14354 W POLK ST 91342

Certificate Information: 14354 W POLK ST 91342

Application / Permit
21010-20000-01672
Plan Check / Job No.
B21VN04046
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW DETACHED (49'-0" x 30'-4"), 1200 SQFT 1 STORY ADU W/ATT 2 CAR GARAGE (19'-11" x 20'-6"), 390 SQFT PER LAMC 12.22 A.33 (c)-(d) “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the issuance of the Certificate of Occupancy.”
Permit Issued
Issued on 2/9/2022
Issuing Office
Current Status
CofO Issued on 8/23/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/12/2021 APPLICANT
Assigned to Plan Check Engineer 5/13/2021 PETER MOSESIAN
Corrections Issued 5/17/2021 PETER MOSESIAN
Quality Review Completed 5/26/2021 OMID HEDAYAT
Building Plans Picked Up 6/2/2021 APPLICANT
Plan Check Approved 2/7/2022 PETER MOSESIAN
Issued 2/9/2022 APPLICANT
CofO in Progress 8/2/2023 ROBERT GOLD
Permit Finaled 8/23/2023 RUBEN SALAS
CofO Issued 8/23/2023 RUBEN SALAS
Permit Finaled 8/23/2023 RUBEN SALAS

Permit Application Clearance Information

Address approval Cleared 6/22/2021 GABRIEL ROBLES
Permit Cleared 6/22/2021 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 6/28/2021 GABRIEL ROBLES
Sewer availability Cleared 6/28/2021 GABRIEL ROBLES
Hydrant and Access approval Cleared 8/31/2021 JOHN CONNEALLY
Trees in Parkway Cleared 12/9/2021 ADALBERTO VERA
Roof/Waste drainage to street Cleared 2/8/2022 JOSE DUARTE-DIAZ

Contact Information

Contractor Owner-Builder       ,
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

KEVIN BERBERYAN, (818) 374-9931 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/13/2022 Corrections Issued JOHN HAYES
Footing/Foundation/Slab 6/16/2022 Corrections Issued ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 6/23/2022 Approved JENNIFER RABUCHIN
PLUMBING-Rough 7/7/2022 Partial Approval ARAM AVEDISIAN
Wood Frame 7/7/2022 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Rough 8/30/2022 Corrections Issued ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 8/30/2022 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Rough 9/12/2022 Approved ARAM AVEDISIAN
PLUMBING-Rough 9/12/2022 Corrections Issued ARAM AVEDISIAN
Sewer 9/12/2022 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 10/4/2022 Approved CALEB MEISTER
HVAC-Rough 10/4/2022 Corrections Issued CALEB MEISTER
PLUMBING-Rough 10/4/2022 Corrections Issued CALEB MEISTER
Sewer 10/4/2022 Approved CALEB MEISTER
Floor/Roof Diaphrgm/Shear Wall 10/7/2022 Approved ARAM AVEDISIAN
PLUMBING-Rough 10/7/2022 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 10/13/2022 Corrections Issued THOMAS FINNILA
Green Building Rough 10/13/2022 Not Ready for Inspection THOMAS FINNILA
Interior/Exterior Lathing 10/13/2022 Corrections Issued THOMAS FINNILA
Verify Sprinkler Sign Off 10/13/2022 Not Ready for Inspection THOMAS FINNILA
Interior/Exterior Lathing 10/17/2022 Partial Approval ARAM AVEDISIAN
BUILDING-Rough-Frame 11/18/2022 Approved ARAM AVEDISIAN
Green Building Rough 11/18/2022 Approved ARAM AVEDISIAN
Insulation 12/1/2022 Approved MICHEL ABAJAN
Drywall Nailing 12/9/2022 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 12/9/2022 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Final 6/12/2023 Corrections Issued JENNIFER RABUCHIN
Final 6/12/2023 Corrections Issued JENNIFER RABUCHIN
Footing/Foundation/Slab 6/12/2023 Approved JENNIFER RABUCHIN
Green Building Final 6/12/2023 Corrections Issued JENNIFER RABUCHIN
HVAC-Final 6/12/2023 Corrections Issued JENNIFER RABUCHIN
PLUMBING-Final 6/12/2023 Corrections Issued JENNIFER RABUCHIN
SGSOV-Seismic Gas S/O Valve 6/12/2023 SGSOV Not Ready JENNIFER RABUCHIN
Service/Power Release 6/12/2023 Corrections Issued JENNIFER RABUCHIN
Smoke Detectors 6/12/2023 Approved JENNIFER RABUCHIN
ELECTRICAL-Final 6/15/2023 Approved THOMAS FINNILA
Final 6/15/2023 Corrections Issued THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 6/15/2023 SGSOV Not Ready THOMAS FINNILA
Final 7/12/2023 OK to Issue CofO THOMAS FINNILA
Green Building Final 7/12/2023 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 7/12/2023 SGSOV Approved THOMAS FINNILA
Service/Power Release 7/12/2023 Not Required THOMAS FINNILA