8730 N HANNA AVE 91304
Certificate Information: 8730 N HANNA AVE 91304
- Application / Permit
- 21014-10000-04583
- Plan Check / Job No.
- B21LA16855
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Repair of Fire Damage and Interior Remodel: 1st floor: remove and replace interior finishes, insulation and flooring in garage and adjacent closets/hall. smoke seal remaining wall framing. Electrical: replace wiring, fixtures outlets in garage and closets/hall. mechanical: remove and replace conditioning system to match pre-fire condition. 2nd floor: remove and replace attic insulation and ceiling finishes throughout. provide shoring for the existing attics at the NW portion of roof. replace damaged electrical components. replace with new roof and sheathing at damaged area.
- Permit Issued
- Issued on 1/3/2022
- Issuing Office
- Current Status
- Permit Finaled on 3/6/2023
Permit Application Status History
| Submitted | 9/9/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 10/8/2021 | TSE MING HUANG |
| Corrections Issued | 10/10/2021 | TSE MING HUANG |
| Quality Review Completed | 11/2/2021 | STANLEY RAAP |
| Applicant returned to address corrections | 11/15/2021 | TSE MING HUANG |
| Applicant returned to address corrections | 12/29/2021 | TSE MING HUANG |
| Plan Check Approved | 12/29/2021 | TSE MING HUANG |
| Plan Check Approved | 12/30/2021 | RONALD ALLEN |
| Issued | 1/3/2022 | APPLICANT |
| Building Plans Picked Up | 1/10/2022 | APPLICANT |
| Permit Finaled | 2/28/2023 | CHRIS CHRISTENSEN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | G K Construction Inc; Lic. No.: 1019582-B | 11945 MIRABEL WAY PORTER RANCH, CA 91326 |
| Engineer | Lindsey,, Timothy Michael; Lic. No.: C76586 | 403 EAGLE LANE VACAVILLE, CA 95687 |
Inspector Information
| JEFFREY HARTLINE, (818) 774-4320 | Office Hours: 7:00-8:00 AM MON-FRI |
| CHRIS CHRISTENSEN, (818) 774-4320 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 6/7/2022 | Partial Approval | CHRIS CHRISTENSEN |
| BUILDING-Rough-Frame | 7/11/2022 | Approved | CHRIS CHRISTENSEN |
| ELECTRICAL-Final | 7/11/2022 | Not Ready for Inspection | CHRIS CHRISTENSEN |
| ELECTRICAL-Rough | 7/11/2022 | Approved | CHRIS CHRISTENSEN |
| HVAC-Rough | 7/11/2022 | Approved | CHRIS CHRISTENSEN |
| Insulation | 7/13/2022 | Approved | CHRIS CHRISTENSEN |
| PLUMBING-Final | 7/13/2022 | Not Ready for Inspection | CHRIS CHRISTENSEN |
| Floor/Roof Diaphrgm/Shear Wall | 7/15/2022 | Approved | CHRIS CHRISTENSEN |
| Drywall Nailing | 7/20/2022 | Approved | JEFFREY PARD |
| Final | 2/28/2023 | Permit Finaled | CHRIS CHRISTENSEN |
| Green Building Final | 2/28/2023 | Approved | CHRIS CHRISTENSEN |
| SGSOV-Seismic Gas S/O Valve | 2/28/2023 | SGSOV Approved | CHRIS CHRISTENSEN |
| Smoke Detectors | 2/28/2023 | Approved | CHRIS CHRISTENSEN |