|
Pre-Inspection
|
4/7/2023
|
Partial Inspection
|
ANDREW DORSO
|
|
Footing/Foundation/Slab
|
6/29/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Green Building Rough
|
6/29/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
6/29/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
SWPPP-Const. Storm Water
|
6/29/2023
|
Not Required
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
6/29/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
6/30/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
6/30/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
7/7/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
7/7/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
SWPPP-Const. Storm Water
|
7/7/2023
|
Completed
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
7/7/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Wood Frame
|
7/7/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/18/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
7/18/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
7/18/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
SWPPP-Const. Storm Water
|
7/18/2023
|
Completed
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
7/18/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
7/20/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
7/28/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
7/28/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
SWPPP-Const. Storm Water
|
7/28/2023
|
Completed
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
7/28/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
8/2/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
8/2/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
SWPPP-Const. Storm Water
|
8/2/2023
|
Not Required
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
8/2/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Green Building Rough
|
8/7/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
8/7/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
SWPPP-Const. Storm Water
|
8/7/2023
|
Completed
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
8/7/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
8/8/2023
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/10/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
8/10/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
8/10/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
8/10/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
SWPPP-Const. Storm Water
|
8/10/2023
|
Completed
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
8/10/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/5/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
9/14/2023
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
9/14/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
9/14/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SWPPP-Const. Storm Water
|
9/14/2023
|
Completed
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
9/14/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
9/15/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
9/18/2023
|
Conditional Approval
|
JOHN KITCKO
|
|
Footing/Foundation/Slab
|
9/26/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
9/26/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/27/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/27/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
9/27/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
9/27/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
9/27/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/28/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/28/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
9/29/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
9/29/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
10/2/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
10/2/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
10/3/2023
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
10/3/2023
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
10/3/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
10/3/2023
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
10/3/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SWPPP-Const. Storm Water
|
10/3/2023
|
Completed
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
10/3/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
10/5/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
10/5/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
10/5/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/5/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
10/6/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
10/11/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
10/11/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/11/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
10/12/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
10/17/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
10/17/2023
|
Corrections Issued
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/17/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
10/18/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
10/20/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
10/20/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/20/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Green Building Rough
|
10/24/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
10/24/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
10/24/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
10/26/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
11/2/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
11/3/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
11/3/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Reinforced Masonry Frame
|
11/3/2023
|
Partial Approval
|
JOHN KITCKO
|
|
Verify Sprinkler Sign Off
|
11/3/2023
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Green Building Rough
|
11/6/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Concrete Frame
|
11/6/2023
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/6/2023
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Reinforced Masonry Frame
|
11/7/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
11/9/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Green Building Rough
|
11/9/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Masonry Frame
|
11/9/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
11/9/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Green Building Rough
|
12/5/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
12/5/2023
|
Partial Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
12/5/2023
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
12/6/2023
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
12/7/2023
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
12/7/2023
|
Conditional Approval
|
JEFFREY FULTON
|
|
Green Building Rough
|
12/12/2023
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Reinforced Concrete Frame
|
12/12/2023
|
Partial Inspection
|
DEANDRE HOFFMAN
|
|
Verify Sprinkler Sign Off
|
12/12/2023
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Reinforced Masonry Frame
|
12/13/2023
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/17/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Reinforced Concrete Frame
|
1/17/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Verify Sprinkler Sign Off
|
1/17/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Reinforced Masonry Frame
|
1/23/2024
|
Corrections Issued
|
JOHN KITCKO
|
|
Green Building Rough
|
1/25/2024
|
Not Ready for Inspection
|
STEVEN LEVITT
|
|
Reinforced Concrete Frame
|
1/25/2024
|
Not Ready for Inspection
|
STEVEN LEVITT
|
|
Verify Sprinkler Sign Off
|
1/25/2024
|
Not Ready for Inspection
|
STEVEN LEVITT
|
|
Reinforced Masonry Frame
|
1/26/2024
|
Partial Approval
|
STEVEN LEVITT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/13/2024
|
Partial Approval
|
DEANDRE HOFFMAN
|
|
Green Building Rough
|
2/14/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Verify Sprinkler Sign Off
|
2/14/2024
|
Not Ready for Inspection
|
DEANDRE HOFFMAN
|
|
Wood Frame
|
2/14/2024
|
Corrections Issued
|
DEANDRE HOFFMAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/27/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
2/28/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
2/28/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/1/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
3/1/2024
|
Corrections Issued
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
3/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
