|
Deputy Drilled-In Anchors
|
3/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/15/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Pre-Inspection
|
3/15/2023
|
Approved
|
ALFREDO LOPEZ
|
|
Special/Order Compliance
|
3/15/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
3/20/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
3/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
3/29/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Footing/Foundation/Slab
|
3/29/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
4/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
4/26/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
4/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
4/28/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Green Building Rough
|
4/28/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
4/28/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
5/5/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
5/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
5/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
5/11/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
5/12/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Green Building Rough
|
5/12/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
5/12/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
5/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
5/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Reinforced Masonry Frame
|
5/31/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Green Building Rough
|
6/2/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
6/2/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
6/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
6/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
6/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
6/12/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
6/12/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
6/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
6/16/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
6/16/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Green Building Rough
|
6/23/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
6/23/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
6/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Green Building Rough
|
6/30/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
6/30/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Green Building Rough
|
7/10/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
7/10/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Special/Order Compliance
|
7/11/2023
|
Approved
|
ALFREDO LOPEZ
|
|
Green Building Rough
|
7/19/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
7/19/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
7/31/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Green Building Rough
|
7/31/2023
|
Approved
|
KATY RAMIREZ
|
|
Reinforced Concrete Frame
|
7/31/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
8/3/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
8/3/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/4/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
8/7/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Masonry Frame
|
8/9/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/10/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
8/11/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
8/11/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/15/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
8/16/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
8/17/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
8/21/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
8/21/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Footing/Foundation/Slab
|
8/21/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
8/21/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/22/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/24/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
8/25/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/29/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
8/30/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
8/31/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
8/31/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
8/31/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/1/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
9/5/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
9/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
9/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
9/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/11/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/11/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/12/2023
|
Conditional Approval
|
DARRYL ARNOLD
|
|
Footing/Foundation/Slab
|
9/12/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/14/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
9/14/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Insulation
|
9/14/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
9/14/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
9/18/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/20/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
9/22/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
9/22/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
9/22/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
9/22/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/25/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
9/26/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
9/27/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
9/27/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
9/27/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
10/3/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
10/4/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
10/4/2023
|
Not Ready for Inspection
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
10/6/2023
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Deputy Drilled-In Anchors
|
10/10/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
10/10/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
10/11/2023
|
Partial Inspection
|
RICARDO ROBLES
|
|
Deputy Steel/Welding
|
10/16/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
10/20/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
10/23/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
10/23/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
10/23/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
10/23/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
10/23/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Structural Steel Frame
|
10/23/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
10/25/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Insulation
|
10/25/2023
|
Approved
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
10/25/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
10/30/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
10/30/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Steel/Welding
|
11/1/2023
|
Conditional Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
11/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
11/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
11/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
11/13/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
11/13/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
11/13/2023
|
Partial Inspection
|
ALFREDO LOPEZ
|
|
Structural Steel Frame
|
11/13/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
11/21/2023
|
Approved
|
DARRYL ARNOLD
|
|
Insulation
|
11/21/2023
|
Approved
|
DARRYL ARNOLD
|
|
Light Gage Steel Frame
|
11/21/2023
|
Approved
|
DARRYL ARNOLD
|
|
Drywall Nailing
|
11/29/2023
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
12/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
12/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Light Gage Steel Frame
|
12/6/2023
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Drilled-In Anchors
|
12/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/19/2023
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
12/19/2023
|
Partial Approval
|
RICARDO ROBLES
|
|
Insulation
|
12/19/2023
|
Partial Approval
|
RICARDO ROBLES
|
|
Light Gage Steel Frame
|
12/19/2023
|
Partial Approval
|
RICARDO ROBLES
|
|
Deputy Drilled-In Anchors
|
12/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
12/26/2023
|
Conditional Approval
|
RICARDO ROBLES
|
|
Deputy Drilled-In Anchors
|
12/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
1/5/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Insulation
|
1/5/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
1/5/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
1/11/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Insulation
|
1/11/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Light Gage Steel Frame
|
1/11/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Concrete
|
1/17/2024
|
Approved
|
RICARDO ROBLES
|
|
Drywall Nailing
|
1/17/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Light Gage Steel Frame
