7843 N BOTHWELL ROAD 91335

Certificate Information: 7843 N BOTHWELL ROAD 91335

Application / Permit
21014-20000-00538
Plan Check / Job No.
B21VN01417
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT 20'-2" X 22'-2" (E) DETACHED GARAGE AND ADD 5'-6" X 22'-2" INTO A (N) ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING.
Permit Issued
Issued on 4/19/2021
Issuing Office
Current Status
CofO Issued on 8/20/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/5/2021 APPLICANT
Assigned to Plan Check Engineer 2/24/2021 RAPHAEL ROSAS
Corrections Issued 2/25/2021 RAPHAEL ROSAS
Plan Check Approved 3/24/2021 RAPHAEL ROSAS
Building Plans Picked Up 3/26/2021 APPLICANT
Issued 4/19/2021 APPLICANT
CofO in Progress 8/20/2021 VINCENT HANLEY
Permit Finaled 8/20/2021 MICHAEL SMITH
CofO Issued 8/20/2021 MICHAEL SMITH
Permit Finaled 8/20/2021 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 3/4/2021 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 3/4/2021 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 3/8/2021 ADRIAN CASTRO
Sewer availability Cleared 3/8/2021 ADRIAN CASTRO

Contact Information

Contractor Cgh Solutions; Lic. No.: 1043877-B 7020 HAYVENHURST AVE STE B      VAN NUYS, CA 91406
Engineer Ramirez, Cid, Jose Carlos; Lic. No.: C91046 5164 N RATON CIR      LONG BEACH, CA 90807

Inspector Information

ARUTYUN MADATYAN, (818) 774-4307 Office Hours: 7:00-8:00 AM MON-FRI
JUAN ALVARADO, (818) 774-4307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/10/2021 Approved VINCENT HANLEY
PLUMBING-Rough 5/10/2021 Partial Approval VINCENT HANLEY
Sewer 5/10/2021 Approved VINCENT HANLEY
PLUMBING-Rough 5/17/2021 Corrections Issued STEPHANIE SWANSON
Underground Mechanical 5/17/2021 Corrections Issued STEPHANIE SWANSON
Sewer 5/21/2021 Approved VINCENT HANLEY
Underground Mechanical 5/21/2021 Partial Approval VINCENT HANLEY
BUILDING-Rough-Frame 5/28/2021 Not Ready for Inspection VINCENT HANLEY
ELECTRICAL-Rough 5/28/2021 Not Ready for Inspection VINCENT HANLEY
Green Building Rough 5/28/2021 Not Ready for Inspection VINCENT HANLEY
PLUMBING-Rough 5/28/2021 Not Ready for Inspection VINCENT HANLEY
BUILDING-Rough-Frame 6/7/2021 Not Ready for Inspection DAVID SCANTLIN
ELECTRICAL-Rough 6/7/2021 Corrections Issued DAVID SCANTLIN
Green Building Rough 6/7/2021 Not Ready for Inspection DAVID SCANTLIN
PLUMBING-Rough 6/7/2021 Approved DAVID SCANTLIN
ELECTRICAL-Rough 6/14/2021 Approved VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 6/14/2021 Approved VINCENT HANLEY
Green Building Rough 6/14/2021 Not Ready for Inspection VINCENT HANLEY
HVAC-Rough 6/14/2021 Approved VINCENT HANLEY
BUILDING-Rough-Frame 6/18/2021 Approved VINCENT HANLEY
Green Building Rough 6/18/2021 Approved VINCENT HANLEY
Insulation 6/18/2021 Approved VINCENT HANLEY
Interior/Exterior Lathing 6/18/2021 Partial Approval VINCENT HANLEY
Drywall Nailing 6/23/2021 Corrections Issued SHAVONNE ESPINOZA
Drywall Nailing 6/28/2021 Partial Approval SHAVONNE ESPINOZA
Pre-Inspection 6/28/2021 Partial Inspection RYAN SALAZAR
Drywall Nailing 6/30/2021 Corrections Issued SHAVONNE ESPINOZA
Drywall Nailing 7/2/2021 Approved VINCENT HANLEY
Interior/Exterior Lathing 7/2/2021 Approved VINCENT HANLEY
ELECTRICAL-Final 8/19/2021 Approved VINCENT HANLEY
Final 8/19/2021 Corrections Issued VINCENT HANLEY
Gas Test 8/19/2021 Approved VINCENT HANLEY
Green Building Final 8/19/2021 Approved VINCENT HANLEY
HVAC-Final 8/19/2021 Corrections Issued VINCENT HANLEY
PLUMBING-Final 8/19/2021 Approved VINCENT HANLEY
SGSOV-Seismic Gas S/O Valve 8/19/2021 SGSOV Approved VINCENT HANLEY
Smoke Detectors 8/19/2021 Approved VINCENT HANLEY
Final 8/20/2021 OK to Issue CofO VINCENT HANLEY