3/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
3/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/19/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/22/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/3/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2024
|
Approved
|
ROBERT DAVIS
|
|
Drywall Nailing
|
4/23/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
4/23/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
5/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/24/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
5/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/11/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/11/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
6/11/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/17/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/25/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/28/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/28/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
6/28/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
7/1/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/5/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/5/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
7/5/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
7/9/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/11/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
7/12/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/16/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/16/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
7/16/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/23/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
7/23/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/23/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/25/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/29/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
7/29/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
7/29/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
8/7/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
8/7/2024
|
Approved
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
8/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
8/9/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/13/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
8/15/2024
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
8/15/2024
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
8/16/2024
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/19/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/20/2024
|
Corrections Issued
|
ROBERT DAVIS
|
|
Insulation
|
8/21/2024
|
Corrections Issued
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
8/22/2024
|
Corrections Issued
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
8/23/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
8/23/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Drywall Nailing
|
8/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
8/27/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/28/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
8/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
9/4/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/5/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
9/5/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/5/2024
|
Not Ready for Inspection
|
CHRISTOPHER BLACKWOOD
|
|
Verify Sprinkler Sign Off
|
9/5/2024
|
Approved
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/6/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
9/10/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
9/12/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
9/13/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/17/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
9/17/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
9/18/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
9/19/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
9/20/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
9/24/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
9/27/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
10/1/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/2/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
SWPPP-Const. Storm Water
|
10/4/2024
|
Not Required
|
ROBERT DAVIS
|
|
Wood Frame
|
10/4/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/7/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
10/8/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/9/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/10/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
10/10/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/11/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
10/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
10/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
10/16/2024
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Wood Frame
|
10/17/2024
|
Not Ready for Inspection
|
MARTIN TAVITIAN
|
|
Insulation
|
10/18/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
10/21/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Insulation
|
10/22/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
10/23/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
10/24/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Insulation
|
10/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
10/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
10/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
11/1/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
11/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
11/6/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
11/8/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
11/13/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
11/18/2024
|
Partial Inspection
|
BRIAN KELLY
|
|
Insulation
|
11/19/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
11/22/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
11/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
12/2/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
12/4/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
12/6/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
12/11/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
12/13/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
12/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
12/19/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
12/20/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
12/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Drilled-In Anchors
|
1/22/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
2/3/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
2/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
2/13/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
2/25/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
2/27/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
3/4/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/20/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
3/20/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
3/24/2025
|
Approved
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
4/2/2025
|
Approved
|
ROBERT DAVIS
|
|
Masonry Wall/Backfill
|
4/16/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
5/6/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
8/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Final
|
8/21/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
8/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Final
|
8/21/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
8/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
SGSOV-Seismic Gas S/O Valve
|
8/21/2025
|
SGSOV Not Ready
|
GREGORY POMISH
|
|
Smoke Detectors
|
8/21/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
8/21/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Final
|
9/11/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Green Building Final
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
SGSOV-Seismic Gas S/O Valve
|
9/11/2025
|
SGSOV Approved
|
ROBERT DAVIS
|
|
Smoke Detectors
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Wood Frame
|
9/11/2025
|
Approved
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/12/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/15/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
9/18/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
2/18/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Final
|
2/19/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Final
|
2/20/2026
|
OK to Issue CofO
|
ROBERT DAVIS
|
|
SWPPP-Const. Storm Water
|
2/20/2026
|
Not Required
|
ROBERT DAVIS
|