9150 S HAAS AVE 90047

Certificate Information: 9150 S HAAS AVE 90047

Application / Permit
21014-20000-00093
Plan Check / Job No.
B21VN00206
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED 6'-1" X 10'-5" ADDITION FOR (N) BATHROOM AND 15' X 16' ADDITION FOR (N) PATIO COVER TO (E) SFD. REMODEL BEDROOM TO ENLARGE CLOSET. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 3/16/2021
Issuing Office
Current Status
CofO Issued on 9/13/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/13/2021 APPLICANT
Assigned to Plan Check Engineer 1/26/2021 RAPHAEL ROSAS
Corrections Issued 1/26/2021 RAPHAEL ROSAS
Plan Check Approved 2/23/2021 RAPHAEL ROSAS
Building Plans Picked Up 2/23/2021 APPLICANT
Issued 3/16/2021 APPLICANT
CofO in Progress 9/12/2025 JOSE MACIAS
Permit Finaled 9/13/2025 DEROLD HAUFF
Permit Finaled 9/13/2025 DEROLD HAUFF
CofO Issued 9/13/2025 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 2/4/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 2/5/2021 RENZ SORIANO

Contact Information

Contractor Seal Construction; Lic. No.: 695824-B 4774 PARK GRANADA #9291      CALABASAS, CA 91372
Engineer Jack,, Jeffery C; Lic. No.: C69824 1823 E GLOUCESTER DR      BOISE, ID 83706
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/24/2021 Not Ready for Inspection FREDDIE RIVERA
METHANE-Barrier 3/24/2021 Approved FREDDIE RIVERA
METHANE-Subgrade 3/24/2021 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 4/21/2021 Conditional Approval FREDDIE RIVERA
METHANE-Rough 4/21/2021 Approved FREDDIE RIVERA
METHANE-Subgrade 4/21/2021 Approved FREDDIE RIVERA
Smoke Detectors 4/21/2021 Corrections Issued FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 1/5/2022 Not Ready for Inspection FREDDIE RIVERA
PLUMBING-Rough 1/5/2022 Corrections Issued FREDDIE RIVERA
PLUMBING-Rough 1/10/2022 Approved SHAVONNE ESPINOZA
ELECTRICAL-Rough 3/30/2022 Approved HORACE FULTZ
Floor/Roof Diaphrgm/Shear Wall 3/30/2022 Partial Approval HORACE FULTZ
ELECTRICAL-Rough 5/2/2022 Approved ENRIQUE MIRELES
Green Building Rough 5/2/2022 Approved ENRIQUE MIRELES
METHANE-Rough 5/2/2022 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 5/16/2022 Approved ENRIQUE MIRELES
Drywall Nailing 7/1/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 7/1/2022 Approved ENRIQUE MIRELES
Shower Pan 7/1/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 7/18/2022 Approved ENRIQUE MIRELES
Pre-Inspection 8/30/2022 Approved ENRIQUE MIRELES
ELECTRICAL-Rough 10/6/2022 Approved ENRIQUE MIRELES
Insulation 10/6/2022 Approved ENRIQUE MIRELES
PLUMBING-Rough 10/6/2022 Approved ENRIQUE MIRELES
Rough-Elec/Plmb/HVAC 10/6/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 10/13/2022 Approved ENRIQUE MIRELES
Shower Pan 10/13/2022 Approved ENRIQUE MIRELES
Drywall Nailing 10/24/2022 Approved RYAN SALAZAR
Interior/Exterior Lathing 10/24/2022 Approved RYAN SALAZAR
Final 12/22/2022 Corrections Issued ENRIQUE MIRELES
Footing/Foundation/Slab 12/22/2022 Approved ENRIQUE MIRELES
Green Building Final 12/22/2022 Approved ENRIQUE MIRELES
Smoke Detectors 12/22/2022 Approved ENRIQUE MIRELES
Final 1/3/2023 Conditional Approval ENRIQUE MIRELES
Final 1/4/2023 Corrections Issued ENRIQUE MIRELES
Final 9/11/2025 OK to Issue CofO JOSE MACIAS