7050 N VAN NUYS BLVD 1-332 91405

Certificate Information: 7050 N VAN NUYS BLVD 1-332 91405

Application / Permit
21010-20000-03635
Plan Check / Job No.
B21VN09467
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 370'11" X 279'4" 6 STORY TOTAL MIXED USE 5 STORY 332 UNITS APARTMENT TYPE III A OVER 1ST FLOOR RETAIL & GARAGE TYPE I A , INCLUDING 37 EXTREMELY LOW INCOME UNITS PER 12.22.A31 PER DIR-2021-6087-TOC-SPR-HCA , NFPA-13 FIRE SPRINKLERS THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 8/23/2024
Issuing Office
Valley
Current Status
Issued on 8/23/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/27/2021 APPLICANT
Disabled Access Plans Picked Up 8/9/2021 APPLICANT
Green Plans Picked Up 8/9/2021 APPLICANT
Assigned to Plan Check Engineer 8/12/2021 RARES BODEA
Corrections Issued 8/17/2021 RARES BODEA
Quality Review Completed 8/25/2021 STEVEN KIM
Building Plans Picked Up 8/26/2021 APPLICANT
Applicant returned to address corrections 11/3/2021 RARES BODEA
Applicant returned to address corrections 11/4/2021 RARES BODEA
Applicant returned to address corrections 7/26/2022 RARES BODEA
Applicant returned to address corrections 1/17/2023 RARES BODEA
Applicant returned to address corrections 1/23/2023 RARES BODEA
Applicant returned to address corrections 1/25/2023 RARES BODEA
Plan Check Approved 1/30/2023 RARES BODEA
Issued 8/23/2024 APPLICANT

Permit Application Clearance Information

Construction near power lines Cleared 3/5/2022 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 4/7/2022 PAMELA TENEZA
Driveway location Cleared 5/3/2022 SHEILA AHORAIAN
Address approval Cleared 6/30/2022 CARLOS AGUILERA
Green Code Cleared 7/6/2022 MICHAEL AYERS
Low Impact Development Cleared 7/6/2022 SARAH YOUSSEF
Roof/Waste drainage to street Cleared 7/6/2022 LEE GUILBEAUX
Hydrant and Access approval Cleared 7/7/2022 KURT CORRAL
Miscellaneous Cleared 7/12/2022 RYAN LY
Miscellaneous Cleared 7/12/2022 RYAN LY
Miscellaneous Cleared 7/12/2022 RYAN LY
Tract Map conditions Cleared 7/12/2022 RYAN LY
ZA Case Cleared 7/12/2022 RYAN LY
Permit Cleared 7/13/2022 LEE GUILBEAUX
Fire Marshall Fire Life Safety Cleared 7/14/2022 PEJMAN NOORI
Highway dedication Cleared 7/21/2022 CARLOS AGUILERA
Building over 3-story or 36-ft Cleared 7/22/2022 CALOSHA APPROVED
Sewer availability Cleared 7/26/2022 CARLOS AGUILERA
Density Bonus 12.22.A.31 Cleared 11/15/2022 MARITESS GO
Opn space landscape/Water mgmt Cleared 12/16/2022 JAZMIN ROQUE
Miscellaneous Cleared 12/28/2022 JAZMIN ROQUE
Site Plan review Cleared 12/28/2022 JAZMIN ROQUE
Public Housing Cleared 1/3/2023 SUNYOUNG KIM
DAS Clearance Cleared 1/9/2023 NORLITO MEDRANO
"Q" conditions Cleared 1/23/2023 JAZMIN ROQUE
Miscellaneous Cleared 1/24/2023 JAZMIN ROQUE

Contact Information

Architect Mankar,, Abhijeet D; Lic. No.: C29368 3253 ROMULUS STREET      LOS ANGELES, CA 90065
Contractor M W Residential Socal Corp; Lic. No.: 1043221-B 12655 W 54TH DRIVE      ARVADA, CO 80002
Engineer Aden,, Mark; Lic. No.: S4779 1224 W. RIVERSIDE AVE., #208      SPOKANE, WA 99201
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

