11024 W WRIGHTWOOD LANE 91604

Certificate Information: 11024 W WRIGHTWOOD LANE 91604

Application / Permit
21014-10000-03191
Plan Check / Job No.
B21LA11761
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) ACCESSORY LIVING QUARTER ADDITION AND REMODEL TO (E) 1-STORY SINGLE FAMILY DWELLING WITH ATTACHED 2-CAR GARAGE
Permit Issued
Issued on 6/13/2022
Issuing Office
Metro
Current Status
Issued on 6/13/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/23/2021 APPLICANT
Assigned to Plan Check Engineer 7/15/2021 DANIEL YIP
Corrections Issued 7/20/2021 DANIEL YIP
Quality Review Completed 7/28/2021 JASON HEALEY
Building Plans Picked Up 7/29/2021 APPLICANT
Applicant returned to address corrections 9/2/2021 DANIEL YIP
Plan Check Approved 6/6/2022 DANIEL YIP
Issued 6/13/2022 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 8/3/2021 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 8/3/2021 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 8/3/2021 CARLOS AGUILERA
BHO/Hillside ordinance Cleared 8/3/2021 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 8/3/2021 CARLOS AGUILERA
Sewer availability Cleared 8/3/2021 CARLOS AGUILERA
GPI Written Notices Cleared 9/2/2021 DANIEL YIP
Grading Pre-Inspection Cleared 9/2/2021 DANIEL YIP
BHO/Hillside ordinance Cleared 9/9/2021 LEE GUILBEAUX
Hydrant and Access approval Cleared 10/22/2021 JOHN CONNEALLY
Low Impact Development Cleared 2/1/2022 LONDY ALVARADO
Roof/Waste drainage to street Cleared 2/1/2022 CARLOS AGUILERA
Specific Plan Cleared 3/24/2022 OLGA AYALA
Excavation more than 5-ft deep Cleared 6/6/2022 CALOSHA APPROVED

Contact Information

Contractor Designing Edge Builders; Lic. No.: 947772-B PO BOX 16668      ENCINO, CA 91316
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 6/16/2022 Corrections Issued SHAVONNE ESPINOZA
Sewer 6/21/2022 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 7/11/2022 Partial Approval STUART CHAPMAN
Footing/Foundation/Slab 9/23/2022 Corrections Issued BRIAN SULLIVAN
Masonry Wall/Backfill 9/23/2022 Not Ready for Inspection BRIAN SULLIVAN
Masonry Wall/Backfill 9/26/2022 Not Ready for Inspection BRIAN SULLIVAN
Masonry Wall/Backfill 10/19/2022 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 12/15/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 12/15/2022 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 12/15/2022 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 1/31/2023 Corrections Issued BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 2/2/2023 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 2/9/2023 Conditional Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 2/10/2023 Conditional Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 2/22/2023 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 3/7/2023 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 6/30/2023 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 7/7/2023 Partial Approval BRIAN SULLIVAN
HVAC-Rough 7/7/2023 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 7/7/2023 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 7/21/2023 Corrections Issued RAUL BARAJAS
Green Building Rough 7/21/2023 Approved RAUL BARAJAS
HVAC-Rough 7/21/2023 Partial Inspection RAUL BARAJAS
Shower Pan 7/21/2023 Approved RAUL BARAJAS
Verify Sprinkler Sign Off 7/21/2023 Corrections Issued RAUL BARAJAS
HVAC-Rough 8/16/2023 Corrections Issued BRIAN SULLIVAN
BUILDING-Rough-Frame 9/1/2023 Corrections Issued BRIAN SULLIVAN
HVAC-Rough 9/1/2023 Partial Approval BRIAN SULLIVAN
Verify Sprinkler Sign Off 9/1/2023 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 10/18/2023 Partial Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 10/18/2023 Partial Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 10/25/2023 Partial Approval BRIAN SULLIVAN
Verify Sprinkler Sign Off 10/25/2023 Approved BRIAN SULLIVAN
Insulation 10/30/2023 Partial Approval BRIAN SULLIVAN
Drywall Nailing 11/9/2023 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 2/7/2024 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 2/7/2024 Not Ready for Inspection BRIAN SULLIVAN
Insulation 2/7/2024 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 2/22/2024 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 4/12/2024 SGSOV Not Ready BRIAN SULLIVAN
Final 5/29/2024 Partial Inspection BRIAN SULLIVAN
Green Building Final 5/29/2024 Partial Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/29/2024 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 5/29/2024 Partial Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 10/4/2024 SGSOV Not Ready BRIAN SULLIVAN
Service/Power Release 8/29/2025 Approved BRIAN SULLIVAN