Pre-Inspection
|
8/27/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
8/30/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Pre-Inspection
|
8/30/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
SWPPP-Const. Storm Water
|
8/30/2024
|
Completed
|
JOHN KITCKO
|
|
Special/Order Compliance
|
8/30/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/11/2024
|
Partial Approval
|
JOHN KITCKO
|
|
SWPPP-Const. Storm Water
|
9/11/2024
|
Not Required
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/17/2024
|
Partial Approval
|
JOHN KITCKO
|
|
SWPPP-Const. Storm Water
|
9/17/2024
|
Completed
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
9/18/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
9/20/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/23/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/23/2024
|
Partial Approval
|
JOHN KITCKO
|
|
SWPPP-Const. Storm Water
|
9/23/2024
|
Completed
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
9/24/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
9/25/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
9/27/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
9/27/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
SWPPP-Const. Storm Water
|
9/27/2024
|
Completed
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
9/27/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
10/1/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
10/1/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
SWPPP-Const. Storm Water
|
10/1/2024
|
Completed
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/1/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
10/2/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
10/3/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
10/3/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/3/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
10/4/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
10/4/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
10/7/2024
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
10/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
10/7/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/8/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
10/8/2024
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
10/8/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
10/8/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/8/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/9/2024
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
10/9/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/10/2024
|
Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/10/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/11/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Shotcrete
|
10/11/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
10/17/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
10/17/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
10/17/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/17/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
10/18/2024
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
10/22/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
10/22/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
10/28/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
10/31/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
10/31/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
10/31/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
10/31/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/4/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
11/6/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
11/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
11/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
11/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/7/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
11/7/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/8/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
11/13/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/13/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
11/21/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
11/21/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
11/21/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
11/21/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/25/2024
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
11/25/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/25/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
11/25/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Structural Steel Frame
|
11/25/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/26/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
11/27/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/5/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/5/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/6/2024
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Reinf. Concrete
|
12/6/2024
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Pre-Stress Concrete
|
12/9/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/9/2024
|
Approved
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
12/9/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/10/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/10/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/11/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/11/2024
|
Approved
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/11/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Green Building Rough
|
12/11/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
12/11/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Special/Order Compliance
|
12/11/2024
|
Partial Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
12/11/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/12/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/12/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/13/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/13/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
12/13/2024
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Excavation/Setback/Form/Re-Bar
|
12/14/2024
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/16/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/16/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/17/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/17/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/18/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/18/2024
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
12/18/2024
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
12/18/2024
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
12/18/2024
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/19/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/19/2024
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/19/2024
|
Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
12/19/2024
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/20/2024
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/20/2024
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/20/2024
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
12/20/2024
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
12/20/2024
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/23/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/23/2024
|
Approved
|
JOHN KITCKO
|
|
Special/Order Compliance
|
12/23/2024
|
Partial Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/24/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/24/2024
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/26/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
12/26/2024
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
12/27/2024
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/27/2024
|
Approved
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/30/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/30/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
12/31/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/31/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/2/2025
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/2/2025
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
1/2/2025
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
1/2/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
1/2/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
1/2/2025
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/3/2025
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/3/2025
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
1/6/2025
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/6/2025
|
Approved
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
1/9/2025
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/9/2025
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
1/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
1/9/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
1/9/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
1/10/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/10/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/13/2025
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/13/2025
|
Conditional Approval
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
1/14/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/14/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
1/14/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Pre-Stress Concrete
|
1/15/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/15/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/15/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
1/15/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Pre-Stress Concrete
|
1/16/2025
|
Approved
|
JOHN KITCKO
|
|
Deputy Reinf. Concrete
|
1/16/2025
|
Approved
|
JOHN KITCKO
|
|
Green Building Rough
|
1/16/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
1/16/2025
|
Partial Approval
|
JOHN KITCKO
|
|
Special/Order Compliance
|
1/16/2025
|
Corrections Issued
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
1/16/2025
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Pre-Stress Concrete
|
1/17/2025
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/17/2025
|
Approved
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/22/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
1/22/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/23/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
1/23/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/24/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
1/24/2025
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
1/30/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/30/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/31/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
2/4/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
2/4/2025
|
Approved
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
2/7/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/7/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
2/10/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/11/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/11/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/12/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
2/12/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
2/12/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
2/12/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
2/12/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/13/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/14/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Pre-Stress Concrete
|
2/18/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/18/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/18/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/4/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
3/5/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
3/7/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
3/11/2025
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/12/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
3/13/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
3/14/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
3/17/2025
|
Conditional Approval
|
GREGORY POMISH
|
|
Pre-Inspection
|
3/17/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Other (see comments)
|
4/25/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
4/25/2025
|
Partial Approval
|
GREGORY POMISH
|