12178 N BEAUFAIT AVE 91326

Certificate Information: 12178 N BEAUFAIT AVE 91326

Application / Permit
21014-20000-01694
Plan Check / Job No.
B21VN04085
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
FIRE DAMAGED REPAIR AT (E) SFD AT MASTER BEDROOM , LIVING ROOM AND DINING ROOM , NEW 36'5-1/4"' X 54'4-3/4" IRREGULAR SHAPED FIRST FLOOR ADDITION TO (E) SFD TO CREATE (2) BEDROOMS , PANTRY , POWDER ROOM , ENTRY , INTERIOR REMODEL TO (E) SFD TO RELOCATE AND REMODEL DINING ROOM AND KITCHEN , REMODEL (2) BEDROOMS ,(2) BATHROOMS, CREATE LAUNDRY ROOM , REMOVE (1) BEDROOM , CONVERT 6'4-1/4" X 5'2-1/2" PORTION OF (E) GARAGE TO STORAGE , CONVERT IRREGULAR SHAPED 11'10-1/2" X 6'4-1/4" PORTION OF (E) GARAGE TO LIVABLE SPACE , NFPA-13D FIRE SPRINKLERS REQUIRED THROUGHOUT , ALL WORK PER ENGINEERING
Permit Issued
Issued on 10/5/2021
Issuing Office
Current Status
Issued on 10/5/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 4/13/2021 APPLICANT
Assigned to Plan Check Engineer 4/15/2021 RARES BODEA
Corrections Issued 4/18/2021 RARES BODEA
Quality Review Completed 4/23/2021 STEVEN KIM
Applicant returned to address corrections 8/19/2021 RARES BODEA
Applicant returned to address corrections 9/8/2021 RARES BODEA
Plan Check Approved 10/4/2021 RARES BODEA
Issued 10/5/2021 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 5/21/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 5/21/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 5/21/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 5/21/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 5/21/2021 LEE GUILBEAUX
Sewer availability Cleared 5/21/2021 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 5/24/2021 LEE GUILBEAUX
ZA Case Cleared 5/25/2021 JOE LUCKEY
Low Impact Development Cleared 8/14/2021 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 8/19/2021 GABRIEL ROBLES
GPI Written Notices Cleared 8/23/2021 RARES BODEA
Grading Pre-Inspection Cleared 8/23/2021 RARES BODEA
Distance to fire station Cleared 8/25/2021 KURT CORRAL
Hydrant and Access approval Cleared 8/25/2021 KURT CORRAL

Contact Information

Contractor Tri Tech Restoration & Construction Co Inc; Lic. No.: 501801-B 3301 N SAN FERNANDO BLVD      BURBANK, CA 91504
Engineer Berkoz,, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356

Inspector Information

JACK KARGODORIAN, (818) 774-4319 Office Hours: 7:00-8:00 AM MON-FRI
KRISTEN CAUSEY, (818) 774-4319 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/25/2022 Approved DAVID SCANTLIN
Pre-Inspection 1/26/2022 Not Ready for Inspection DAVID SCANTLIN
Underground Mechanical 2/24/2022 Approved DAVID SCANTLIN
Footing/Foundation/Slab 2/28/2022 Partial Approval DAVID SCANTLIN
Deputy Reinf. Concrete 3/11/2022 Conditional Approval JUSTIN HAWLEY
Floor/Roof Diaphrgm/Shear Wall 5/17/2022 Approved DAVID SCANTLIN
ELECTRICAL-Rough 7/12/2022 Approved DAVID SCANTLIN
Gas Test 7/12/2022 Approved DAVID SCANTLIN
PLUMBING-Rough 7/12/2022 Approved DAVID SCANTLIN
Interior/Exterior Lathing 7/25/2022 No Access for Inspection KRISTEN CAUSEY
Shower Pan 7/25/2022 No Access for Inspection KRISTEN CAUSEY
Service/Power Release 8/1/2022 Not Ready for Inspection SEAN WIRCH
Shower Pan 8/1/2022 No Access for Inspection SEAN WIRCH
Interior/Exterior Lathing 8/9/2022 Partial Approval KRISTEN CAUSEY
Shower Pan 8/9/2022 Approved KRISTEN CAUSEY
Interior/Exterior Lathing 8/23/2022 Approved DAVID SCANTLIN
Insulation 8/29/2022 Conditional Approval DAVID SCANTLIN
Service/Power Release 8/29/2022 Approved DAVID SCANTLIN
BUILDING-Rough-Frame 9/7/2022 Approved DAVID SCANTLIN
Drywall Nailing 9/7/2022 Approved DAVID SCANTLIN
Green Building Rough 9/7/2022 Approved DAVID SCANTLIN
Verify Sprinkler Sign Off 9/7/2022 Approved DAVID SCANTLIN
Gas Test 11/7/2022 Approved HENRY KIM
SGSOV-Seismic Gas S/O Valve 11/7/2022 SGSOV Not Ready HENRY KIM
SGSOV-Seismic Gas S/O Valve 12/5/2022 SGSOV Approved JUSTIN HAWLEY
Final 2/14/2024 Corrections Issued STEVEN BACK
Footing/Foundation/Slab 2/14/2024 Approved STEVEN BACK
Green Building Final 2/14/2024 Not Ready for Inspection STEVEN BACK
Smoke Detectors 2/14/2024 Approved STEVEN BACK
Final 7/24/2024 Not Ready for Inspection DAVID SCANTLIN
Green Building Final 7/24/2024 Not Ready for Inspection DAVID SCANTLIN