2006 N LA BREA TER 90046

Certificate Information: 2006 N LA BREA TER 90046

Application / Permit
21010-20000-04396
Plan Check / Job No.
B21VN11577
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
NEW 19' X 29'-5.75" REC. ROOM (WITHOUT PLUMBING FIXTURE) AND STORAGE WITH ROOF DECK. NO INTERAL ACCESS PERMITTED BETWEEN REC. ROOM AND STORAGE. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 4/12/2022
Issuing Office
Current Status
CofO Issued on 8/30/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/26/2021 APPLICANT
Assigned to Plan Check Engineer 9/16/2021 MARVEL DELACRUZ
Corrections Issued 9/18/2021 MARVEL DELACRUZ
Quality Review Completed 9/24/2021 STEVEN KIM
Building Plans Picked Up 9/27/2021 APPLICANT
Plan Check Approved 3/31/2022 RAPHAEL ROSAS
Issued 4/12/2022 APPLICANT
CofO in Progress 8/28/2023 BRIAN SULLIVAN
Permit Finaled 8/30/2023 DEROLD HAUFF
CofO Issued 8/30/2023 DEROLD HAUFF
Permit Finaled 8/30/2023 DEROLD HAUFF

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 10/12/2021 THOMAS LANG
BHO/Hillside ordinance Cleared 10/12/2021 THOMAS LANG
BHO/Hillside ordinance Cleared 10/12/2021 THOMAS LANG
Private street Cleared 10/26/2021 MIGUEL GAMBOA
BHO/Hillside ordinance Cleared 11/3/2021 JEANETTE VONG
Street Frontage Cleared 11/3/2021 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 11/18/2021 JEANETTE VONG
Roof/Waste drainage to street Cleared 11/23/2021 JEANETTE VONG
Distance to fire station Cleared 1/13/2022 GILBERT URREA
Hydrant and Access approval Cleared 1/13/2022 GILBERT URREA
Sewer availability Cleared 1/19/2022 JEANETTE VONG
Low Impact Development Cleared 3/7/2022 CHRIS VONG
GPI Written Notices Cleared 3/31/2022 MARVEL DELACRUZ
Grading Pre-Inspection Cleared 3/31/2022 MARVEL DELACRUZ
Green Code Cleared 3/31/2022 MARVEL DELACRUZ

Contact Information

Contractor I Grace Company Commissioned Private Residences Inc The; Lic. No.: 818523-B 3718 NORTHERN BOULEVARD   SUITE 500    LONG ISLAND CITY, NY 11101
Engineer Garcia,, Lionel Jesus; Lic. No.: S4653 24702 NARBONNE AVE      LOMITA, CA 90717
Engineer Hollingsworth,, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Geologist Hollingsworth,, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/25/2022 Not Ready for Inspection BRIAN SULLIVAN
Deputy Grading 5/31/2022 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/1/2022 Not Ready for Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/9/2022 Not Ready for Inspection BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/10/2022 Corrections Issued BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/14/2022 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 7/12/2022 Partial Approval STUART CHAPMAN
Deputy Reinf. Concrete 7/18/2022 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 8/17/2022 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 8/17/2022 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 9/6/2022 Partial Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 9/8/2022 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 9/20/2022 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 9/30/2022 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 10/20/2022 Partial Approval BRIAN SULLIVAN
Deputy Drilled-In Anchors 12/7/2022 Conditional Approval BRIAN SULLIVAN
Deputy Reinf. Concrete 12/7/2022 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 12/7/2022 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 2/2/2023 Partial Approval BRIAN SULLIVAN
Deputy Wood Construction 2/6/2023 Conditional Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 4/12/2023 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 4/12/2023 Approved BRIAN SULLIVAN
Green Building Rough 4/12/2023 Approved BRIAN SULLIVAN
HVAC-Rough 4/12/2023 Approved BRIAN SULLIVAN
PLUMBING-Rough 4/12/2023 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 4/12/2023 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 5/15/2023 Approved BRIAN SULLIVAN
Insulation 5/15/2023 Approved BRIAN SULLIVAN
Drywall Nailing 5/31/2023 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 5/31/2023 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 7/7/2023 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 7/7/2023 SGSOV Not Ready BRIAN SULLIVAN
Service/Power Release 7/7/2023 Approved BRIAN SULLIVAN
Final 8/25/2023 OK to Issue CofO BRIAN SULLIVAN
Green Building Final 8/25/2023 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 8/25/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 8/25/2023 Approved BRIAN SULLIVAN