3969 S MARCASEL AVE 90066

Certificate Information: 3969 S MARCASEL AVE 90066

Application / Permit
21014-10000-01214
Plan Check / Job No.
B21LA04646
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePLAN. CONVERT PORTION OF (E) DETACHED GARAGE TO ACCESSORY DWELLING UNIT PER CA Govt. Code 65852.2(e)(1)(A)
Permit Issued
Issued on 1/10/2022
Issuing Office
Current Status
CofO Issued on 12/2/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/15/2021 APPLICANT
Assigned to Plan Check Engineer 3/15/2021 KEVIN MORALES
Corrections Issued 3/15/2021 KEVIN MORALES
Plan Check Approved 3/24/2021 KEVIN MORALES
Issued 1/10/2022 APPLICANT
CofO in Progress 11/30/2022 JESUS RODRIGUEZ
Permit Finaled 12/2/2022 DANIEL ORRANTE
CofO Issued 12/2/2022 DANIEL ORRANTE
Permit Finaled 12/2/2022 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 3/18/2021 HISASHI KOBAYAKAWA
Sewer availability Cleared 3/18/2021 HISASHI KOBAYAKAWA
Eng Process Fee Ord 176,300 Cleared 3/19/2021 DINAH GARIN
Specific Plan Cleared 3/23/2021 EILEEN HUNT

Contact Information

Architect Fruttaldo,, Giovanni David; Lic. No.: C36430       ,
Contractor Dlk Construction Inc; Lic. No.: 961510-B 1171 S ROBERTSON BLVD #275      LOS ANGELES, CA 90035
Engineer Standley,, Craig Erick; Lic. No.: C87675 5330 ZELZAH AVE UNIT 7      ENCINO, CA 91316

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 1/14/2022 Approved ENRIQUE MIRELES
Deputy Drilled-In Anchors 1/21/2022 No Access for Inspection DAVID FEILER
ELECTRICAL-Rough 2/22/2022 Corrections Issued ENRIQUE MIRELES
HVAC-Rough 2/22/2022 Approved ENRIQUE MIRELES
PLUMBING-Rough 2/22/2022 Corrections Issued ENRIQUE MIRELES
Shower Pan 2/22/2022 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 4/1/2022 Conditional Approval JESUS RODRIGUEZ
ELECTRICAL-Rough 4/1/2022 Approved JESUS RODRIGUEZ
PLUMBING-Rough 4/1/2022 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 4/12/2022 Approved RYAN SALAZAR
Insulation 4/19/2022 Approved PATRICK QUALEY
Drywall Nailing 5/20/2022 Approved PATRICK QUALEY
Green Building Rough 5/20/2022 Approved PATRICK QUALEY
BUILDING-Rough-Frame 11/9/2022 Approved EVAN COOPER
Final 11/9/2022 Corrections Issued EVAN COOPER
Green Building Final 11/9/2022 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 11/9/2022 SGSOV Approved EVAN COOPER
Smoke Detectors 11/9/2022 Approved EVAN COOPER
ELECTRICAL-Final 11/28/2022 Corrections Issued JESUS RODRIGUEZ
Final 11/28/2022 Corrections Issued JESUS RODRIGUEZ
HVAC-Final 11/28/2022 Approved JESUS RODRIGUEZ
PLUMBING-Final 11/28/2022 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 11/28/2022 SGSOV Approved JESUS RODRIGUEZ
Smoke Detectors 11/28/2022 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 11/30/2022 Approved JESUS RODRIGUEZ
Final 11/30/2022 OK to Issue CofO JESUS RODRIGUEZ