOMAS FINNILA
Green Building Rough 9/28/2021 Not Ready for Inspection THOMAS FINNILA
MERV13>=Rough 9/28/2021 Not Ready for Inspection THOMAS FINNILA
BUILDING-Rough-Frame 10/5/2021 Approved ARAM AVEDISIAN
Green Building Rough 10/5/2021 Not Ready for Inspection ARAM AVEDISIAN
MERV13>=Rough 10/5/2021 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 10/13/2021 Approved CALEB MEISTER
Shower Pan 10/13/2021 Approved CALEB MEISTER
Insulation 10/18/2021 Approved MISAEL ESPARZA
Drywall Nailing 10/25/2021 Approved CHRISTOPHER DELLEFIELD
Green Building Rough 10/25/2021 Approved CHRISTOPHER DELLEFIELD
Footing/Foundation/Slab 1/14/2022 Approved THOMAS FINNILA
MERV13>=Final 1/14/2022 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 1/14/2022 SGSOV Not Ready THOMAS FINNILA
Final 2/4/2022 Corrections Issued THOMAS FINNILA
Green Building Final 2/4/2022 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 2/4/2022 SGSOV Approved THOMAS FINNILA
Smoke Detectors 2/4/2022 Approved THOMAS FINNILA
Final 1/17/2023 OK to Issue CofO JACK KARGODORIAN