2307 S PARNELL AVE 90064

Certificate Information: 2307 S PARNELL AVE 90064

Application / Permit
21014-10000-05138
Plan Check / Job No.
B21LA19152
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior remodel throughout dwelling with addition to the rear of dwelling. Add doors to existing garage.
Permit Issued
Issued on 1/3/2022
Issuing Office
Current Status
CofO Issued on 9/26/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/14/2021 APPLICANT
Assigned to Plan Check Engineer 10/19/2021 RAHEL BEYENE
Corrections Issued 10/19/2021 RAHEL BEYENE
Applicant returned to address corrections 11/23/2021 RICARDO RAMIREZ
Plan Check Approved 12/14/2021 RICARDO RAMIREZ
Building Plans Picked Up 12/16/2021 APPLICANT
Issued 1/3/2022 APPLICANT
CofO in Progress 9/26/2022 MICHAEL PELHAM
Permit Finaled 9/26/2022 DANIEL ORRANTE
CofO Issued 9/26/2022 DANIEL ORRANTE
Permit Finaled 9/26/2022 DANIEL ORRANTE

Permit Application Clearance Information

Sewer availability Cleared 11/8/2021 HISASHI KOBAYAKAWA
Eng Process Fee Ord 176,300 Cleared 11/9/2021 HISASHI KOBAYAKAWA
Roof/Waste drainage to street Cleared 11/18/2021 HISASHI KOBAYAKAWA
Grading Pre-Inspection Cleared 11/23/2021 RICARDO RAMIREZ
Miscellaneous Cleared 12/8/2021 JENSON LEE

Contact Information

Architect Guban,, Steven; Lic. No.: C33046 2608 BEACH AVENUE      VENICE, CA 90291
Contractor Farnsworth Builders Inc; Lic. No.: 947797-B 4943 MCCONNELL AVE UNIT E      LOS ANGELES, CA 90066

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/1/2022 Approved MICHAEL PELHAM
Footing/Foundation/Slab 3/1/2022 Corrections Issued OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 3/4/2022 Corrections Issued BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 3/9/2022 Approved BRENDAN LOONEY
BUILDING-Rough-Frame 3/14/2022 Partial Approval BRENDAN LOONEY
FLOOD-Proofing Certificate 3/14/2022 Approved BRENDAN LOONEY
METHANE-Rough 3/14/2022 Approved BRENDAN LOONEY
Wood Frame 3/17/2022 Partial Approval BRENDAN LOONEY
BUILDING-Rough-Frame 4/19/2022 Corrections Issued BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 4/19/2022 Partial Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 5/11/2022 Corrections Issued BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 6/1/2022 Approved BRENDAN LOONEY
PLUMBING-Rough 6/3/2022 Corrections Issued BRENDAN LOONEY
PLUMBING-Rough 6/7/2022 Approved BRENDAN LOONEY
Shower Pan 6/7/2022 Approved BRENDAN LOONEY
Interior/Exterior Lathing 6/14/2022 Partial Approval STEPHANIE SWANSON
ELECTRICAL-Rough 6/15/2022 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 6/15/2022 Corrections Issued STEPHANIE SWANSON
Interior/Exterior Lathing 6/16/2022 Corrections Issued GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 6/17/2022 Conditional Approval JOHN KIDWELL
ELECTRICAL-Rough 6/17/2022 Approved JOHN KIDWELL
Interior/Exterior Lathing 6/20/2022 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 6/23/2022 Approved BRENDAN LOONEY
Insulation 6/23/2022 Approved BRENDAN LOONEY
Interior/Exterior Lathing 6/30/2022 Approved BRENDAN LOONEY
Drywall Nailing 7/5/2022 Approved KEVIN SARGSYAN
Gas Test 8/3/2022 Approved GERMAN RODRIGUEZ MENDOZA
ELECTRICAL-Final 9/13/2022 Corrections Issued STEPHANIE SWANSON
Final 9/13/2022 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 9/13/2022 Approved STEPHANIE SWANSON
HVAC-Final 9/13/2022 Corrections Issued STEPHANIE SWANSON
METHANE-Barrier 9/13/2022 Approved STEPHANIE SWANSON
METHANE-Subgrade 9/13/2022 Approved STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 9/13/2022 SGSOV Not Ready STEPHANIE SWANSON
Smoke Detectors 9/13/2022 Approved STEPHANIE SWANSON
ELECTRICAL-Final 9/14/2022 Approved STEPHANIE SWANSON
Final 9/14/2022 Corrections Issued STEPHANIE SWANSON
HVAC-Final 9/14/2022 Approved STEPHANIE SWANSON
PLUMBING-Final 9/14/2022 Approved STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 9/14/2022 SGSOV Approved STEPHANIE SWANSON
Service/Power Release 9/14/2022 Approved STEPHANIE SWANSON
Service/Power Release 9/15/2022 No Access for Inspection CHRISTOPHER WILSON
Final 9/26/2022 Conditional Approval MICHAEL PELHAM