New 2 story SFD (4,137 sf) (4 bedroom ; 4 1/2 bathroom) over 1-level basement (2,317 sf) with basement 2-car garage (377 sf) and roof deck
Permit Issued
Issued on 8/23/2022
Issuing Office
Metro
Current Status
CofO Issued on 1/2/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/22/2021 APPLICANT
Assigned to Plan Check Engineer 7/8/2021 ALFREDO JARA
Corrections Issued 7/14/2021 ALFREDO JARA
Quality Review Completed 7/29/2021 CHIHARU SUZUKI
Plan Check Approved 8/19/2022 REZA HAGHIGHAT
Building Plans Picked Up 8/22/2022 APPLICANT
Issued 8/23/2022 APPLICANT
Permit Finaled 1/2/2025 RICHARD STEINBACH
Permit Finaled 1/2/2025 RICHARD STEINBACH
CofO Issued 1/2/2025 RICHARD STEINBACH

Permit Application Clearance Information

Permit Cleared 9/29/2021 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 9/30/2021 DINAH GARIN
Sewer availability Cleared 9/30/2021 DINAH GARIN
Hydrant and Access approval Cleared 12/7/2021 ROBERT DUFF
Trees in Parkway Cleared 5/24/2022 ADALBERTO VERA
Coastal Zone Cleared 5/25/2022 NOAH MCCOY
ZI Cleared 5/25/2022 NOAH MCCOY
Low Impact Development Cleared 6/2/2022 SUNG JOON WON
Roof/Waste drainage to street Cleared 6/3/2022 DINAH GARIN
GPI Written Notices Cleared 7/5/2022 ALFREDO JARA
Grading Pre-Inspection Cleared 7/5/2022 ALFREDO JARA
ZA Case Cleared 8/4/2022 SPENCER WEJROWSKI
Excavation more than 5-ft deep Cleared 8/19/2022 CALOSHA APPROVED

Contact Information

Architect Blumenberg,, Richard Leo; Lic. No.: C10862 15200 SUNSET BLVD STE 201      PACIFIC PALISADES, CA 90272
Contractor Owner-Builder       ,
Engineer Basma,, Ali J; Lic. No.: C53080 21757 DEVONSHIRE ST.   SUITE 3    CANOGA PARK, CA 91311
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

