3741 N VINELAND AVE 91604

Certificate Information: 3741 N VINELAND AVE 91604

Application / Permit
21014-10000-00299
Plan Check / Job No.
B21LA01136
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED TWO BEDROOM AND BATHROOM ADDITION AT REAR OF (E) SFD. INCLUDES KITCHEN AREA REMODEL.
Permit Issued
Issued on 8/26/2022
Issuing Office
Metro
Current Status
CofO Issued on 7/16/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/25/2021 APPLICANT
Assigned to Plan Check Engineer 2/4/2021 LAWRENCE QUIRANTE
Corrections Issued 2/7/2021 LAWRENCE QUIRANTE
Applicant returned to address corrections 5/4/2021 TSE MING HUANG
Plan Check Approved 5/19/2021 TSE MING HUANG
Building Plans Picked Up 5/21/2021 APPLICANT
Issued 8/26/2022 APPLICANT
CofO in Progress 6/12/2023 BRIAN SULLIVAN
Permit Finaled 7/16/2023 DEROLD HAUFF
CofO Issued 7/16/2023 DEROLD HAUFF
Permit Finaled 7/16/2023 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/30/2021 BRIAN MILLER
Eng Process Fee Ord 176,300 Cleared 4/6/2021 ADRIAN CASTRO
Roof/Waste drainage to street Cleared 4/6/2021 ADRIAN CASTRO

Contact Information

Contractor Owner-Builder       ,
Engineer Park,, Juntae; Lic. No.: C65104 3055 WILSHIRE BLVD 880      LOS ANGELES, CA 90010

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 10/25/2022 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 11/3/2022 No Access for Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 11/9/2022 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 11/9/2022 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 11/28/2022 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 11/28/2022 Partial Approval BRIAN SULLIVAN
Green Building Rough 11/28/2022 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 11/28/2022 Approved BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 11/29/2022 Partial Approval BRIAN SULLIVAN
Wood Frame 12/20/2022 Corrections Issued BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 1/3/2023 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 1/13/2023 Corrections Issued JOAQUIN GREENOUGH
Footing/Foundation/Slab 1/18/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 2/1/2023 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 2/1/2023 Corrections Issued BRIAN SULLIVAN
BUILDING-Rough-Frame 2/6/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 2/6/2023 Approved BRIAN SULLIVAN
Green Building Rough 2/6/2023 Approved BRIAN SULLIVAN
PLUMBING-Rough 2/6/2023 Approved BRIAN SULLIVAN
Insulation 2/13/2023 Approved BRIAN SULLIVAN
Shower Pan 2/13/2023 Approved BRIAN SULLIVAN
Drywall Nailing 2/21/2023 Approved RAUL BARAJAS
Interior/Exterior Lathing 2/21/2023 Approved RAUL BARAJAS
Wood Frame 4/3/2023 Corrections Issued BRIAN SULLIVAN
ELECTRICAL-Rough 4/11/2023 Approved BRIAN SULLIVAN
PLUMBING-Rough 4/11/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 5/22/2023 Corrections Issued BRIAN SULLIVAN
Final 5/22/2023 Corrections Issued BRIAN SULLIVAN
Green Building Final 5/22/2023 Approved BRIAN SULLIVAN
HVAC-Final 5/22/2023 Corrections Issued BRIAN SULLIVAN
MERV13>=Final 5/22/2023 Approved BRIAN SULLIVAN
PLUMBING-Final 5/22/2023 Corrections Issued BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/22/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 5/22/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 6/1/2023 Not Ready for Inspection BRIAN SULLIVAN
Final 6/1/2023 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 6/1/2023 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 6/1/2023 Not Ready for Inspection BRIAN SULLIVAN
Final 6/9/2023 OK to Issue CofO BRIAN SULLIVAN