1342 W 54TH ST 90037

Certificate Information: 1342 W 54TH ST 90037

Application / Permit
21010-20000-00879
Plan Check / Job No.
B21VN02138
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 16'-11" X 32' DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/14/2021
Issuing Office
Current Status
CofO Issued on 12/7/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/23/2021 APPLICANT
Assigned to Plan Check Engineer 3/10/2021 RAPHAEL ROSAS
Corrections Issued 3/11/2021 RAPHAEL ROSAS
Applicant returned to address corrections 6/18/2021 RAPHAEL ROSAS
Plan Check Approved 6/29/2021 RAPHAEL ROSAS
Building Plans Picked Up 6/30/2021 APPLICANT
Issued 7/14/2021 APPLICANT
CofO in Progress 4/29/2022 SABAS ALONSO
CofO Issued 12/7/2022 DEROLD HAUFF
Permit Finaled 12/7/2022 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 3/22/2021 JUAN ASHTON
Eng Process Fee Ord 176,300 Cleared 3/23/2021 JUAN ASHTON
Sewer availability Cleared 4/30/2021 JUAN ASHTON
Hydrant and Access approval Cleared 5/13/2021 MATTHEW CRAIG
Construction near power lines Cleared 6/15/2021 RIDWAN HARDY
Low Impact Development Cleared 6/16/2021 JORGE MEJIA LEMUS
Roof/Waste drainage to street Cleared 6/30/2021 THAN WIN

Contact Information

Contractor M D M Custom Remodeling Inc; Lic. No.: 930166-B 5316 BABCOCK AVE      VALLEY VILLAGE, CA 91607
Engineer Medina,, Ferdinand Casaclang; Lic. No.: C88007 1051 S HOLT AVE APT F      LOS ANGELES, CA 90035

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 8/12/2021 Corrections Issued SABAS ALONSO
Excavation/Setback/Form/Re-Bar 8/30/2021 Approved SABAS ALONSO
Footing/Foundation/Slab 8/30/2021 Approved SABAS ALONSO
Underground Mechanical 8/30/2021 Partial Approval SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 9/13/2021 Partial Approval SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 9/24/2021 Approved SABAS ALONSO
BUILDING-Rough-Frame 9/28/2021 Approved SABAS ALONSO
Green Building Rough 9/28/2021 Approved SABAS ALONSO
Rough-Elec/Plmb/HVAC 9/28/2021 Approved SABAS ALONSO
Verify Sprinkler Sign Off 9/28/2021 Approved SABAS ALONSO
Insulation 9/30/2021 Approved HORACE FULTZ
Interior/Exterior Lathing 9/30/2021 Partial Approval HORACE FULTZ
Drywall Nailing 10/6/2021 Approved SABAS ALONSO
Interior/Exterior Lathing 10/6/2021 Approved SABAS ALONSO
ELECTRICAL-Rough 11/29/2021 Corrections Issued SABAS ALONSO
Underground Mechanical 11/29/2021 Corrections Issued SABAS ALONSO
Underground Mechanical 12/3/2021 Approved JUSTIN HAWLEY
Final 2/18/2022 Corrections Issued SABAS ALONSO
Green Building Final 2/18/2022 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 2/18/2022 SGSOV Not Ready SABAS ALONSO
Service/Power Release 2/18/2022 Not Required SABAS ALONSO
Smoke Detectors 2/18/2022 Approved SABAS ALONSO
Final 3/15/2022 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 3/15/2022 SGSOV Not Ready SABAS ALONSO
Final 3/22/2022 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 3/22/2022 SGSOV Approved SABAS ALONSO
Final 4/28/2022 OK to Issue CofO SABAS ALONSO