2420 S DUXBURY PL 90034

Certificate Information: 2420 S DUXBURY PL 90034

Application / Permit
21010-30000-02965
Plan Check / Job No.
B21WL02617
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 2-Story S.F.D with Attached Garage and Basement ** 1 of 2 **
Permit Issued
Issued on 3/25/2022
Issuing Office
Current Status
CofO Issued on 6/21/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/28/2021 APPLICANT
Assigned to Plan Check Engineer 7/15/2021 DAVID CASTILLO
Corrections Issued 7/21/2021 DAVID CASTILLO
Quality Review Completed 8/10/2021 TARIK SAOUD
Applicant returned to address corrections 10/5/2021 DAVID CASTILLO
Applicant returned to address corrections 11/3/2021 DAVID CASTILLO
Plan Check Approved 3/11/2022 DAVID CASTILLO
Issued 3/25/2022 APPLICANT
Building Plans Picked Up 3/25/2022 APPLICANT
Permit Finaled 6/21/2024 DANIEL ORRANTE
CofO Issued 6/21/2024 DANIEL ORRANTE
Permit Finaled 6/21/2024 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 9/29/2021 SAUL GARCIA
Eng Process Fee Ord 176,300 Cleared 9/29/2021 SAUL GARCIA
Sewer availability Cleared 9/29/2021 SAUL GARCIA
Hydrant and Access approval Cleared 10/10/2021 JOHN CONNEALLY
Low Impact Development Cleared 3/4/2022 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 3/8/2022 SAUL GARCIA
Grading Pre-Inspection Cleared 3/11/2022 DAVID CASTILLO

Contact Information

Architect Tomaro,, Louie Mark; Lic. No.: C22941 2617 N SEPULVEDA BLVD SUITE 100      MANHATTAN BEACH, CA 90266
Contractor Drexel Construction Management Llc; Lic. No.: 1014160-B 5168 W PICO BLVD      LOS ANGELES, CA 90019
Engineer Messiha,, Hany Gamil; Lic. No.: C56766 19648 MULBERRY DR      WALNUT, CA 91789
Engineer Nester,, Melvin Russell; Lic. No.: C26324 2902 TYLER CT      SIMI VALLEY, CA 93063
Engineer Tucker,, Keith D; Lic. No.: GE841 PO BOX 8133      HUNTINGTON BEACH, CA 92615

