179 S ROCKINGHAM AVE 90049

Certificate Information: 179 S ROCKINGHAM AVE 90049

Application / Permit
21010-30000-05854
Plan Check / Job No.
B21WL04939
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(22) Storage Building
Work Description
(N) DEATCHED STORAGE BUILDING WITH OUTDOOR FIRE PLACE AT REAR OF THE LOT
Permit Issued
Issued on 7/28/2022
Issuing Office
West Los Angeles
Current Status
CofO Issued on 10/30/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/10/2021 APPLICANT
Assigned to Plan Check Engineer 11/12/2021 JAHANSHAH POURHASSAN
Corrections Issued 11/14/2021 JAHANSHAH POURHASSAN
Applicant returned to address corrections 4/7/2022 JASON JANGADA
Applicant returned to address corrections 5/20/2022 DAVID CASTILLO
Building Plans Picked Up 6/7/2022 APPLICANT
Applicant returned to address corrections 6/16/2022 DAVID CASTILLO
Plan Check Approved 7/28/2022 DAVID CASTILLO
Issued 7/28/2022 APPLICANT
CofO in Progress 10/18/2024 JESUS RODRIGUEZ
CofO Issued 10/30/2024 RICHARD STEINBACH
Permit Finaled 10/30/2024 RICHARD STEINBACH

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 1/29/2022 STEVEN JIN
Miscellaneous Cleared 1/31/2022 DALIA MOKAYED
Hydrant and Access approval Cleared 3/11/2022 LARRY REDDEN
Grading Pre-Inspection Cleared 4/7/2022 JAHANSHAH POURHASSAN
Eng Process Fee Ord 176,300 Cleared 7/5/2022 STEVEN JIN

Contact Information

Contractor J R C Group Inc; Lic. No.: 980658-B 8981 SUNSET BLVD STE 505      LOS ANGELES, CA 90069
Engineer Lau,, David Harkwong; Lic. No.: C34961 12467 W WASHINGTON BLVD      LOS ANGELES, CA 90066

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/3/2022 Partial Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 3/28/2023 Partial Inspection OGANES TARAKHCHYAN
Grading Pre-Inspection 3/28/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 4/4/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 4/4/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Footing/Foundation/Slab 4/10/2023 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 4/20/2023 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 4/20/2023 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 5/9/2023 Corrections Issued OGANES TARAKHCHYAN
Pre-Inspection 5/9/2023 Corrections Issued OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 5/12/2023 Approved OGANES TARAKHCHYAN
Gas Test 5/26/2023 Partial Approval KENNETH NAGLE
Footing/Foundation/Slab 8/31/2023 Approved KEVIN SARGSYAN
Deputy Steel/Welding 9/29/2023 Partial Approval OGANES TARAKHCHYAN
Deputy Wood Construction 10/5/2023 No Access for Inspection KENNETH NAGLE
BUILDING-Rough-Frame 10/11/2023 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 10/11/2023 Approved KEVIN SARGSYAN
Verify Sprinkler Sign Off 10/11/2023 Corrections Issued KEVIN SARGSYAN
Masonry Wall/Backfill 1/9/2024 Corrections Issued ARAM AVEDISIAN
Masonry Wall/Backfill 1/10/2024 Partial Approval ARAM AVEDISIAN
HVAC-Rough 5/17/2024 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 6/4/2024 Corrections Issued ARAM AVEDISIAN
Interior/Exterior Lathing 6/4/2024 Partial Approval ARAM AVEDISIAN
BUILDING-Rough-Frame 9/9/2024 Not Ready for Inspection JESUS RODRIGUEZ
Drywall Nailing 9/9/2024 Not Ready for Inspection JESUS RODRIGUEZ
ELECTRICAL-Final 9/9/2024 Not Ready for Inspection JESUS RODRIGUEZ
Final 9/9/2024 Corrections Issued JESUS RODRIGUEZ
Green Building Final 9/9/2024 Approved JESUS RODRIGUEZ
Green Building Rough 9/9/2024 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 9/9/2024 SGSOV Approved JESUS RODRIGUEZ
Service/Power Release 9/9/2024 Not Required JESUS RODRIGUEZ
Verify Sprinkler Sign Off 9/9/2024 Not Ready for Inspection JESUS RODRIGUEZ
BUILDING-Rough-Frame 10/4/2024 Conditional Approval JESUS RODRIGUEZ
ELECTRICAL-Final 10/4/2024 Approved JESUS RODRIGUEZ
Final 10/4/2024 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Final 10/4/2024 Approved JESUS RODRIGUEZ
BUILDING-Rough-Frame 10/18/2024 Approved JESUS RODRIGUEZ
Final 10/18/2024 OK to Issue CofO JESUS RODRIGUEZ