11013 W HARTSOOK ST 101-505 91601

Certificate Information: 11013 W HARTSOOK ST 101-505 91601

Application / Permit
21010-20000-02289
Plan Check / Job No.
B21VN05617
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 127'4" X 38'8" FIVE STORY TOTAL 25 UNIT APARTMENT FULLY SPRINKLERED NFPA-13 (TYPE III A CONSTRUCTION ) WITH 2 MEZZANINES AND 1ST FLOOR (TYPE I A) AND BASEMENT GARAGE (TYPE IA ) ( TOC, TIER 3 INCLUDING 3 EXTREME LOW INCOME UNITS PER LAMC 12.22A31, + 22 FT HEIGHT INCREASE TO 67 FT AND 20% OPEN SPACE REDUCTION [PER PAR-2021-380-TOC], ALL WORK PER ENGINEERING
Permit Issued
Issued on 9/19/2022
Issuing Office
Valley
Current Status
Issued on 9/19/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/6/2021 APPLICANT
Assigned to Plan Check Engineer 5/20/2021 RARES BODEA
Corrections Issued 5/22/2021 RARES BODEA
Disabled Access Plans Picked Up 6/2/2021 APPLICANT
Green Plans Picked Up 6/2/2021 APPLICANT
Quality Review Completed 6/4/2021 STEVEN KIM
Building Plans Picked Up 9/15/2021 APPLICANT
Applicant returned to address corrections 5/5/2022 RARES BODEA
Applicant returned to address corrections 6/21/2022 RARES BODEA
Applicant returned to address corrections 6/22/2022 RARES BODEA
Plan Check Approved 7/21/2022 RARES BODEA
Issued 9/19/2022 APPLICANT
TCO Issued (Expire Date: 11-11-2026) 5/15/2026 JEFFREY DURAN

Permit Application Clearance Information

Construction near power lines Cleared 8/6/2021 RIDWAN HARDY
Highway dedication Cleared 9/20/2021 GABRIEL ROBLES
Address approval Cleared 9/21/2021 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 9/22/2021 LEE GUILBEAUX
Permit Cleared 9/22/2021 LEE GUILBEAUX
Sewer availability Cleared 9/22/2021 LEE GUILBEAUX
Hydrant and Access approval Cleared 12/14/2021 JOHN CONNEALLY
Trees in Parkway Cleared 2/3/2022 ADALBERTO VERA
DCP conditions approval Cleared 3/15/2022 DORIS KWOK
Density Bonus 12.22.A.31 Cleared 3/15/2022 DORIS KWOK
Frnt yard landscape/Water mgmt Cleared 4/1/2022 PABLO ESTRADA
Miscellaneous Cleared 4/1/2022 PABLO ESTRADA
Miscellaneous Cleared 4/1/2022 PABLO ESTRADA
Miscellaneous Cleared 4/1/2022 PABLO ESTRADA
Miscellaneous Cleared 4/1/2022 PABLO ESTRADA
Opn space landscape/Water mgmt Cleared 4/1/2022 PABLO ESTRADA
Green Code Cleared 4/6/2022 MICHAEL AYERS
DAS Clearance Cleared 4/13/2022 NORLITO MEDRANO
Low Impact Development Cleared 5/20/2022 JORGE MEJIA LEMUS
Fire Marshall Fire Life Safety Cleared 6/7/2022 MENOA AGHAJANI
Roof/Waste drainage to street Cleared 6/17/2022 JOHN LIN
Work Adjacent to Public Way Cleared 6/17/2022 LEE GUILBEAUX
Building over 3-story or 36-ft Cleared 6/28/2022 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/28/2022 CALOSHA APPROVED

Contact Information

Architect Aslanian,, Samuel; Lic. No.: C24043 19951 TURNBERRY DRIVE      TARZANA, CA 91356
Contractor Owner-Builder       ,
Engineer Grabarek,, Jaroslaw; Lic. No.: L9258 668 TWIN PEAKS AVE      SIMI VALLEY, CA 93065
Engineer Nelson,, William Mc Kee; Lic. No.: S3417 5 DELLWOOD      DOVE CANYON, CA 92679
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065
Engineer Wavering,, Derek Evan; Lic. No.: S6239 1371 COLE LANE      UPLAND, CA 91784