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/10/2022 Partial Approval KEVIN SARGSYAN
Green Building Rough 6/9/2022 No Access for Inspection KEVIN SARGSYAN
METHANE-Rough 6/9/2022 No Access for Inspection KEVIN SARGSYAN
Reinforced Concrete Frame 6/9/2022 No Access for Inspection KEVIN SARGSYAN
Verify Sprinkler Sign Off 6/9/2022 No Access for Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 6/13/2022 Partial Approval KEVIN SARGSYAN
Deputy Shotcrete 6/14/2022 No Access for Inspection KENNETH NAGLE
METHANE-Subgrade 6/30/2022 Approved KEVIN SARGSYAN
PLUMBING-Rough 7/1/2022 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 7/14/2022 No Access for Inspection KENNETH NAGLE
Footing/Foundation/Slab 7/21/2022 Partial Approval OGANES TARAKHCHYAN
METHANE-Rough 7/21/2022 Approved OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 9/13/2022 Conditional Approval MICHAEL PELHAM
Footing/Foundation/Slab 9/13/2022 Partial Approval ANDREW NAVE
METHANE-Barrier 9/13/2022 Partial Approval ANDREW NAVE
Underground Mechanical 9/13/2022 Partial Approval ANDREW NAVE
Deputy Drilled-In Anchors 9/22/2022 Conditional Approval OGANES TARAKHCHYAN
Footing/Foundation/Slab 10/4/2022 Partial Approval OGANES TARAKHCHYAN
METHANE-Barrier 10/4/2022 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 10/4/2022 Partial Approval OGANES TARAKHCHYAN
Deputy Reinf. Concrete 10/6/2022 Partial Approval OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 10/27/2022 Partial Approval OGANES TARAKHCHYAN
PLUMBING-Rough 11/1/2022 Approved OGANES TARAKHCHYAN
Footing/Foundation/Slab 11/22/2022 Approved OGANES TARAKHCHYAN
Deputy Reinf. Concrete 11/23/2022 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 11/30/2022 Partial Approval OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 2/10/2023 Corrections Issued ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 5/2/2023 Partial Approval CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 7/3/2023 Corrections Issued CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 7/7/2023 Partial Approval CLAYTON GRAHAM
PLUMBING-Rough 7/20/2023 Approved ARAM AVEDISIAN
HVAC-Rough 8/22/2023 Not Ready for Inspection CLAYTON GRAHAM
Shower Pan 8/22/2023 Not Ready for Inspection CLAYTON GRAHAM
HVAC-Rough 8/28/2023 Corrections Issued KENNETH NAGLE
Shower Pan 8/28/2023 Approved KENNETH NAGLE
HVAC-Rough 8/31/2023 Approved BEN MOLSTAD
Special/Order Compliance 8/31/2023 Partial Inspection CLAYTON GRAHAM
Insulation 9/7/2023 Corrections Issued CLAYTON GRAHAM
ELECTRICAL-Rough 9/11/2023 Partial Approval CLAYTON GRAHAM
Insulation 9/11/2023 Partial Approval CLAYTON GRAHAM
Interior/Exterior Lathing 9/11/2023 Not Ready for Inspection CLAYTON GRAHAM
ELECTRICAL-Rough 9/14/2023 Corrections Issued BEN MOLSTAD
HVAC-Rough 9/14/2023 Corrections Issued BEN MOLSTAD
Interior/Exterior Lathing 9/14/2023 Not Ready for Inspection BEN MOLSTAD
ELECTRICAL-Rough 9/20/2023 Approved BEN MOLSTAD
HVAC-Rough 9/20/2023 Corrections Issued BEN MOLSTAD
Interior/Exterior Lathing 9/20/2023 Approved BEN MOLSTAD
BUILDING-Rough-Frame 9/21/2023 No Access for Inspection MEL KHACHATOURIAN
Green Building Rough 9/21/2023 No Access for Inspection MEL KHACHATOURIAN
HVAC-Rough 9/21/2023 No Access for Inspection MEL KHACHATOURIAN
Interior/Exterior Lathing 9/21/2023 No Access for Inspection MEL KHACHATOURIAN
Verify Sprinkler Sign Off 9/21/2023 No Access for Inspection MEL KHACHATOURIAN
BUILDING-Rough-Frame 10/5/2023 Approved CLAYTON GRAHAM
Green Building Rough 10/5/2023 Approved CLAYTON GRAHAM
HVAC-Rough 10/5/2023 Approved CLAYTON GRAHAM
Interior/Exterior Lathing 10/5/2023 Not Ready for Inspection CLAYTON GRAHAM
Verify Sprinkler Sign Off 10/5/2023 Approved CLAYTON GRAHAM
Insulation 10/11/2023 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 10/11/2023 Partial Approval ARAM AVEDISIAN
Drywall Nailing 10/23/2023 Approved CLAYTON GRAHAM
Sewer 3/6/2024 Approved OGANES TARAKHCHYAN
HVAC-Final 3/28/2024 Corrections Issued OGANES TARAKHCHYAN
HVAC-Rough 3/28/2024 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 3/28/2024 Approved OGANES TARAKHCHYAN
HVAC-Final 4/3/2024 Approved OGANES TARAKHCHYAN
PLUMBING-Final 4/3/2024 Approved OGANES TARAKHCHYAN
ELECTRICAL-Final 4/4/2024 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Final 5/1/2024 Partial Inspection OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 5/1/2024 SGSOV Not Ready OGANES TARAKHCHYAN
ELECTRICAL-Final 5/9/2024 Approved OGANES TARAKHCHYAN
Reinforced Concrete Frame 5/9/2024 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 5/9/2024 SGSOV Not Ready OGANES TARAKHCHYAN
Service/Power Release 5/9/2024 Approved OGANES TARAKHCHYAN
Smoke Detectors 5/9/2024 Approved OGANES TARAKHCHYAN
Structural Steel Frame 5/9/2024 Approved OGANES TARAKHCHYAN
Final 5/31/2024 Conditional Approval MEL KHACHATOURIAN
Green Building Final 5/31/2024 Approved MEL KHACHATOURIAN
SGSOV-Seismic Gas S/O Valve 5/31/2024 SGSOV Approved MEL KHACHATOURIAN
Service/Power Release 5/31/2024 Approved MEL KHACHATOURIAN