Drywall Nailing
|
1/16/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
1/16/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Wood Frame
|
1/16/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
1/22/2025
|
Partial Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
1/22/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
1/22/2025
|
Partial Inspection
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
1/30/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
1/30/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
1/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
2/4/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
2/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
2/6/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
2/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
2/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
2/10/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
2/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Structural Steel Frame
|
2/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
2/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/20/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
2/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
2/20/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/24/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
2/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
2/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
2/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
2/27/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
3/3/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
3/3/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/4/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/5/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/6/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
3/7/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/7/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/13/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/13/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
3/13/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
3/20/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
3/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/27/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
4/1/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
4/1/2025
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
4/4/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
4/4/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
4/10/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Structural Steel Frame
|
4/10/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/10/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
4/11/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
4/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
4/15/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
4/15/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/15/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
4/17/2025
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
4/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
4/22/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
4/22/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
5/7/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
5/8/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
5/9/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
5/12/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Wood Construction
|
5/13/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
5/13/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
5/14/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/15/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/22/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/22/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
5/23/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/23/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
5/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
5/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Insulation
|
5/29/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Wall Anchors
|
5/29/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Wood Frame
|
5/29/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
5/30/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
5/30/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/2/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/2/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/2/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/5/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/5/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
6/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/6/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
6/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wall Anchors
|
6/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
6/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
6/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
6/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wall Anchors
|
6/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
6/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Drywall Nailing
|
6/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Insulation
|
6/11/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
6/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Wood Frame
|
6/11/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wall Anchors
|
6/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/17/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wall Anchors
|
6/17/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/17/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
6/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/24/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/24/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/24/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/24/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/25/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/27/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/27/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/27/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/27/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
6/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
6/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
6/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
6/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/2/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
7/2/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/2/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/2/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/8/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
7/8/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/8/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/8/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/9/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/9/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/9/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
7/9/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/9/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/10/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/10/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/11/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/11/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/11/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/11/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/11/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
7/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
7/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/21/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/21/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/21/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/21/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/23/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
7/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/25/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
7/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/28/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/28/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wall Anchors
|
7/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/28/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/29/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/29/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/29/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/29/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/29/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
7/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
7/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/30/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/1/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
8/1/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
8/1/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
8/1/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
8/6/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
8/8/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
8/11/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
8/11/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
8/11/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/14/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/14/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
8/14/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
8/14/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/15/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/15/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
8/15/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
8/15/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
8/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
8/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/20/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
8/20/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
8/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
8/20/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
8/20/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/21/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/21/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
8/21/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wall Anchors
|
8/21/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
8/21/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
8/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
8/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
8/22/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
8/27/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/3/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/3/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
9/3/2025
|
Partial Inspection
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
9/3/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
9/3/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wall Anchors
|
9/3/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/3/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/4/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
9/4/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
9/4/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Wall Anchors
|
9/4/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/4/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/5/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/5/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
9/5/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
9/5/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wall Anchors
|
9/5/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/5/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/8/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/8/2025
|
No Access for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/8/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/9/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/9/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/9/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/10/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
9/10/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
9/10/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/11/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/11/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/11/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
9/11/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/11/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/16/2025
|
Partial Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/16/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
9/16/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/16/2025
|
Partial Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/17/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/18/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
9/19/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
9/19/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/22/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/22/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/22/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
9/22/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/22/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Wall Anchors
|
9/25/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/26/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
9/26/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wall Anchors
|
9/26/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
9/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/1/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/14/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
10/14/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/15/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/15/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
10/15/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
12/17/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
12/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
12/18/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/18/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
1/15/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
1/15/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
1/27/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
1/27/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
3/10/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
3/10/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/10/2026
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
3/10/2026
|
Partial Approval
|
GREGORY POMISH
|