Inspector Information

DEANDRE HOFFMAN, (818) 374-1182 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/6/2022 No Access for Inspection JOHN KITCKO
Pre-Inspection 10/12/2022 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/17/2022 Partial Inspection JOHN KITCKO
Piling/Pier/Caisson 12/1/2022 Partial Inspection JOHN KITCKO
Footing/Foundation/Slab 1/13/2023 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 1/26/2023 No Access for Inspection JOHN KITCKO
Footing/Foundation/Slab 2/17/2023 Partial Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 2/22/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/9/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 3/16/2023 Partial Approval JOHN KITCKO
Pre-Inspection 3/16/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 3/16/2023 Partial Approval STEVEN LEVITT
Excavation/Setback/Form/Re-Bar 4/14/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/18/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 4/25/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 5/9/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/12/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/22/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/23/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 6/27/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/24/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/25/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/27/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/28/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/11/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/12/2023 Not Ready for Inspection JOHN KITCKO
Footing/Foundation/Slab 9/19/2023 Corrections Issued JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/20/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 9/21/2023 Not Ready for Inspection JOHN KITCKO
Deputy Reinf. Concrete 9/22/2023 Conditional Approval JOHN KITCKO
Footing/Foundation/Slab 9/22/2023 Partial Approval JOHN KITCKO
Green Building Rough 9/22/2023 Not Ready for Inspection JOHN KITCKO
Reinforced Concrete Frame 9/22/2023 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 9/22/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 10/5/2023 Partial Approval JOHN KITCKO
Green Building Rough 10/18/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 10/18/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 10/18/2023 Corrections Issued JOHN KITCKO
Green Building Rough 10/20/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 10/20/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 10/20/2023 Conditional Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/7/2023 Partial Approval JOHN KITCKO
Deputy Wood Construction 11/13/2023 Approved JOHN KITCKO
Green Building Rough 11/13/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 11/13/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 11/13/2023 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/20/2023 Partial Approval JOHN KITCKO
Green Building Rough 12/4/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/4/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/4/2023 Not Ready for Inspection JOHN KITCKO
Green Building Rough 12/6/2023 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/6/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/6/2023 Partial Approval JOHN KITCKO
Green Building Rough 12/11/2023 Partial Inspection JOHN KITCKO
Verify Sprinkler Sign Off 12/11/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/11/2023 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/14/2023 Partial Approval JOHN KITCKO
Green Building Rough 12/19/2023 Partial Approval JOHN KITCKO
Verify Sprinkler Sign Off 12/19/2023 Not Ready for Inspection JOHN KITCKO
Wood Frame 12/19/2023 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/22/2024 No Access for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 1/24/2024 Not Ready for Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 1/25/2024 Conditional Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/9/2024 Partial Approval JOHN KITCKO
Green Building Rough 2/14/2024 No Access for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/14/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/14/2024 No Access for Inspection JOHN KITCKO
Green Building Rough 2/23/2024 No Access for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/23/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/23/2024 No Access for Inspection JOHN KITCKO
Green Building Rough 2/27/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 2/27/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/27/2024 Partial Approval JOHN KITCKO
Green Building Rough 3/6/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/6/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/6/2024 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 3/7/2024 Corrections Issued JOHN KITCKO
Green Building Rough 3/11/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/11/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/11/2024 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 3/13/2024 Partial Inspection JOHN KITCKO
Green Building Rough 3/15/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/15/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/15/2024 Not Ready for Inspection JOHN KITCKO
Green Building Rough 3/26/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/26/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/26/2024 Not Ready for Inspection JOHN KITCKO
Green Building Rough 3/28/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 3/28/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/28/2024 Partial Approval JOHN KITCKO
Green Building Rough 4/8/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/8/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/8/2024 Partial Inspection JOHN KITCKO
