1556 S CARDIFF AVE 90035

Certificate Information: 1556 S CARDIFF AVE 90035

Application / Permit
21014-10000-02311
Plan Check / Job No.
B21LA08756
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION COVER PATIO (1st floor) AND DECK (2nd floor) TO (E) TWO STORY SFD
Permit Issued
Issued on 2/22/2022
Issuing Office
Current Status
CofO Issued on 7/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/7/2021 APPLICANT
Assigned to Plan Check Engineer 5/11/2021 TSE MING HUANG
Corrections Issued 5/11/2021 TSE MING HUANG
Plan Check Approved 7/18/2021 SINA KHOSRAVI
Issued 2/22/2022 APPLICANT
Building Plans Picked Up 2/23/2022 APPLICANT
Permit Finaled 7/7/2025 RICHARD STEINBACH
CofO Issued 7/7/2025 RICHARD STEINBACH
Permit Finaled 7/7/2025 RICHARD STEINBACH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 6/3/2021 HISASHI KOBAYAKAWA
Roof/Waste drainage to street Cleared 6/3/2021 HISASHI KOBAYAKAWA
Grading Pre-Inspection Cleared 6/7/2021 BRIAN MILLER

Contact Information

Contractor Benabou Construction Inc; Lic. No.: 1034782-B 9157 ALCOTT ST APT 7      LOS ANGELES, CA 90035
Engineer Kim,, Hong Kook; Lic. No.: C64529 3600 WILSHIRE BLVD STE 1903      LOS ANGELES, CA 90010

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/28/2022 Corrections Issued KEVIN SARGSYAN
METHANE-Barrier 2/28/2022 Not Ready for Inspection KEVIN SARGSYAN
METHANE-Subgrade 2/28/2022 Not Ready for Inspection KEVIN SARGSYAN
Deputy Drilled-In Anchors 4/7/2022 Approved MICHAEL PELHAM
Footing/Foundation/Slab 4/13/2022 Corrections Issued EVAN COOPER
METHANE-Barrier 4/13/2022 Approved EVAN COOPER
METHANE-Subgrade 4/13/2022 Approved EVAN COOPER
Deputy Wood Construction 4/20/2022 Approved KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 4/20/2022 Corrections Issued KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 4/22/2022 Approved KEVIN SARGSYAN
Insulation 5/19/2022 No Access for Inspection KEVIN SARGSYAN
Wood Frame 5/19/2022 No Access for Inspection KEVIN SARGSYAN
Insulation 5/24/2022 Approved EVAN COOPER
Wood Frame 5/24/2022 Corrections Issued EVAN COOPER
BUILDING-Rough-Frame 6/24/2022 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 6/24/2022 Corrections Issued KEVIN SARGSYAN
METHANE-Rough 6/24/2022 Approved KEVIN SARGSYAN
Structural Steel Frame 6/24/2022 Not Ready for Inspection KEVIN SARGSYAN
Wood Frame 6/24/2022 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 7/7/2022 Approved KEVIN SARGSYAN
Structural Steel Frame 7/12/2022 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 11/21/2022 Approved OGANES TARAKHCHYAN
Drywall Nailing 11/21/2022 Approved OGANES TARAKHCHYAN
Final 11/21/2022 Corrections Issued OGANES TARAKHCHYAN
Footing/Foundation/Slab 11/21/2022 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 11/21/2022 SGSOV Not Ready OGANES TARAKHCHYAN
Smoke Detectors 11/21/2022 Not Ready for Inspection OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 11/29/2022 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 11/29/2022 Approved OGANES TARAKHCHYAN
Final 12/8/2022 Partial Approval OGANES TARAKHCHYAN