18722 W SHERMAN WAY 91335

Certificate Information: 18722 W SHERMAN WAY 91335

Application / Permit
21010-20000-03709
Plan Check / Job No.
B21VN09774
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 4-story, 64-unit apartment (63 units are 100% affordable), with 3-story Type VA factory-built apartments over 1-story Type IA amenity, lobby and supportive services spaces using QPSH incentives (14.00.A.13).
Permit Issued
Issued on 11/20/2024
Issuing Office
Metro
Current Status
Issued on 11/20/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/28/2021 APPLICANT
Assigned to Plan Check Engineer 8/5/2021 RODOLFO ARIAS
Corrections Issued 8/13/2021 RODOLFO ARIAS
Quality Review Completed 8/17/2021 EUGENE BARBEAU
Applicant returned to address corrections 9/8/2021 RODOLFO ARIAS
Applicant returned to address corrections 8/25/2023 RODOLFO ARIAS
Applicant returned to address corrections 11/1/2023 RODOLFO ARIAS
Applicant returned to address corrections 12/8/2023 RODOLFO ARIAS
Applicant returned to address corrections 12/12/2023 RODOLFO ARIAS
Plan Check Approved 11/13/2024 RODOLFO ARIAS
Issued 11/20/2024 APPLICANT
TCO Issued (Expire Date: 11-02-2026) 5/6/2026 RICKEY JACKSON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/2/2022 CARLOS AGUILERA
Sewer availability Cleared 4/2/2022 CARLOS AGUILERA
Address approval Cleared 4/14/2022 CARLOS AGUILERA
Highway dedication Cleared 4/14/2022 CARLOS AGUILERA
Permit Cleared 4/14/2022 CARLOS AGUILERA
Construction near power lines Cleared 4/13/2023 RIDWAN HARDY
Trees in Parkway Cleared 8/14/2023 ADALBERTO VERA
CPC Cleared 9/13/2023 SPENCER WEJROWSKI
Miscellaneous Cleared 9/13/2023 SPENCER WEJROWSKI
Miscellaneous Cleared 9/13/2023 SPENCER WEJROWSKI
Building over 36-ft Cleared 9/28/2023 CALOSHA APPROVED
Green Code Cleared 10/12/2023 AARON COSTA
Fire Marshal Fire Life Safety Cleared 10/18/2023 PEJMAN NOORI
Driveway location Cleared 11/7/2023 MIGUEL CRISOSTOMO
Hydrant and Access approval Cleared 11/16/2023 LAVEON RIDER
Low Impact Development Cleared 11/30/2023 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 11/30/2023 CARLOS AGUILERA
"Q" conditions Cleared 12/6/2023 GISELLE CORELLA
Comm Cor/Mini-Mall Cleared 12/6/2023 GISELLE CORELLA
Comm Cor/Mini-Mall Cleared 12/6/2023 SPENCER WEJROWSKI
Comm Cor/Mini-Mall Cleared 12/6/2023 SPENCER WEJROWSKI
Frnt yard landscape/Water mgmt Cleared 12/6/2023 SPENCER WEJROWSKI
Opn space landscape/Water mgmt Cleared 12/6/2023 SPENCER WEJROWSKI
Permanent Supportive Housing Cleared 12/6/2023 GISELLE CORELLA
Prkng lot landscape/Water mgmt Cleared 12/6/2023 SPENCER WEJROWSKI
Public Housing Cleared 12/6/2023 LUIS ALVAREZ
Site Plan review Cleared 12/6/2023 GISELLE CORELLA
Supp. Use District POD/CDO/TDO Cleared 12/6/2023 SPENCER WEJROWSKI
ZA Case Cleared 12/6/2023 SPENCER WEJROWSKI
ZI Cleared 12/6/2023 SPENCER WEJROWSKI
DAS Clearance Cleared 12/8/2023 RODOLFO ARIAS
Density Bonus 14.00.A.13 Cleared 11/13/2024 RICHARD TRUONG

Contact Information

Architect Flores,, Raeven I; Lic. No.: C32188 234 SOUTH CIRCLE DRIVE      SAN GABRIEL, CA 91776
Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 525 MARKET STREET STE 2850      SAN FRANCISCO, CA 94105
Engineer Derkalousdian,, Hrair Harry; Lic. No.: C79694 3622 VIRGINIA STREET      GLENDALE, CA 91214
Engineer Lenahan,, Nolan George; Lic. No.: C77631 523 W 6TH ST STE 616      LOS ANGELES, CA 90014
Engineer Powers,, Brian Frederick; Lic. No.: C75902 5712 S. VICTORIA AVE      LOS ANGELES, CA 90043
Landscape Architect Chee,, Tina Mae Lan; Lic. No.: LA6159 2435 KENILWORTH AVE      LOS ANGELES, CA 90039