MELVIN GIRTON, (818) 374-1128 Office Hours: 7:00-8:00 AM MON-FRI
RICKEY JACKSON, (818) 374-1128 Office Hours: 7:00-8:00 AM MON-FRI
JEFFREY DURAN, (818) 374-1128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/27/2024 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 8/30/2024 Partial Approval JOHN KITCKO
Pre-Inspection 8/30/2024 Partial Inspection JOHN KITCKO
SWPPP-Const. Storm Water 8/30/2024 Completed JOHN KITCKO
Special/Order Compliance 8/30/2024 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 9/11/2024 Partial Approval JOHN KITCKO
SWPPP-Const. Storm Water 9/11/2024 Not Required JOHN KITCKO
Footing/Foundation/Slab 9/17/2024 Partial Approval JOHN KITCKO
SWPPP-Const. Storm Water 9/17/2024 Completed JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/18/2024 Partial Approval JOHN KITCKO
Special/Order Compliance 9/18/2024 Partial Inspection JOHN KITCKO
Special/Order Compliance 9/20/2024 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/23/2024 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 9/23/2024 Partial Approval JOHN KITCKO
SWPPP-Const. Storm Water 9/23/2024 Completed JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/24/2024 Partial Approval JOHN KITCKO
Deputy Reinf. Concrete 9/25/2024 Conditional Approval JOHN KITCKO
Green Building Rough 9/27/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 9/27/2024 Conditional Approval JOHN KITCKO
SWPPP-Const. Storm Water 9/27/2024 Completed JOHN KITCKO
Verify Sprinkler Sign Off 9/27/2024 Not Ready for Inspection JOHN KITCKO
Green Building Rough 10/1/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/1/2024 Partial Inspection JOHN KITCKO
SWPPP-Const. Storm Water 10/1/2024 Completed JOHN KITCKO
Verify Sprinkler Sign Off 10/1/2024 Not Ready for Inspection JOHN KITCKO
Footing/Foundation/Slab 10/2/2024 Partial Approval JOHN KITCKO
Green Building Rough 10/3/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/3/2024 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 10/3/2024 Not Ready for Inspection JOHN KITCKO
Deputy Shotcrete 10/4/2024 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 10/4/2024 Partial Inspection JOHN KITCKO
Deputy Shotcrete 10/7/2024 Approved JOHN KITCKO
Green Building Rough 10/7/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/7/2024 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 10/7/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 10/8/2024 Approved JOHN KITCKO
Deputy Shotcrete 10/8/2024 Approved JOHN KITCKO
Green Building Rough 10/8/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/8/2024 Conditional Approval JOHN KITCKO
Verify Sprinkler Sign Off 10/8/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 10/9/2024 Approved JOHN KITCKO
Footing/Foundation/Slab 10/9/2024 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 10/10/2024 Approved JOHN KITCKO
Special/Order Compliance 10/10/2024 Partial Inspection JOHN KITCKO
Deputy Reinf. Concrete 10/11/2024 Conditional Approval JOHN KITCKO
Deputy Shotcrete 10/11/2024 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 10/17/2024 Partial Inspection JOHN KITCKO
Green Building Rough 10/17/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/17/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 10/17/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 10/18/2024 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/22/2024 Partial Approval JOHN KITCKO
Special/Order Compliance 10/22/2024 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 10/28/2024 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 10/31/2024 Partial Approval JOHN KITCKO
Green Building Rough 10/31/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 10/31/2024 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 10/31/2024 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 11/4/2024 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/6/2024 Partial Approval JOHN KITCKO
Footing/Foundation/Slab 11/7/2024 Not Ready for Inspection JOHN KITCKO
Green Building Rough 11/7/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 11/7/2024 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 11/7/2024 Conditional Approval JOHN KITCKO
Verify Sprinkler Sign Off 11/7/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 11/8/2024 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 11/13/2024 Partial Approval JOHN KITCKO
Special/Order Compliance 11/13/2024 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 11/21/2024 Partial Approval JOHN KITCKO
Green Building Rough 11/21/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 11/21/2024 Partial Inspection JOHN KITCKO
Verify Sprinkler Sign Off 11/21/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 11/25/2024 Approved JOHN KITCKO
Footing/Foundation/Slab 11/25/2024 Partial Approval JOHN KITCKO
Special/Order Compliance 11/25/2024 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 11/25/2024 Partial Approval JOHN KITCKO
Structural Steel Frame 11/25/2024 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 11/26/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/27/2024 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 12/5/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/5/2024 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/6/2024 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/6/2024 Conditional Approval ANDREW DORSO
Deputy Pre-Stress Concrete 12/9/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/9/2024 Approved JOHN KITCKO
Footing/Foundation/Slab 12/9/2024 Partial Approval JOHN KITCKO
Deputy Pre-Stress Concrete 12/10/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/10/2024 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 12/11/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/11/2024 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/11/2024 Partial Approval JOHN KITCKO
Green Building Rough 12/11/2024 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 12/11/2024 Partial Inspection JOHN KITCKO
Special/Order Compliance 12/11/2024 Partial Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/11/2024 Not Ready for Inspection JOHN KITCKO
