2066 W 29TH ST 90018

Certificate Information: 2066 W 29TH ST 90018

Application / Permit
21014-10000-04619
Plan Check / Job No.
B21LA17033
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePlan. Convert existing detached garage to an accessory dwelling unit with small addition per GCS 65852.2(e)(1)(A)
Permit Issued
Issued on 4/28/2022
Issuing Office
Current Status
CofO Issued on 3/16/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/10/2021 APPLICANT
Assigned to Plan Check Engineer 9/14/2021 MONICA RAMIREZ
Corrections Issued 9/14/2021 MONICA RAMIREZ
Applicant returned to address corrections 10/29/2021 MONICA RAMIREZ
Plan Check Approved 2/8/2022 MONICA RAMIREZ
Issued 4/28/2022 APPLICANT
CofO in Progress 3/14/2023 SABAS ALONSO
Permit Finaled 3/16/2023 DEROLD HAUFF
CofO Issued 3/16/2023 DEROLD HAUFF
Permit Finaled 3/16/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 11/1/2021 JEANIE LAM
Roof/Waste drainage to street Cleared 11/1/2021 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 11/3/2021 JEANIE LAM
Sewer availability Cleared 11/3/2021 JEANIE LAM
HPOZ Cleared 1/20/2022 DANIEL MATA
Construction near power lines Cleared 1/25/2022 RIDWAN HARDY

Contact Information

Contractor Benavides Builders Inc; Lic. No.: 1061451-B 7731 ELIZABETH LAKE RD      LEONA VALLEY, CA 93551
Engineer Barakat,, Fouad Chafic; Lic. No.: C67449 8916 LONGDON AVE #C      TEMPLE CITY, CA 91780

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 6/7/2022 Not Ready for Inspection HORACE FULTZ
Green Building Rough 6/7/2022 Not Ready for Inspection HORACE FULTZ
METHANE-Rough 6/7/2022 Approved HORACE FULTZ
Footing/Foundation/Slab 7/21/2022 Not Ready for Inspection SABAS ALONSO
METHANE-Barrier 7/21/2022 Not Ready for Inspection SABAS ALONSO
METHANE-Subgrade 7/21/2022 Not Ready for Inspection SABAS ALONSO
PLUMBING-Rough 7/21/2022 Approved SABAS ALONSO
Footing/Foundation/Slab 8/9/2022 Approved HORACE FULTZ
METHANE-Barrier 8/9/2022 Approved HORACE FULTZ
ELECTRICAL-Rough 9/20/2022 Corrections Issued SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 9/20/2022 Not Ready for Inspection SABAS ALONSO
PLUMBING-Rough 9/20/2022 Corrections Issued SABAS ALONSO
ELECTRICAL-Rough 9/26/2022 No Access for Inspection SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 9/26/2022 No Access for Inspection SABAS ALONSO
PLUMBING-Rough 9/26/2022 No Access for Inspection SABAS ALONSO
Wood Frame 9/26/2022 No Access for Inspection SABAS ALONSO
ELECTRICAL-Rough 9/30/2022 Approved SABAS ALONSO
Green Building Rough 9/30/2022 Approved SABAS ALONSO
PLUMBING-Rough 9/30/2022 Approved SABAS ALONSO
Pre-Inspection 10/6/2022 Not Ready for Inspection SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 10/18/2022 Approved SABAS ALONSO
Insulation 10/18/2022 Approved SABAS ALONSO
Interior/Exterior Lathing 10/18/2022 Partial Approval SABAS ALONSO
Drywall Nailing 10/20/2022 Approved SABAS ALONSO
BUILDING-Rough-Frame 12/29/2022 Approved SABAS ALONSO
Final 12/29/2022 Corrections Issued SABAS ALONSO
Green Building Final 12/29/2022 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 12/29/2022 SGSOV Approved SABAS ALONSO
Smoke Detectors 12/29/2022 Approved SABAS ALONSO
Final 1/19/2023 Corrections Issued SABAS ALONSO
Green Building Final 1/19/2023 Approved SABAS ALONSO
Final 2/16/2023 Conditional Approval RUBEN SALAS
Final 3/14/2023 OK to Issue CofO SABAS ALONSO