1511 N SKYLARK LANE 90069

Certificate Information: 1511 N SKYLARK LANE 90069

Application / Permit
21010-20000-02437
Plan Check / Job No.
B21VN06041
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 3-STORY SFD (2877 SQFT) OVER BASEMENT (1754 SQFT) WITH ATT. 2-CAR GARAGE(400 SQFT), (56'- 11" x 28'-10"),2877 SQFT W/ ATTACHED DECK ON PILES, NFPA-13D SPRINKLERS THROUGHOUT
Permit Issued
Issued on 10/26/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/5/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/14/2021 APPLICANT
Assigned to Plan Check Engineer 6/17/2021 PETER MOSESIAN
Corrections Issued 6/24/2021 PETER MOSESIAN
Quality Review Completed 7/13/2021 OMID HEDAYAT
Building Plans Picked Up 7/28/2021 APPLICANT
Plan Check Approved 9/27/2022 PETER MOSESIAN
Issued 10/26/2023 APPLICANT
CofO in Progress 4/28/2026 CRAIG VAUGHAN
No Progress 5/1/2026 DEROLD HAUFF
CofO in Progress 5/1/2026 DEROLD HAUFF
CofO Issued 5/5/2026 DEROLD HAUFF
Permit Finaled 5/5/2026 DEROLD HAUFF

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 6/30/2021 RENZ SORIANO
BHO/Hillside ordinance Cleared 6/30/2021 RENZ SORIANO
BHO/Hillside ordinance Cleared 6/30/2021 RENZ SORIANO
BHO/Hillside ordinance Cleared 6/30/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 6/30/2021 RENZ SORIANO
Address approval Cleared 7/1/2021 RENZ SORIANO
Permit Cleared 7/1/2021 RENZ SORIANO
BHO/Hillside ordinance Cleared 10/6/2021 RENZ SORIANO
Private street Cleared 10/6/2021 NELSON RODRIGUEZ
ZA Case Cleared 10/6/2021 DANIEL CORONADO
Sewer availability Cleared 12/20/2021 JEANETTE VONG
Trees in Parkway Cleared 1/11/2022 ADALBERTO VERA
Hydrant and Access approval Cleared 1/14/2022 GILBERT URREA
Low Impact Development Cleared 5/24/2022 LONDY ALVARADO
Disturb/Remove Protected Trees Cleared 6/1/2022 ADALBERTO VERA
Roof/Waste drainage to street Cleared 6/2/2022 CELINA MORENO

Contact Information

Contractor Colega Build Inc; Lic. No.: 1055953-B 4334 SEPULVEDA BLVD      CULVER CITY, CA 90230
Engineer Barr,, Joseph Daniel; Lic. No.: C70708 1185 HERITAGE FARM RD      HICKORY, NC 28601
Engineer Markov,, George P; Lic. No.: C55855 1623 THOMPSON AVE      GLENDALE, CA 91201
Engineer Ostowari,, Sohrab; Lic. No.: C41014 7012 HELMSDALE RD      WEST HILLS, CA 91307
Geologist Miller,, Jonathan Steven; Lic. No.: EG2391 24736 CALVERT STREET      WOODLAND HILLS, CA 91367

