5204 N HARTWICK ST 90041

Certificate Information: 5204 N HARTWICK ST 90041

Application / Permit
21014-10000-03817
Plan Check / Job No.
B21LA14057
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EXISTING DETACHED GARAGE TO BE CONVERTED TO ACCESSORY DWELLING UNIT WITH 2ND STORY ADDITION. FIRE SPRINKLER NFPA 13-D THROUGHT 2 OF 2
Permit Issued
Issued on 6/2/2022
Issuing Office
Current Status
Issued on 6/2/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/28/2021 APPLICANT
Assigned to Plan Check Engineer 9/2/2021 FARSHAD ALIMOHAMADI
Corrections Issued 9/9/2021 FARSHAD ALIMOHAMADI
Quality Review Completed 9/9/2021 SAI KHUM
Applicant returned to address corrections 3/14/2022 FARSHAD ALIMOHAMADI
Plan Check Approved 5/24/2022 FARSHAD ALIMOHAMADI
Issued 6/2/2022 APPLICANT
Building Plans Picked Up 7/14/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 11/4/2021 KHOUNG LE
Eng Process Fee Ord 176,300 Cleared 11/4/2021 KHOUNG LE
Sewer availability Cleared 11/4/2021 KHOUNG LE
Low Impact Development Cleared 3/17/2022 JORGE MEJIA LEMUS
GPI Written Notices Cleared 4/18/2022 SAI KHUM
Grading Pre-Inspection Cleared 4/18/2022 FARSHAD ALIMOHAMADI
Roof/Waste drainage to street Cleared 4/25/2022 AMAAN MALIK

Contact Information

Architect Cooke,, Barrett H; Lic. No.: C37365 5239 WINDERMERE AVE      LOS ANGELES, CA 90041
Contractor Eagle Rock Restoration; Lic. No.: 1025285-B 5464 WAMEDA AVE      LOS ANGELES, CA 90041
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Final 6/9/2026   

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/28/2022 Partial Approval CRAIG VAUGHAN
Floor/Roof Diaphrgm/Shear Wall 9/7/2022 Partial Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 9/21/2022 Partial Approval CRAIG VAUGHAN
Floor/Roof Diaphrgm/Shear Wall 10/12/2022 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 10/28/2022 Partial Approval CRAIG VAUGHAN
Deputy Reinf. Concrete 11/7/2022 Conditional Approval CRAIG VAUGHAN
Footing/Foundation/Slab 12/13/2022 Partial Approval CRAIG VAUGHAN
Excavation/Setback/Form/Re-Bar 12/15/2022 Approved CRAIG VAUGHAN
Deputy Reinf. Concrete 12/21/2022 Conditional Approval BRIAN SULLIVAN
Interior/Exterior Lathing 1/17/2023 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 4/28/2023 Approved CRAIG VAUGHAN
ELECTRICAL-Rough 4/28/2023 Approved CRAIG VAUGHAN
Green Building Rough 4/28/2023 Approved CRAIG VAUGHAN
HVAC-Rough 4/28/2023 Corrections Issued CRAIG VAUGHAN
PLUMBING-Rough 4/28/2023 Corrections Issued CRAIG VAUGHAN
Shower Pan 4/28/2023 Approved CRAIG VAUGHAN
Verify Sprinkler Sign Off 4/28/2023 Approved CRAIG VAUGHAN
ELECTRICAL-Rough 5/8/2023 Approved CRAIG VAUGHAN
HVAC-Rough 5/8/2023 Approved CRAIG VAUGHAN
Insulation 5/8/2023 Approved CRAIG VAUGHAN
PLUMBING-Rough 5/8/2023 Approved CRAIG VAUGHAN
Drywall Nailing 6/2/2023 Approved CHARLES BOGHOSKHAN
Wood Frame 4/25/2024 Not Ready for Inspection CRAIG VAUGHAN
Final 4/28/2025 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 4/28/2025 Approved LILIANA PORTILLO
Green Building Final 4/28/2025 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 4/28/2025 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 4/28/2025 Not Ready for Inspection LILIANA PORTILLO
Final 5/29/2026 Corrections Issued RONNIE MEDINA
Green Building Final 5/29/2026 Approved RONNIE MEDINA
SGSOV-Seismic Gas S/O Valve 5/29/2026 SGSOV Approved RONNIE MEDINA
Smoke Detectors 5/29/2026 Approved RONNIE MEDINA