711 1/2-1/4 W 69TH ST 90044

Certificate Information: 711 1/2-1/4 W 69TH ST 90044

Application / Permit
21014-10000-06046
Plan Check / Job No.
B21LA22725
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Remove walls and roof of existing 2-car garage to build two ADUs per GCS 65852.2(e)(1)(D) and LAMC 12.22 A.33(c)(d) and (g)
Permit Issued
Issued on 11/1/2022
Issuing Office
Metro
Current Status
CofO Issued on 4/4/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/3/2021 APPLICANT
Assigned to Plan Check Engineer 12/7/2021 LUKE GONZALES
Corrections Issued 12/8/2021 LUKE GONZALES
Building Plans Picked Up 12/10/2021 APPLICANT
Applicant returned to address corrections 10/25/2022 KHUONG TRUONG
Plan Check Approved 10/28/2022 LAWRENCE QUIRANTE
Issued 11/1/2022 APPLICANT
CofO Issued 4/4/2024 RONALD MYRICK
Permit Finaled 4/4/2024 RONALD MYRICK

Permit Application Clearance Information

Construction near power lines Cleared 1/4/2022 RIDWAN HARDY
Address approval Cleared 7/14/2022 STEVE MELGAR
Roof/Waste drainage to street Cleared 7/14/2022 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 7/18/2022 STEVE MELGAR
Sewer availability Cleared 7/18/2022 STEVE MELGAR
Tenant Habitability Plan Cleared 9/28/2022 MICHAEL SOTO
Hydrant and Access approval Cleared 10/21/2022 GILBERT URREA

Contact Information

Contractor Owner-Builder       ,
Engineer Kim,, Hong Kook; Lic. No.: C64529 3600 WILSHIRE BLVD STE 1903      LOS ANGELES, CA 90010

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/13/2023 No Access for Inspection LILIANA PORTILLO
Footing/Foundation/Slab 2/14/2023 No Access for Inspection LILIANA PORTILLO
Footing/Foundation/Slab 2/17/2023 Approved JAMES CHAVEZ
Pre-Inspection 2/24/2023 Partial Inspection LILIANA PORTILLO
Pre-Inspection 3/6/2023 Partial Inspection LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Approved MICHAEL LEWIS
Green Building Rough 6/13/2023 Not Ready for Inspection MICHAEL LEWIS
Wood Frame 6/13/2023 Not Ready for Inspection MICHAEL LEWIS
Green Building Rough 6/20/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 6/20/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 6/22/2023 Not Ready for Inspection STUART CHAPMAN
Insulation 6/28/2023 No Access for Inspection MICHAEL LEWIS
Insulation 7/6/2023 Approved MICHAEL LEWIS
Drywall Nailing 7/24/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 7/31/2023 Partial Approval STUART CHAPMAN
Interior/Exterior Lathing 8/18/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 10/13/2023 Approved CRAIG DAVIS
Final 3/8/2024 Corrections Issued CRAIG DAVIS
Green Building Final 3/8/2024 Corrections Issued CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 3/8/2024 SGSOV Not Ready CRAIG DAVIS
Smoke Detectors 3/8/2024 Approved CRAIG DAVIS
Wood Frame 3/8/2024 Approved CRAIG DAVIS
Final 3/18/2024 Not Ready for Inspection JOSEPH MCGARRY
Green Building Final 3/18/2024 Not Ready for Inspection JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 3/18/2024 SGSOV Not Ready JOSEPH MCGARRY
Final 3/22/2024 Partial Inspection CRAIG DAVIS
Green Building Final 3/22/2024 Corrections Issued CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 3/22/2024 SGSOV Approved CRAIG DAVIS
Final 4/1/2024 Partial Approval CRAIG DAVIS
Green Building Final 4/1/2024 Approved CRAIG DAVIS