Deputy Pre-Stress Concrete 12/12/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/12/2024 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 12/13/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 12/13/2024 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 12/13/2024 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/14/2024 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/16/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/16/2024 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 12/17/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 12/17/2024 Conditional Approval JOHN KITCKO
Deputy Pre-Stress Concrete 12/18/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/18/2024 Approved JOHN KITCKO
Green Building Rough 12/18/2024 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 12/18/2024 Not Ready for Inspection JEFFREY DURAN
Verify Sprinkler Sign Off 12/18/2024 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 12/19/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/19/2024 Approved JEFFREY DURAN
Deputy Reinf. Concrete 12/19/2024 Approved JOHN KITCKO
Special/Order Compliance 12/19/2024 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/20/2024 Approved JEFFREY DURAN
Deputy Reinf. Concrete 12/20/2024 Approved JEFFREY DURAN
Green Building Rough 12/20/2024 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 12/20/2024 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 12/20/2024 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 12/23/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/23/2024 Approved JOHN KITCKO
Special/Order Compliance 12/23/2024 Partial Approval JOHN KITCKO
Deputy Pre-Stress Concrete 12/24/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 12/24/2024 Conditional Approval JOHN KITCKO
Deputy Pre-Stress Concrete 12/26/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/26/2024 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 12/27/2024 Approved JEFFREY DURAN
Deputy Reinf. Concrete 12/27/2024 Approved JEFFREY DURAN
Deputy Pre-Stress Concrete 12/30/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/30/2024 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/31/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/31/2024 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 1/2/2025 Approved JEFFREY DURAN
Deputy Reinf. Concrete 1/2/2025 Approved JOHN KITCKO
Green Building Rough 1/2/2025 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 1/2/2025 Partial Approval JEFFREY DURAN
Special/Order Compliance 1/2/2025 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 1/2/2025 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 1/3/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/3/2025 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 1/6/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/6/2025 Approved JOHN KITCKO
Deputy Pre-Stress Concrete 1/9/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/9/2025 Approved JOHN KITCKO
Green Building Rough 1/9/2025 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 1/9/2025 Partial Approval JOHN KITCKO
Special/Order Compliance 1/9/2025 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 1/9/2025 Not Ready for Inspection JOHN KITCKO
Deputy Pre-Stress Concrete 1/10/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/10/2025 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 1/13/2025 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 1/13/2025 Conditional Approval JOHN KITCKO
Deputy Pre-Stress Concrete 1/14/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/14/2025 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 1/14/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/15/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/15/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/15/2025 Conditional Approval JEFFREY DURAN
Special/Order Compliance 1/15/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 1/16/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 1/16/2025 Approved JOHN KITCKO
Green Building Rough 1/16/2025 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 1/16/2025 Partial Approval JOHN KITCKO
Special/Order Compliance 1/16/2025 Corrections Issued JOHN KITCKO
Verify Sprinkler Sign Off 1/16/2025 Not Ready for Inspection JOHN KITCKO
Deputy Pre-Stress Concrete 1/17/2025 Approved JEFFREY DURAN
Deputy Reinf. Concrete 1/17/2025 Approved JEFFREY DURAN
Deputy Pre-Stress Concrete 1/22/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 1/22/2025 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 1/23/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 1/23/2025 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 1/24/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 1/24/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 1/30/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/30/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/31/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/4/2025 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 2/4/2025 Approved JEFFREY DURAN
Deputy Pre-Stress Concrete 2/7/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/7/2025 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 2/10/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/11/2025 Conditional Approval GREGORY POMISH
Deputy Wood Construction 2/11/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/12/2025 Conditional Approval GREGORY POMISH
Deputy Wood Construction 2/12/2025 Conditional Approval GREGORY POMISH
Green Building Rough 2/12/2025 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/12/2025 Not Ready for Inspection GREGORY POMISH
Wood Frame 2/12/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/13/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/14/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 2/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/18/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 3/4/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/5/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/11/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 3/12/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/13/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/14/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/17/2025 Conditional Approval GREGORY POMISH
Pre-Inspection 3/17/2025 Not Ready for Inspection GREGORY POMISH
Deputy Other (see comments) 4/25/2025 Partial Approval GREGORY POMISH
Deputy Steel/Welding 4/25/2025 Partial Approval GREGORY POMISH