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/29/2024 Partial Inspection RAUL BARAJAS
Piling/Pier/Caisson 4/4/2024 Partial Inspection RAUL BARAJAS
Deputy Reinf. Concrete 5/1/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 5/2/2024 Approved RAUL BARAJAS
Piling/Pier/Caisson 5/2/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 5/3/2024 Conditional Approval RAUL BARAJAS
Deputy Drilled-In Anchors 5/16/2024 Conditional Approval RAUL BARAJAS
Deputy Drilled-In Anchors 6/3/2024 Conditional Approval BRIAN SULLIVAN
Piling/Pier/Caisson 7/2/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 7/3/2024 Conditional Approval RAUL BARAJAS
Deputy Drilled-In Anchors 7/10/2024 Conditional Approval ROY SPAULDING
Deputy Drilled-In Anchors 8/1/2024 Conditional Approval ANTHONY RAMOS
Deputy Grading 8/2/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 8/14/2024 Conditional Approval BRENDAN MORELLI
Excavation/Setback/Form/Re-Bar 8/14/2024 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 8/14/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 8/15/2024 Conditional Approval RAUL BARAJAS
Deputy Grading 8/27/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 8/29/2024 Conditional Approval RAUL BARAJAS
Footing/Foundation/Slab 8/30/2024 Partial Approval RAUL BARAJAS
Protected Tree Letter 8/30/2024 Approved RAUL BARAJAS
Deputy Drilled-In Anchors 9/16/2024 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 9/16/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 9/18/2024 Conditional Approval RAUL BARAJAS
Deputy Shotcrete 9/18/2024 Conditional Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/2/2024 Conditional Approval CRAIG VAUGHAN
Excavation/Setback/Form/Re-Bar 10/3/2024 Partial Approval BRENDAN MORELLI
PLUMBING-Rough 10/3/2024 Partial Approval BRENDAN MORELLI
Deputy Reinf. Concrete 10/4/2024 Conditional Approval NICHOLAS LOPEZ
Footing/Foundation/Slab 10/11/2024 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 10/18/2024 Conditional Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 12/12/2024 Partial Approval BRENDAN MORELLI
Floor/Roof Diaphrgm/Shear Wall 12/31/2024 Partial Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 1/28/2025 Corrections Issued RAUL BARAJAS
PLUMBING-Rough 3/18/2025 Corrections Issued BRENDAN MORELLI
HVAC-Rough 4/7/2025 Approved ROY SPAULDING
PLUMBING-Rough 4/7/2025 Approved ROY SPAULDING
Deputy Drilled-In Anchors 4/10/2025 Conditional Approval ALIZAH MAYAGOITIA
Green Building Rough 4/15/2025 Not Ready for Inspection ROY SPAULDING
Reinforced Concrete Frame 4/15/2025 Partial Approval ROY SPAULDING
Verify Sprinkler Sign Off 4/15/2025 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Rough 4/23/2025 Approved SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 4/28/2025 Approved ROY SPAULDING
Insulation 6/9/2025 Not Ready for Inspection BRENDAN MORELLI
Structural Steel Frame 6/13/2025 Approved RAUL BARAJAS
Wood Frame 6/13/2025 Approved RAUL BARAJAS
Insulation 6/18/2025 Approved ROY SPAULDING
Insulation 6/20/2025 Approved RAUL BARAJAS
Interior/Exterior Lathing 6/20/2025 Approved RAUL BARAJAS
Drywall Nailing 7/3/2025 Conditional Approval JOSH MEISTER
Green Building Rough 7/3/2025 Not Ready for Inspection JOSH MEISTER
Interior/Exterior Lathing 8/14/2025 Approved JOSH MEISTER
Sewer 8/14/2025 Approved JOSH MEISTER
Shower Pan 8/14/2025 Approved JOSH MEISTER
Underground Mechanical 8/14/2025 Approved JOSH MEISTER
PLUMBING-Final 12/24/2025 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Final 12/29/2025 Corrections Issued CRAIG VAUGHAN
Gas Test 12/30/2025 Approved CRAIG VAUGHAN
PLUMBING-Final 12/30/2025 Partial Approval CRAIG VAUGHAN
ELECTRICAL-Final 1/14/2026 Not Ready for Inspection CRAIG VAUGHAN
HVAC-Final 1/14/2026 Approved CRAIG VAUGHAN
PLUMBING-Final 1/14/2026 Approved CRAIG VAUGHAN
ELECTRICAL-Final 2/9/2026 Corrections Issued CRAIG VAUGHAN
Service/Power Release 2/9/2026 Approved CRAIG VAUGHAN
ELECTRICAL-Final 3/18/2026 Approved SCOTT FINNILA
Final 3/18/2026 Corrections Issued SCOTT FINNILA
Pre-Inspection 3/31/2026 Partial Inspection SCOTT FINNILA
BUILDING-Rough-Frame 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Drywall Nailing 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Final 4/16/2026 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Green Building Final 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Reinforced Concrete Frame 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 4/16/2026 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 4/27/2026 Approved CRAIG VAUGHAN
Drywall Nailing 4/27/2026 Approved CRAIG VAUGHAN
Final 4/27/2026 OK to Issue CofO CRAIG VAUGHAN
Footing/Foundation/Slab 4/27/2026 Approved CRAIG VAUGHAN
Green Building Final 4/27/2026 Approved CRAIG VAUGHAN
Green Building Rough 4/27/2026 Approved CRAIG VAUGHAN
Reinforced Concrete Frame 4/27/2026 Approved CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 4/27/2026 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 4/27/2026 Approved CRAIG VAUGHAN
Verify Sprinkler Sign Off 4/27/2026 Approved CRAIG VAUGHAN