|
1/17/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Reinforced Concrete Frame
|
1/18/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Concrete
|
1/23/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
1/26/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Reinforced Concrete Frame
|
1/26/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
1/31/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Deputy Reinf. Concrete
|
2/2/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
2/7/2024
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Deputy Reinf. Concrete
|
2/12/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
2/12/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Insulation
|
2/12/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
2/12/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Deputy Reinf. Concrete
|
2/15/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Reinforced Concrete Frame
|
2/15/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
2/28/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
2/28/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
3/6/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
3/6/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
3/14/2024
|
Partial Approval
|
JACOB MYERS
|
|
Insulation
|
3/14/2024
|
Partial Approval
|
JACOB MYERS
|
|
Deputy Steel/Welding
|
3/19/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
3/20/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Drywall Nailing
|
3/20/2024
|
Partial Approval
|
JACOB MYERS
|
|
Reinforced Concrete Frame
|
3/28/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
4/1/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
4/1/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
4/1/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
T-Bar Ceiling
|
4/1/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
4/3/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/16/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
4/16/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
5/2/2024
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
5/16/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
5/16/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Structural Steel Frame
|
5/16/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
6/11/2024
|
Partial Approval
|
JACOB MYERS
|
|
Light Gage Steel Frame
|
6/11/2024
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
7/2/2024
|
Partial Approval
|
JACOB MYERS
|
|
Insulation
|
7/2/2024
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
7/12/2024
|
Partial Approval
|
JACOB MYERS
|
|
Drywall Nailing
|
7/22/2024
|
Partial Approval
|
JACOB MYERS
|
|
Footing/Foundation/Slab
|
7/24/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
8/7/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
8/7/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Deputy Fireproofing
|
8/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
8/13/2024
|
Partial Approval
|
JACOB MYERS
|
|
Footing/Foundation/Slab
|
8/21/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
9/4/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Light Gage Steel Frame
|
9/4/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Reinforced Concrete Frame
|
9/9/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
9/26/2024
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
10/8/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
10/15/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
10/30/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Interior/Exterior Lathing
|
10/30/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
10/30/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Reinforced Concrete Frame
|
11/8/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
12/9/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
12/9/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Structural Steel Frame
|
12/9/2024
|
Approved
|
MARTIN TAVITIAN
|
|
Deputy Drilled-In Anchors
|
12/27/2024
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
12/27/2024
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
1/2/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
1/9/2025
|
OK to Expire Permit
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
1/13/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
1/13/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Reinforced Masonry Frame
|
1/14/2025
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Deputy Reinf. Masonry
|
1/17/2025
|
Conditional Approval
|
TIMOTHY POWELL
|
|
Footing/Foundation/Slab
|
1/17/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Reinforced Masonry Frame
|
1/17/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
1/21/2025
|
Not Ready for Inspection
|
PAUL BAZERKANIAN
|
|
Light Gage Steel Frame
|
1/21/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
1/24/2025
|
Approved
|
DARRYL ARNOLD
|
|
Reinforced Masonry Frame
|
1/24/2025
|
Approved
|
DARRYL ARNOLD
|
|
Drywall Nailing
|
1/29/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
1/29/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Reinforced Masonry Frame
|
1/29/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Footing/Foundation/Slab
|
2/3/2025
|
Not Ready for Inspection
|
CHRISTOPHER BLACKWOOD
|
|
Drywall Nailing
|
2/4/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Pre-Inspection
|
2/6/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
2/10/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
2/18/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
2/24/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Deputy Drilled-In Anchors
|
2/26/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Reinforced Concrete Frame
|
2/26/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
3/11/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
3/12/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
3/17/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Interior/Exterior Lathing
|
3/20/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
4/1/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Footing/Foundation/Slab
|
4/9/2025
|
Partial Approval
|
CHRISTOPHER BLACKWOOD
|
|
Reinforced Masonry Frame
|
4/15/2025
|
Partial Approval
|
CHRISTOPHER BLACKWOOD
|
|
Reinforced Masonry Frame
|
4/18/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Light Gage Steel Frame
|
5/1/2025
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Reinforced Concrete Frame
|
5/1/2025
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Insulation
|
5/5/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
5/13/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Interior/Exterior Lathing
|
5/16/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Light Gage Steel Frame
|
5/16/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Footing/Foundation/Slab
|
5/27/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Insulation
|
5/30/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
6/23/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
7/7/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
7/11/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Deputy Drilled-In Anchors
|
7/24/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
7/24/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2025
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
8/6/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Special/Order Compliance
|
8/25/2025
|
Approved
|
MARTIN TAVITIAN
|
|
T-Bar Ceiling
|
9/3/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
9/5/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
9/12/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
9/23/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
10/8/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Pre-Inspection
|
10/27/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
10/31/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Insulation
|
11/3/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Special/Order Compliance
|
11/6/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Drywall Nailing
|
12/1/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Final
|
12/1/2025
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Footing/Foundation/Slab
|
12/1/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Green Building Final
|
12/1/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Reinforced Concrete Frame
|
12/1/2025
|
Approved
|
MARTIN TAVITIAN
|
|
SGSOV-Seismic Gas S/O Valve
|
12/1/2025
|
SGSOV Approved
|
MARTIN TAVITIAN
|
|
Smoke Detectors
|
12/1/2025
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Special/Order Compliance
|
12/2/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Final
|
12/3/2025
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Smoke Detectors
|
12/3/2025
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Final
|
12/15/2025
|
OK for TCO
|
MARTIN TAVITIAN
|
|
Smoke Detectors
|
12/15/2025
|
Approved
|
MARTIN TAVITIAN
|
|
Special/Order Compliance
|
5/19/2026
|
Approved
|
MARTIN TAVITIAN
|
|
Special/Order Compliance
|
7/27/2026
|
Partial Inspection
|
MARTIN TAVITIAN
|