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 3/6/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/6/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/24/2025 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 3/24/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/28/2025 Approved ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 3/28/2025 Partial Approval ROBERT DAVIS
Deputy Shotcrete 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/8/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/11/2025 Approved ROBERT DAVIS
Footing/Foundation/Slab 4/11/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/14/2025 Conditional Approval ROBERT DAVIS
Footing/Foundation/Slab 4/17/2025 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/22/2025 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 4/22/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/23/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/9/2025 Approved ROBERT DAVIS
Footing/Foundation/Slab 5/9/2025 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/23/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/28/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/29/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/30/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/3/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/3/2025 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/4/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/6/2025 Conditional Approval ROBERT DAVIS
Green Building Rough 6/11/2025 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 6/11/2025 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 6/11/2025 Not Ready for Inspection ROBERT DAVIS
Wood Frame 6/11/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/12/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/13/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/13/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/16/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/16/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/17/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/17/2025 Approved ROBERT DAVIS
Deputy Drilled-In Anchors 6/18/2025 Approved ROBERT DAVIS
Deputy Steel/Welding 6/18/2025 Approved ROBERT DAVIS
Deputy Drilled-In Anchors 6/20/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/20/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/20/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/23/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/23/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/23/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/24/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/24/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/24/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/25/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/25/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/26/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/26/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/27/2025 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 6/27/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/27/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/27/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/27/2025 Partial Approval ROBERT DAVIS
Green Building Rough 6/27/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/27/2025 Partial Approval ROBERT DAVIS
Green Building Rough 7/1/2025 Not Ready for Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 7/1/2025 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/1/2025 Partial Approval ROBERT DAVIS
Deputy Wood Construction 7/2/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/3/2025 Conditional Approval ROBERT DAVIS
Green Building Rough 7/7/2025 Not Ready for Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 7/7/2025 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/7/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 7/8/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/10/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/10/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/10/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/14/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/14/2025 Conditional Approval ROBERT DAVIS
Green Building Rough 7/16/2025 Partial Inspection GREGORY POMISH
Pre-Inspection 7/16/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 7/16/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 7/16/2025 Partial Approval GREGORY POMISH
Drywall Nailing 7/17/2025 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 7/17/2025 Not Ready for Inspection ROBERT DAVIS
Wood Frame 7/17/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/22/2025 Partial Approval BRIAN KELLY
Green Building Rough 7/22/2025 Not Ready for Inspection BRIAN KELLY
Drywall Nailing 7/24/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 8/4/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/12/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 8/12/2025 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 8/12/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/15/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 8/15/2025 Partial Approval ROBERT DAVIS
Insulation 8/21/2025 Partial Inspection BRIAN KELLY
Floor/Roof Diaphrgm/Shear Wall 8/27/2025 Corrections Issued ROBERT DAVIS
Deputy Steel/Welding 8/29/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/2/2025 Partial Approval ROBERT DAVIS
Green Building Rough 9/2/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/2/2025 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 9/2/2025 Partial Approval ROBERT DAVIS
Wood Frame 9/2/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/4/2025 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 9/5/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 9/10/2025 Partial Approval JOHN KITCKO
Green Building Rough 9/10/2025 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 9/11/2025 Approved ROBERT DAVIS
Insulation 9/12/2025 Partial Approval ROBERT DAVIS
Deputy Fireproofing 9/15/2025 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 9/16/2025 Conditional Approval ROBERT DAVIS
Deputy Fireproofing 9/17/2025 Conditional Approval ROBERT DAVIS
Special/Order Compliance 9/17/2025 Corrections Issued ROBERT DAVIS
Deputy Fireproofing 9/18/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/18/2025 Partial Approval ROBERT DAVIS
Green Building Rough 9/18/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/18/2025 Partial Approval ROBERT DAVIS
Deputy Fireproofing 9/19/2025 Conditional Approval ROBERT DAVIS
Insulation 9/29/2025 Partial Inspection BRIAN KELLY
Insulation 9/30/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/30/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/2/2025 Partial Approval ROBERT DAVIS
Structural Steel Frame 10/3/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/6/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/7/2025 Partial Approval ROBERT DAVIS
Green Building Rough 10/7/2025 Approved ROBERT DAVIS
Light Gage Steel Frame 10/7/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/8/2025 Conditional Approval ROBERT DAVIS
Insulation 10/9/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/14/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/15/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 10/17/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 10/28/2025 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 10/29/2025 Partial Approval GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 10/31/2025 SGSOV Not Ready GREGORY POMISH
Light Gage Steel Frame 11/6/2025 Partial Approval GREGORY POMISH
Drywall Nailing 11/10/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 11/10/2025 Partial Inspection JEFFREY FULTON
Special/Order Compliance 11/10/2025 No Access for Inspection SCOTT SOBEL
Light Gage Steel Frame 11/13/2025 Partial Approval GREGORY POMISH
Insulation 11/17/2025 Partial Approval GREGORY POMISH
T-Bar Ceiling 12/2/2025 Approved GREGORY POMISH
Light Gage Steel Frame 12/5/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/10/2025 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 12/19/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 1/6/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 1/7/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 1/7/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/9/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 1/12/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/14/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/14/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/16/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/16/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 1/16/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/21/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 1/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/27/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/28/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/29/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/30/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 1/30/2026 Partial Inspection ROBERT DAVIS
Drywall Nailing 3/4/2026 Approved GREGORY POMISH
Final 3/4/2026 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 3/4/2026 Not Ready for Inspection GREGORY POMISH
Green Building Final 3/4/2026 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 3/4/2026 Not Ready for Inspection GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 3/4/2026 SGSOV Not Ready GREGORY POMISH
Smoke Detectors 3/4/2026 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 3/4/2026 Not Ready for Inspection GREGORY POMISH
Wood Frame 3/4/2026 Not Ready for Inspection GREGORY POMISH
Special/Order Compliance 3/9/2026 Partial Inspection ROBERT DAVIS