3212 W LACLEDE AVE 90039

Certificate Information: 3212 W LACLEDE AVE 90039

Application / Permit
21014-10000-02259
Plan Check / Job No.
B21LA08582
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR AND EXTERIOR REMODEL TO EXISTING 1 STORY SINGLE FAMILY DWELLING PER ENGINEER DESIGN. (no change in floor area or height)
Permit Issued
Issued on 9/8/2022
Issuing Office
Metro
Current Status
Issued on 9/8/2022

Permit Application Status History

Submitted 5/7/2021 APPLICANT
Assigned to Plan Check Engineer 6/16/2021 AUNG SOE
Corrections Issued 6/22/2021 AUNG SOE
Quality Review Completed 6/24/2021 EUGENE BARBEAU
Applicant returned to address corrections 12/28/2021 AUNG SOE
Building Plans Picked Up 1/4/2022 APPLICANT
Applicant returned to address corrections 2/22/2022 AUNG SOE
Plan Check Approved 2/28/2022 AUNG SOE
Issued 9/8/2022 APPLICANT

Permit Application Clearance Information

Sewer availability Cleared 7/20/2021 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 7/21/2021 STEVE MELGAR
ZI Cleared 7/23/2021 DANIEL CORONADO
Hydrant and Access approval Cleared 9/16/2021 MATTHEW CRAIG
Roof/Waste drainage to street Cleared 9/17/2021 STEVE MELGAR

Contact Information

Architect Zecchetto,, Renzo; Lic. No.: C22116 11609 W PICO BLVD      LOS ANGELES, CA 90064
Contractor Kjan Construction Inc; Lic. No.: 1038236-B 3717 B PLATT AVE      LYNWOOD, CA 90262
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Mar,, Larry L; Lic. No.: C55069 4425 BEULAH DR      LA CANADA, CA 91011
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/15/2023 Corrections Issued HAMIK HARTOUNIAN
Pre-Inspection 4/3/2023 Corrections Issued HAMIK HARTOUNIAN
Deputy Drilled-In Anchors 4/4/2023 Conditional Approval HAMIK HARTOUNIAN
Excavation/Setback/Form/Re-Bar 11/13/2023 Corrections Issued HAMIK HARTOUNIAN
Footing/Foundation/Slab 11/13/2023 Not Ready for Inspection HAMIK HARTOUNIAN
Footing/Foundation/Slab 5/14/2024 Not Ready for Inspection THOMAS LOGRASSO
Wood Frame 5/14/2024 Not Ready for Inspection THOMAS LOGRASSO
Footing/Foundation/Slab 7/30/2024 Corrections Issued THOMAS LOGRASSO
Special/Order Compliance 8/29/2024 Conditional Approval THOMAS LOGRASSO
Wood Frame 8/29/2024 Corrections Issued THOMAS LOGRASSO
Pre-Inspection 8/20/2025 Corrections Issued NICHOLAS LOPEZ
Wood Frame 8/20/2025 Not Ready for Inspection NICHOLAS LOPEZ
Deputy Wood Construction 8/27/2025 Conditional Approval NICHOLAS LOPEZ