Green Building Rough 4/11/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/11/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/11/2024 Not Ready for Inspection JOHN KITCKO
Green Building Rough 4/19/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/19/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/19/2024 Partial Approval JOHN KITCKO
Green Building Rough 4/25/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/25/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/25/2024 Partial Approval JOHN KITCKO
Green Building Rough 4/30/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 4/30/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 4/30/2024 Partial Approval JOHN KITCKO
Green Building Rough 5/3/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 5/3/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/3/2024 Partial Approval JOHN KITCKO
Green Building Rough 5/8/2024 Not Ready for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 5/8/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/8/2024 Partial Approval JOHN KITCKO
Green Building Rough 5/28/2024 No Access for Inspection JOHN KITCKO
Verify Sprinkler Sign Off 5/28/2024 No Access for Inspection JOHN KITCKO
Wood Frame 5/28/2024 No Access for Inspection JOHN KITCKO
Green Building Rough 6/3/2024 Approved ROBERT DAVIS
Verify Sprinkler Sign Off 6/3/2024 Approved ROBERT DAVIS
Wood Frame 6/3/2024 No Access for Inspection ROBERT DAVIS
Wood Frame 6/6/2024 Not Ready for Inspection JOHN KITCKO
Wood Frame 6/12/2024 Partial Approval JOHN KITCKO
Wood Frame 7/11/2024 Partial Inspection JOHN KITCKO
Deputy Wood Construction 7/17/2024 Conditional Approval JOHN KITCKO
Wood Frame 7/17/2024 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 7/22/2024 Partial Approval JOHN KITCKO
Deputy Wood Construction 7/23/2024 Approved JOHN KITCKO
Wood Frame 7/24/2024 Partial Approval JOHN KITCKO
Wood Frame 7/31/2024 Partial Inspection ANDREW DORSO
Wood Frame 8/6/2024 Partial Approval DANNY RODRIGUEZ
Wood Frame 8/20/2024 Partial Inspection JOHN KITCKO
Wood Frame 9/16/2024 Partial Approval JOHN KITCKO
Wood Frame 9/19/2024 Conditional Approval JOHN KITCKO
Special/Order Compliance 10/1/2024 Partial Inspection JOHN KITCKO
Wood Frame 12/6/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 12/20/2024 Partial Inspection JOHN KITCKO
Reinforced Masonry Frame 12/20/2024 Not Ready for Inspection JOHN KITCKO
Masonry Wall/Backfill 12/24/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 12/27/2024 Conditional Approval JOHN KITCKO
Wood Frame 2/6/2025 Corrections Issued JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/12/2025 No Access for Inspection JOHN KITCKO
Interior/Exterior Lathing 2/12/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 2/12/2025 Not Ready for Inspection JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/19/2025 Partial Approval JOHN KITCKO
Wood Frame 2/19/2025 Partial Approval JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 2/20/2025 Not Ready for Inspection JOHN KITCKO
Order to Comply 2/20/2025 Not Required JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 3/10/2025 Not Ready for Inspection JOHN KITCKO
Interior/Exterior Lathing 3/10/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 3/10/2025 Partial Approval JOHN KITCKO
Interior/Exterior Lathing 4/14/2025 Partial Approval ROBERT DAVIS
Wood Frame 4/17/2025 Corrections Issued JOHN KITCKO
Floor/Roof Diaphrgm/Shear Wall 5/9/2025 Not Ready for Inspection JOHN KITCKO
Insulation 5/9/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 5/9/2025 Partial Approval JOHN KITCKO
Insulation 5/16/2025 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 5/21/2025 Partial Approval JOHN KITCKO
Drywall Nailing 5/23/2025 Partial Approval JOHN KITCKO
Insulation 5/23/2025 Partial Approval JOHN KITCKO
Drywall Nailing 5/28/2025 Partial Approval JOHN KITCKO
Drywall Nailing 6/4/2025 Partial Approval JOHN KITCKO
Wood Frame 6/11/2025 Partial Approval JOHN KITCKO
Wood Frame 6/24/2025 Partial Approval JOHN KITCKO
Insulation 8/8/2025 Partial Approval JOHN KITCKO
Insulation 8/11/2025 Partial Approval JOHN KITCKO
Drywall Nailing 8/15/2025 Not Ready for Inspection JOHN KITCKO
Drywall Nailing 8/19/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 9/25/2025 Partial Approval JOHN KITCKO
Wood Frame 9/25/2025 Partial Approval JOHN KITCKO
Insulation 9/29/2025 Partial Inspection ANDREW DORSO
Drywall Nailing 10/8/2025 Partial Approval JOHN KITCKO
Drywall Nailing 10/16/2025 Partial Approval JOHN KITCKO
Drywall Nailing 10/21/2025 Partial Approval JOHN KITCKO
Light Gage Steel Frame 11/17/2025 Not Ready for Inspection JOHN KITCKO
Wood Frame 11/25/2025 Partial Inspection JOHN KITCKO
Light Gage Steel Frame 12/2/2025 Partial Approval GREGORY POMISH
Insulation 12/5/2025 Partial Approval JOHN KITCKO
Drywall Nailing 12/16/2025 Partial Approval JOHN KITCKO
Special/Order Compliance 12/16/2025 Partial Approval SCOTT SOBEL
Drywall Nailing 1/2/2026 Partial Approval GREGORY POMISH
Drywall Nailing 1/13/2026 Partial Approval JOHN KITCKO
Structural Steel Frame 1/15/2026 No Access for Inspection JOHN KITCKO
Special/Order Compliance 1/16/2026 Partial Inspection JOHN KITCKO
Special/Order Compliance 2/6/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 3/27/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 3/31/2026 Partial Approval DEANDRE HOFFMAN
Special/Order Compliance 4/22/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 4/24/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 4/29/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 5/1/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 5/12/2026 Partial Inspection DEANDRE HOFFMAN
Special/Order Compliance 5/15/2026 Partial Inspection DEANDRE HOFFMAN