4650 N NOBLE AVE 91403
Certificate Information: 4650 N NOBLE AVE 91403
- Application / Permit
- 21014-20000-01061
- Plan Check / Job No.
- B21VN02609
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Accessory Dwelling Unit
- Work Description
- CONVERT (E) GARAGE TO IRREGULAR SHAPED ACCESSORY DWELLING UNIT WITH ADDITION (863 SQ. FT. TOTAL) PER LAMC 12.22 A33 (c) AND (d). ALL WORK PER ENGINEERING. The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.
- Permit Issued
- Issued on 4/4/2024
- Issuing Office
- Valley
- Current Status
- Issued on 4/4/2024
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 3/10/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 4/8/2021 | COLIN LOREDO |
| Corrections Issued | 4/12/2021 | COLIN LOREDO |
| Quality Review Completed | 5/5/2021 | OMID HEDAYAT |
| Applicant returned to address corrections | 6/3/2022 | COLIN LOREDO |
| Plan Check Approved | 6/3/2022 | COLIN LOREDO |
| Issued | 4/4/2024 | APPLICANT |
Permit Application Clearance Information
| Address approval | Cleared | 1/15/2022 | AMIR KASHFI |
| Sewer availability | Cleared | 3/8/2022 | AMIR KASHFI |
| Construction near power lines | Cleared | 3/24/2022 | RIDWAN HARDY |
| Roof/Waste drainage to street | Cleared | 5/19/2022 | ABDULLAH SADOZAI |
| Tenant Habitability Plan | Cleared | 5/20/2022 | RICARDO BOHORQUEZ |
| Eng Process Fee Ord 176,300 | Cleared | 5/31/2022 | ABDULLAH SADOZAI |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Youm,, Moung Han; Lic. No.: C74086 | 309 S BERENDO ST APT 6 LOS ANGELES, CA 90020 |
Inspector Information
| RAUL OLAGI, (818) 374-1166 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| PLUMBING-Rough | 6/8/2026 |
Inspection Request History
| Pre-Inspection | 9/16/2025 | Approved | JACK KARGODORIAN |
| Pre-Inspection | 4/10/2026 | Partial Approval | JAVIER RAMOS JR |
| Footing/Foundation/Slab | 4/22/2026 | Partial Approval | MICHAEL CORTEZ |
| PLUMBING-Rough | 5/20/2026 | Corrections Issued | MATTHEW NELSON |
| Wood Frame | 5/20/2026 | Not Ready for Inspection | MATTHEW NELSON |
| Floor/Roof Diaphrgm/Shear Wall | 5/27/2026 | Corrections Issued | MISAEL ESPARZA |
| Floor/Roof Diaphrgm/Shear Wall | 6/2/2026 | Not Ready for Inspection | MISAEL ESPARZA |
| Floor/Roof Diaphrgm/Shear Wall | 6/3/2026 | Partial Approval | MISAEL ESPARZA |