Deputy Reinf. Concrete
|
3/6/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
3/7/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
3/24/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
3/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/25/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/27/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/28/2025
|
Approved
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/28/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
4/1/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/3/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/8/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/9/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/10/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
4/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
4/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
4/22/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
4/22/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
4/23/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/9/2025
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/9/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
5/23/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
5/28/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
5/29/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
5/30/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
6/3/2025
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/3/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
6/4/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Pre-Stress Concrete
|
6/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/11/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
6/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/11/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
6/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/12/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/16/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/16/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/17/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/17/2025
|
Approved
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/18/2025
|
Approved
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/18/2025
|
Approved
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/20/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/20/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
6/20/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/23/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/23/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
6/23/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/24/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/24/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
6/24/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/25/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/25/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/26/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/26/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
6/27/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Other (see comments)
|
6/27/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
6/27/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
6/27/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
6/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/27/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
6/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/1/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
7/1/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
7/2/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
7/3/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/7/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/7/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
7/7/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
7/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
7/10/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
7/10/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
7/10/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
7/11/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
7/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Wood Construction
|
7/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
7/16/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
7/16/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
7/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
7/17/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
7/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
7/22/2025
|
Partial Approval
|
BRIAN KELLY
|
|
Green Building Rough
|
7/22/2025
|
Not Ready for Inspection
|
BRIAN KELLY
|
|
Drywall Nailing
|
7/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
8/4/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
8/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
8/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/11/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/12/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
8/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
8/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/14/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/15/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
8/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/21/2025
|
Partial Inspection
|
BRIAN KELLY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/27/2025
|
Corrections Issued
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
8/29/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
9/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
9/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
9/2/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
9/4/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/10/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
9/10/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Interior/Exterior Lathing
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Insulation
|
9/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Fireproofing
|
9/15/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Fireproofing
|
9/16/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Fireproofing
|
9/17/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/17/2025
|
Corrections Issued
|
ROBERT DAVIS
|
|
Deputy Fireproofing
|
9/18/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/18/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
9/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Fireproofing
|
9/19/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Insulation
|
9/29/2025
|
Partial Inspection
|
BRIAN KELLY
|
|
Insulation
|
9/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
9/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
10/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Structural Steel Frame
|
10/3/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Drilled-In Anchors
|
10/6/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
10/7/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
10/7/2025
|
Approved
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
10/7/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
10/8/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/9/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
10/14/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
10/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
10/17/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
10/28/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/29/2025
|
Partial Approval
|
GREGORY POMISH
|
|
SGSOV-Seismic Gas S/O Valve
|
10/31/2025
|
SGSOV Not Ready
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
11/6/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
11/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
11/10/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
11/10/2025
|
No Access for Inspection
|
SCOTT SOBEL
|
|
Light Gage Steel Frame
|
11/13/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
11/17/2025
|
Partial Approval
|
GREGORY POMISH
|
|
T-Bar Ceiling
|
12/2/2025
|
Approved
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
12/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
12/10/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
12/19/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
1/6/2026
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/7/2026
|
Approved
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
1/7/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/8/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/9/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
1/12/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
1/13/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/13/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
1/14/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/14/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
1/15/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/15/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
1/16/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/16/2026
|
Approved
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
1/16/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/20/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/21/2026
|
Approved
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/22/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/23/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/27/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/28/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/29/2026
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Masonry
|
1/30/2026
|
Approved
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
1/30/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Drywall Nailing
|
3/4/2026
|
Approved
|
GREGORY POMISH
|
|
Final
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Final
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
SGSOV-Seismic Gas S/O Valve
|
3/4/2026
|
SGSOV Not Ready
|
GREGORY POMISH
|
|
Smoke Detectors
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
3/4/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
3/9/2026
|
Partial Inspection
|
ROBERT DAVIS
|