1556 S CARDIFF AVE 90035
Certificate Information: 1556 S CARDIFF AVE 90035
- Application / Permit
- 21014-10000-02311
- Plan Check / Job No.
- B21LA08756
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- ADDITION COVER PATIO (1st floor) AND DECK (2nd floor) TO (E) TWO STORY SFD
- Permit Issued
- Issued on 2/22/2022
- Issuing Office
- Current Status
- CofO Issued on 7/7/2025
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 5/7/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 5/11/2021 | TSE MING HUANG |
| Corrections Issued | 5/11/2021 | TSE MING HUANG |
| Plan Check Approved | 7/18/2021 | SINA KHOSRAVI |
| Issued | 2/22/2022 | APPLICANT |
| Building Plans Picked Up | 2/23/2022 | APPLICANT |
| Permit Finaled | 7/7/2025 | RICHARD STEINBACH |
| CofO Issued | 7/7/2025 | RICHARD STEINBACH |
| Permit Finaled | 7/7/2025 | RICHARD STEINBACH |
Permit Application Clearance Information
| Eng Process Fee Ord 176,300 | Cleared | 6/3/2021 | HISASHI KOBAYAKAWA |
| Roof/Waste drainage to street | Cleared | 6/3/2021 | HISASHI KOBAYAKAWA |
| Grading Pre-Inspection | Cleared | 6/7/2021 | BRIAN MILLER |
Contact Information
| Contractor | Benabou Construction Inc; Lic. No.: 1034782-B | 9157 ALCOTT ST APT 7 LOS ANGELES, CA 90035 |
| Engineer | Kim,, Hong Kook; Lic. No.: C64529 | 3600 WILSHIRE BLVD STE 1903 LOS ANGELES, CA 90010 |
Inspector Information
| ASHLEY THOMPSON, (310) 914-3897 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 2/28/2022 | Corrections Issued | KEVIN SARGSYAN |
| METHANE-Barrier | 2/28/2022 | Not Ready for Inspection | KEVIN SARGSYAN |
| METHANE-Subgrade | 2/28/2022 | Not Ready for Inspection | KEVIN SARGSYAN |
| Deputy Drilled-In Anchors | 4/7/2022 | Approved | MICHAEL PELHAM |
| Footing/Foundation/Slab | 4/13/2022 | Corrections Issued | EVAN COOPER |
| METHANE-Barrier | 4/13/2022 | Approved | EVAN COOPER |
| METHANE-Subgrade | 4/13/2022 | Approved | EVAN COOPER |
| Deputy Wood Construction | 4/20/2022 | Approved | KEVIN SARGSYAN |
| Excavation/Setback/Form/Re-Bar | 4/20/2022 | Corrections Issued | KEVIN SARGSYAN |
| Excavation/Setback/Form/Re-Bar | 4/22/2022 | Approved | KEVIN SARGSYAN |
| Insulation | 5/19/2022 | No Access for Inspection | KEVIN SARGSYAN |
| Wood Frame | 5/19/2022 | No Access for Inspection | KEVIN SARGSYAN |
| Insulation | 5/24/2022 | Approved | EVAN COOPER |
| Wood Frame | 5/24/2022 | Corrections Issued | EVAN COOPER |
| BUILDING-Rough-Frame | 6/24/2022 | Not Ready for Inspection | KEVIN SARGSYAN |
| ELECTRICAL-Rough | 6/24/2022 | Corrections Issued | KEVIN SARGSYAN |
| METHANE-Rough | 6/24/2022 | Approved | KEVIN SARGSYAN |
| Structural Steel Frame | 6/24/2022 | Not Ready for Inspection | KEVIN SARGSYAN |
| Wood Frame | 6/24/2022 | Not Ready for Inspection | KEVIN SARGSYAN |
| ELECTRICAL-Rough | 7/7/2022 | Approved | KEVIN SARGSYAN |
| Structural Steel Frame | 7/12/2022 | Approved | KEVIN SARGSYAN |
| BUILDING-Rough-Frame | 11/21/2022 | Approved | OGANES TARAKHCHYAN |
| Drywall Nailing | 11/21/2022 | Approved | OGANES TARAKHCHYAN |
| Final | 11/21/2022 | Corrections Issued | OGANES TARAKHCHYAN |
| Footing/Foundation/Slab | 11/21/2022 | Approved | OGANES TARAKHCHYAN |
| SGSOV-Seismic Gas S/O Valve | 11/21/2022 | SGSOV Not Ready | OGANES TARAKHCHYAN |
| Smoke Detectors | 11/21/2022 | Not Ready for Inspection | OGANES TARAKHCHYAN |
| SGSOV-Seismic Gas S/O Valve | 11/29/2022 | SGSOV Approved | OGANES TARAKHCHYAN |
| Smoke Detectors | 11/29/2022 | Approved | OGANES TARAKHCHYAN |
| Final | 12/8/2022 | Partial Approval | OGANES TARAKHCHYAN |