3287 N CARSE DR 90068

Certificate Information: 3287 N CARSE DR 90068

Application / Permit
21014-10000-04803
Plan Check / Job No.
B21LA17811
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ADDITION TO (E) ONE STORY ACCESSORY LIVING QUARTER WITH ATTACHED GARAGE TO BE CONVERTED TO ADU WITH ATTACHED GARAGE PER ADM-2022-1119-ADU-MSP-OVR (1,200 SF max per Ordinance, LAMC 12.22 A.33 (c)-(d)) NFPA 13-D THRU OUT
Permit Issued
Issued on 7/28/2022
Issuing Office
Metro
Current Status
CofO Issued on 2/20/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/24/2021 APPLICANT
Assigned to Plan Check Engineer 10/28/2021 AUNG SOE
Corrections Issued 11/9/2021 AUNG SOE
Quality Review Completed 11/10/2021 EUGENE BARBEAU
Building Plans Picked Up 11/12/2021 APPLICANT
Applicant returned to address corrections 3/16/2022 AUNG SOE
Plan Check Approved 3/21/2022 AUNG SOE
Issued 7/28/2022 APPLICANT
CofO in Progress 1/30/2024 BRIAN SULLIVAN
CofO Issued 2/20/2024 DEROLD HAUFF
Permit Finaled 2/20/2024 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 11/8/2021 AUNG SOE
Address approval Cleared 1/21/2022 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 1/21/2022 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 1/21/2022 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 1/21/2022 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 1/21/2022 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 1/21/2022 CARLOS AGUILERA
ZA Case Cleared 1/25/2022 RUBEN VASQUEZ
ZA Case Cleared 1/25/2022 RUBEN VASQUEZ
Eng Process Fee Ord 176,300 Cleared 2/1/2022 CARLOS AGUILERA
Roof/Waste drainage to street Cleared 2/1/2022 CARLOS AGUILERA
Sewer availability Cleared 2/1/2022 CARLOS AGUILERA
Specific Plan Cleared 2/18/2022 OLGA AYALA
Distance to fire station Cleared 3/3/2022 CINDY JOSSELYN
Hydrant and Access approval Cleared 3/3/2022 CINDY JOSSELYN

Contact Information

Architect David, Gonzalez; Lic. No.: C34529 1719 MADISON AVENUE      PASADENA, CA 91104
Contractor Echo Projects Inc; Lic. No.: 1075789-B 1506 WALLACE AVENUE      LOS ANGELES, CA 90026
Engineer Barr,, Joseph Daniel; Lic. No.: C70708 1185 HERITAGE FARM RD      HICKORY, NC 28601
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026
Geologist Miller,, Jonathan Steven; Lic. No.: EG2391 24736 CALVERT STREET      WOODLAND HILLS, CA 91367

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/2/2022 Approved CLAYTON GRAHAM
Excavation/Setback/Form/Re-Bar 12/7/2022 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 12/9/2022 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 1/3/2023 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 1/3/2023 Approved BRIAN SULLIVAN
Underground Mechanical 1/3/2023 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 2/23/2023 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 2/23/2023 Partial Approval BRIAN SULLIVAN
Green Building Rough 2/23/2023 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 2/23/2023 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 3/7/2023 Approved BRIAN SULLIVAN
Underground Mechanical 3/17/2023 Partial Approval BRIAN SULLIVAN
Underground Mechanical 4/12/2023 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 5/11/2023 Conditional Approval BRIAN SULLIVAN
Green Building Rough 5/11/2023 Approved BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 5/11/2023 Conditional Approval BRIAN SULLIVAN
Verify Sprinkler Sign Off 5/11/2023 Approved BRIAN SULLIVAN
Insulation 6/9/2023 Approved BRIAN SULLIVAN
Shower Pan 6/15/2023 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 6/27/2023 Partial Approval BRIAN SULLIVAN
Drywall Nailing 7/5/2023 Partial Approval BRIAN SULLIVAN
Underground Mechanical 7/24/2023 No Access for Inspection STUART CHAPMAN
Interior/Exterior Lathing 8/2/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 8/25/2023 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 1/24/2024 Approved BRIAN SULLIVAN
ELECTRICAL-Final 1/24/2024 Approved BRIAN SULLIVAN
Final 1/24/2024 Corrections Issued BRIAN SULLIVAN
Green Building Final 1/24/2024 Approved BRIAN SULLIVAN
HVAC-Final 1/24/2024 Approved BRIAN SULLIVAN
PLUMBING-Final 1/24/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 1/24/2024 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 1/24/2024 Approved BRIAN SULLIVAN
Final 1/29/2024 OK to Issue CofO BRIAN SULLIVAN