428-428 1/2 S ARNAZ DR 90048

Certificate Information: 428-428 1/2 S ARNAZ DR 90048

Application / Permit
21010-20000-03177
Plan Check / Job No.
B21VN08190
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
NEW 57'-11" x 40'-10" 3-STORY DUPLEX W/ ATT. GARAGE AND ROOFTOP DECK (BUILDING B); AUTOMATIC SPRINKLER SYSTEM IS REQUIRED
Permit Issued
Issued on 6/12/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/13/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/25/2021 APPLICANT
Assigned to Plan Check Engineer 7/29/2021 SEAN SHAHMIRI
Corrections Issued 8/1/2021 SEAN SHAHMIRI
Quality Review Completed 8/12/2021 OMID HEDAYAT
Building Plans Picked Up 8/13/2021 APPLICANT
Applicant returned to address corrections 9/13/2021 SEAN SHAHMIRI
Applicant returned to address corrections 1/25/2022 SEAN SHAHMIRI
Applicant returned to address corrections 2/8/2022 SEAN SHAHMIRI
Plan Check Approved 3/1/2022 SEAN SHAHMIRI
Issued 6/12/2023 APPLICANT
CofO in Progress 5/9/2025 MICHAEL PELHAM
Permit Finaled 5/13/2025 RICHARD STEINBACH
CofO Issued 5/13/2025 RICHARD STEINBACH
Permit Finaled 5/13/2025 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 8/18/2021 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 8/30/2021 STEVE MELGAR
Sewer availability Cleared 8/30/2021 STEVE MELGAR
Building over 36-ft Cleared 9/13/2021 CALOSHA APPROVED
Miscellaneous Cleared 9/28/2021 DANG NGUYEN
Hydrant and Access approval Cleared 12/1/2021 GILBERT URREA
Construction near power lines Cleared 12/4/2021 RIDWAN HARDY
Low Impact Development Cleared 1/7/2022 JONATAN VELASQUEZ
Roof/Waste drainage to street Cleared 1/10/2022 STEVE MELGAR

Contact Information

Architect Stockton,, Kenneth; Lic. No.: C19870 26500 W AGOURA RD. PMB # 844      CALABASAS, CA 91302
Contractor Owner-Builder       ,
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804

Inspector Information

WILBER ROSALES, (310) 914-3892 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 12/14/2023 No Access for Inspection MEL KHACHATOURIAN
Deputy Reinf. Concrete 12/18/2023 Conditional Approval MICHAEL PELHAM
METHANE-Rough 1/19/2024 Not Ready for Inspection MEL KHACHATOURIAN
METHANE-Subgrade 1/19/2024 Approved MEL KHACHATOURIAN
Deputy Methane Barrier 1/31/2024 Conditional Approval MICHAEL PELHAM
Footing/Foundation/Slab 2/22/2024 Approved MEL KHACHATOURIAN
METHANE-Barrier 2/22/2024 Approved MEL KHACHATOURIAN
Deputy Steel/Welding 3/20/2024 No Access for Inspection MEL KHACHATOURIAN
Deputy Steel/Welding 3/26/2024 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 4/4/2024 Partial Approval MEL KHACHATOURIAN
Structural Steel Frame 4/4/2024 Not Ready for Inspection MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 4/19/2024 Partial Approval MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 5/8/2024 Partial Approval MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 5/15/2024 Partial Approval MEL KHACHATOURIAN
ELECTRICAL-Rough 7/3/2024 Not Ready for Inspection MEL KHACHATOURIAN
Floor/Roof Diaphrgm/Shear Wall 7/3/2024 Approved MEL KHACHATOURIAN
HVAC-Rough 7/3/2024 Approved MEL KHACHATOURIAN
PLUMBING-Rough 7/3/2024 Approved MEL KHACHATOURIAN
BUILDING-Rough-Frame 7/10/2024 Not Ready for Inspection MEL KHACHATOURIAN
ELECTRICAL-Rough 7/10/2024 Partial Approval MEL KHACHATOURIAN
BUILDING-Rough-Frame 7/19/2024 Corrections Issued MEL KHACHATOURIAN
Interior/Exterior Lathing 7/19/2024 Partial Approval MEL KHACHATOURIAN
BUILDING-Rough-Frame 7/26/2024 Partial Approval SEAN HAUPT
Green Building Rough 7/26/2024 Approved SEAN HAUPT
METHANE-Rough 7/26/2024 Approved SEAN HAUPT
PLUMBING-Rough 7/26/2024 Approved SEAN HAUPT
Verify Sprinkler Sign Off 7/26/2024 Approved SEAN HAUPT
Insulation 7/31/2024 Approved SEAN HAUPT
Shower Pan 7/31/2024 Approved SEAN HAUPT
Interior/Exterior Lathing 8/5/2024 Approved SEAN HAUPT
Drywall Nailing 8/22/2024 Approved DANIEL VERA
Sewer 10/29/2024 Not Ready for Inspection MEL KHACHATOURIAN
Underground Mechanical 11/7/2024 Partial Approval MEL KHACHATOURIAN
Underground Mechanical 11/25/2024 Not Ready for Inspection MEL KHACHATOURIAN
Underground Mechanical 11/26/2024 Approved SEAN HAUPT
Gas Test 1/16/2025 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 1/16/2025 SGSOV Approved EVAN COOPER
ELECTRICAL-Final 3/17/2025 Not Ready for Inspection SEAN HAUPT
HVAC-Final 3/17/2025 Corrections Issued SEAN HAUPT
ELECTRICAL-Final 3/26/2025 Approved EVAN COOPER
HVAC-Final 3/26/2025 Approved EVAN COOPER
PLUMBING-Final 3/26/2025 Approved EVAN COOPER
Service/Power Release 4/28/2025 Approved MICHAEL PELHAM
BUILDING-Rough-Frame 5/6/2025 Approved EVAN COOPER
Final 5/6/2025 Corrections Issued EVAN COOPER
Green Building Final 5/6/2025 Approved EVAN COOPER
Smoke Detectors 5/6/2025 Approved EVAN COOPER
Final 5/9/2025 OK to Issue CofO MICHAEL PELHAM