STEPHANIE SWANSON, (213) 469-1255 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/29/2022 Approved BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 9/26/2022 Not Ready for Inspection ANDREW NAVE
Piling/Pier/Caisson 9/26/2022 Not Ready for Inspection ANDREW NAVE
Pre-Inspection 9/26/2022 Not Ready for Inspection ANDREW NAVE
Excavation/Setback/Form/Re-Bar 9/27/2022 Not Ready for Inspection BRENDAN LOONEY
Piling/Pier/Caisson 9/27/2022 Not Ready for Inspection BRENDAN LOONEY
Pre-Inspection 9/27/2022 Not Ready for Inspection BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 11/29/2022 Conditional Approval BRENDAN LOONEY
Footing/Foundation/Slab 11/29/2022 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 12/7/2022 Not Ready for Inspection BRENDAN LOONEY
Piling/Pier/Caisson 12/7/2022 Not Ready for Inspection BRENDAN LOONEY
Footing/Foundation/Slab 12/8/2022 Partial Approval BRENDAN LOONEY
Underground Mechanical 12/20/2022 Corrections Issued BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 2/1/2023 Corrections Issued BRENDAN LOONEY
Footing/Foundation/Slab 2/1/2023 Not Ready for Inspection BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 2/6/2023 Not Ready for Inspection BRENDAN LOONEY
Footing/Foundation/Slab 2/6/2023 Not Ready for Inspection BRENDAN LOONEY
Piling/Pier/Caisson 2/6/2023 Not Ready for Inspection BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 2/7/2023 Approved BRENDAN LOONEY
Deputy Shotcrete 2/9/2023 Conditional Approval MICHAEL PELHAM
PLUMBING-Rough 2/21/2023 Partial Approval KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 2/27/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Piling/Pier/Caisson 2/27/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Reinforced Masonry Frame 2/27/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Underground Mechanical 2/27/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Pre-Inspection 3/2/2023 Approved BRENDAN LOONEY
Structural Steel Frame 3/2/2023 Partial Approval BRENDAN LOONEY
Deputy Reinf. Concrete 3/6/2023 Conditional Approval BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 3/7/2023 Not Ready for Inspection DAVID FEILER
Footing/Foundation/Slab 3/7/2023 Not Ready for Inspection DAVID FEILER
Structural Steel Frame 3/7/2023 Not Ready for Inspection DAVID FEILER
Excavation/Setback/Form/Re-Bar 3/8/2023 Not Ready for Inspection BRENDAN LOONEY
Structural Steel Frame 3/8/2023 Not Ready for Inspection BRENDAN LOONEY
Footing/Foundation/Slab 3/9/2023 Partial Approval BRENDAN LOONEY
Structural Steel Frame 3/9/2023 Partial Approval BRENDAN LOONEY
Deputy Steel/Welding 3/28/2023 Conditional Approval BRENDAN LOONEY
BUILDING-Rough-Frame 4/10/2023 Not Ready for Inspection BRENDAN LOONEY
Green Building Rough 4/10/2023 Not Ready for Inspection BRENDAN LOONEY
Verify Sprinkler Sign Off 4/10/2023 Not Ready for Inspection BRENDAN LOONEY
Wood Frame 4/10/2023 Corrections Issued BRENDAN LOONEY
Deputy Wood Construction 4/11/2023 Conditional Approval STEPHANIE SWANSON
BUILDING-Rough-Frame 4/13/2023 Not Ready for Inspection BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 4/13/2023 Partial Approval BRENDAN LOONEY
Verify Sprinkler Sign Off 4/13/2023 Not Ready for Inspection BRENDAN LOONEY
Wood Frame 4/13/2023 Not Ready for Inspection BRENDAN LOONEY
Deputy Steel/Welding 4/21/2023 No Access for Inspection KENNETH NAGLE
Deputy Steel/Welding 4/25/2023 No Access for Inspection KENNETH NAGLE
Footing/Foundation/Slab 5/4/2023 Not Ready for Inspection BRENDAN LOONEY
Special/Order Compliance 5/10/2023 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Excavation/Setback/Form/Re-Bar 5/11/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Deputy Steel/Welding 5/15/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 5/16/2023 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Deputy Drilled-In Anchors 5/17/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Deputy Wood Construction 5/17/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Partial Approval GERMAN RODRIGUEZ MENDOZA
Deputy Wood Construction 6/1/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 6/2/2023 Partial Approval KENNETH NAGLE
Pre-Inspection 6/26/2023 Approved GERMAN RODRIGUEZ MENDOZA
Deputy Wood Construction 6/27/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 6/29/2023 Partial Approval GERMAN RODRIGUEZ MENDOZA
Deputy Steel/Welding 7/11/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 7/20/2023 Approved GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 7/31/2023 Conditional Approval GERMAN RODRIGUEZ MENDOZA
Pre-Inspection 8/11/2023 Approved GERMAN RODRIGUEZ MENDOZA
Sewer 8/17/2023 Not Ready for Inspection EVAN COOPER
Shower Pan 8/17/2023 Not Ready for Inspection EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 8/18/2023 Corrections Issued EVAN COOPER
Deputy Steel/Welding 8/22/2023 Conditional Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 8/23/2023 Partial Approval EVAN COOPER
HVAC-Rough 8/23/2023 Not Ready for Inspection EVAN COOPER
Sewer 8/23/2023 Not Ready for Inspection EVAN COOPER
Shower Pan 8/23/2023 Approved EVAN COOPER
HVAC-Rough 8/28/2023 Corrections Issued EVAN COOPER
PLUMBING-Rough 8/28/2023 Not Ready for Inspection EVAN COOPER
Sewer 8/28/2023 Approved EVAN COOPER
Underground Mechanical 8/28/2023 Partial Approval EVAN COOPER
PLUMBING-Rough 9/7/2023 Approved EVAN COOPER
Pre-Inspection 9/7/2023 Approved EVAN COOPER
HVAC-Rough 9/13/2023 Approved EVAN COOPER
Insulation 10/30/2023 Not Ready for Inspection EVAN COOPER
Pre-Inspection 10/30/2023 Approved EVAN COOPER
Interior/Exterior Lathing 11/7/2023 Corrections Issued EVAN COOPER
ELECTRICAL-Rough 11/20/2023 Approved EVAN COOPER
BUILDING-Rough-Frame 11/21/2023 Approved EVAN COOPER
ELECTRICAL-Rough 11/21/2023 Approved EVAN COOPER
Green Building Rough 11/21/2023 Approved EVAN COOPER
Interior/Exterior Lathing 11/21/2023 Partial Approval EVAN COOPER
Verify Sprinkler Sign Off 11/21/2023 Approved EVAN COOPER
Insulation 12/13/2023 Corrections Issued EVAN COOPER
Interior/Exterior Lathing 12/13/2023 Approved EVAN COOPER
Drywall Nailing 12/28/2023 Approved EVAN COOPER
Gas Test 8/13/2024 Approved EVAN COOPER
PLUMBING-Final 8/13/2024 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 8/13/2024 SGSOV Approved EVAN COOPER
ELECTRICAL-Final 8/15/2024 Approved EVAN COOPER
HVAC-Final 8/21/2024 Corrections Issued EVAN COOPER
Verify Rec and Parks Fee Memo 8/21/2024 Approved EVAN COOPER
HVAC-Final 9/6/2024 Not Ready for Inspection EVAN COOPER
HVAC-Final 9/16/2024 Approved EVAN COOPER
Final 10/8/2024 Corrections Issued EVAN COOPER
Footing/Foundation/Slab 10/8/2024 Approved EVAN COOPER
Green Building Final 10/8/2024 Approved EVAN COOPER
Reinforced Concrete Frame 10/8/2024 Approved EVAN COOPER
Service/Power Release 10/8/2024 Not Ready for Inspection EVAN COOPER
Smoke Detectors 10/8/2024 Approved EVAN COOPER
Final 10/17/2024 Corrections Issued EVAN COOPER
Service/Power Release 10/17/2024 Not Ready for Inspection EVAN COOPER
Final 10/24/2024 Conditional Approval EVAN COOPER
Service/Power Release 10/24/2024 Approved EVAN COOPER
Final 11/4/2024 Corrections Issued EVAN COOPER