4447 N BELLINGHAM AVE 91604

Certificate Information: 4447 N BELLINGHAM AVE 91604

Application / Permit
21014-10000-03465
Plan Check / Job No.
B21LA12821
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION AT REAR OF EXISTING ONE STORY SINGLE FAMILY DWELLING WITH COVERED PATIO PER ENGINEER DESIGN. NFPA 13D THROUGHOUT.
Permit Issued
Issued on 2/12/2022
Issuing Office
Current Status
CofO Issued on 12/4/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/8/2021 APPLICANT
Assigned to Plan Check Engineer 7/14/2021 ZAW HAN
Corrections Issued 7/21/2021 ZAW HAN
Applicant returned to address corrections 1/26/2022 GEORGE ALVAREZ
Plan Check Approved 2/1/2022 GEORGE ALVAREZ
Issued 2/12/2022 APPLICANT
Building Plans Picked Up 2/23/2022 APPLICANT
CofO in Progress 11/14/2024 CHRISTOPHE COCHRAN
Permit Finaled 12/4/2024 RUBEN SALAS
CofO Issued 12/4/2024 RUBEN SALAS
Permit Finaled 12/4/2024 RUBEN SALAS

Permit Application Clearance Information

ZI Cleared 9/16/2021 MIGUEL GAMBOA
Sewer availability Cleared 9/17/2021 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 10/13/2021 CARLOS AGUILERA
Low Impact Development Cleared 11/10/2021 TA ANH
Roof/Waste drainage to street Cleared 11/13/2021 CARLOS AGUILERA
Hydrant and Access approval Cleared 12/17/2021 GILBERT URREA

Contact Information

Contractor Brennan Construction; Lic. No.: 965776-B 445 N. FLORENCE ST      BURBANK, CA 91505
Engineer Espino,, Manuel A; Lic. No.: C55526 12109 WOODRUFF AVE      DOWNEY, CA 90241

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/22/2022 Conditional Approval CALEB MEISTER
Footing/Foundation/Slab 3/22/2022 Partial Approval ARAM AVEDISIAN
Deputy Drilled-In Anchors 4/6/2022 Conditional Approval ARAM AVEDISIAN
BUILDING-Rough-Frame 4/7/2022 Partial Approval ARAM AVEDISIAN
Footing/Foundation/Slab 4/7/2022 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 4/26/2022 Partial Approval ARAM AVEDISIAN
Deputy Drilled-In Anchors 6/27/2022 Conditional Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 6/30/2022 Partial Approval CHRISTOPHE COCHRAN
Footing/Foundation/Slab 6/30/2022 Approved CHRISTOPHE COCHRAN
Insulation 8/16/2022 Partial Approval CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 11/9/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
ELECTRICAL-Rough 11/9/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
Green Building Rough 11/9/2022 Approved CHRISTOPHE COCHRAN
HVAC-Rough 11/9/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
PLUMBING-Rough 11/9/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
Rough-Elec/Plmb/HVAC 11/9/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 11/17/2022 Corrections Issued ROBERT GOLD
ELECTRICAL-Rough 11/17/2022 Approved ROBERT GOLD
HVAC-Rough 11/17/2022 Conditional Approval ROBERT GOLD
PLUMBING-Rough 11/17/2022 Approved ROBERT GOLD
Rough-Elec/Plmb/HVAC 11/17/2022 Not Ready for Inspection ROBERT GOLD
Insulation 11/23/2022 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 11/23/2022 Partial Approval CHRISTOPHE COCHRAN
Drywall Nailing 12/7/2022 Not Ready for Inspection MICHEL ABAJAN
Drywall Nailing 12/12/2022 Approved CHRISTOPHE COCHRAN
Shower Pan 1/30/2023 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 2/6/2023 Approved THOMAS FINNILA
Gas Test 7/24/2023 Approved CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 1/19/2024 Approved CHRISTOPHE COCHRAN
Final 1/19/2024 Corrections Issued CHRISTOPHE COCHRAN
Green Building Final 1/19/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 1/19/2024 SGSOV Approved CHRISTOPHE COCHRAN
Smoke Detectors 1/19/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Wood Frame 3/28/2024 Approved CHRISTOPHE COCHRAN
Final 11/14/2024 OK to Issue CofO CHRISTOPHE COCHRAN
Green Building Final 11/14/2024 Approved CHRISTOPHE COCHRAN
Smoke Detectors 11/14/2024 Approved CHRISTOPHE COCHRAN