8641 N CRANFORD AVE 91352

Certificate Information: 8641 N CRANFORD AVE 91352

Application / Permit
21010-20000-00758
Plan Check / Job No.
B21VN01836
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 44' X 48' IRREGULAR SHAPE 1-STORY DETACHED ACCESSORY DWELLING UNIT WITH 6' X 16' ATTACHED PATIO COVERAT REAR PER LAMC 12.22 A.33(c) and (d). ALL WORK PER ENGINEERING. “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.”
Permit Issued
Issued on 10/28/2021
Issuing Office
Current Status
CofO Issued on 10/14/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/19/2021 APPLICANT
Assigned to Plan Check Engineer 3/11/2021 PARISA ZAHABI
Corrections Issued 3/13/2021 PARISA ZAHABI
Quality Review Completed 3/24/2021 OMID HEDAYAT
Applicant returned to address corrections 10/4/2021 PARISA ZAHABI
Applicant returned to address corrections 10/21/2021 PARISA ZAHABI
Plan Check Approved 10/28/2021 PARISA ZAHABI
Issued 10/28/2021 APPLICANT
Building Plans Picked Up 10/29/2021 APPLICANT
CofO in Progress 9/26/2022 CHRISTOPHER DELLEFIELD
CofO Issued 10/14/2022 MICHAEL SMITH
Permit Finaled 10/14/2022 MICHAEL SMITH

Permit Application Clearance Information

Hydrant and Access approval Cleared 8/18/2021 MATTHEW CRAIG
Address approval Cleared 9/14/2021 CARLOS AGUILERA
Sewer availability Cleared 9/14/2021 CARLOS AGUILERA
Roof/Waste drainage to street Cleared 10/25/2021 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 10/28/2021 CARLOS AGUILERA

Contact Information

Contractor Owner-Builder       ,
Engineer Manoukian,, Krikor Kerop; Lic. No.: C87010 2310 W MAGNOLIA BLVD STE A      BURBANK, CA 91506

Inspector Information

WILLIAM WREN, (818) 374-1170 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/24/2021 Not Ready for Inspection RICHARD DOCKUS
METHANE-Barrier 11/24/2021 Partial Inspection RICHARD DOCKUS
METHANE-Subgrade 11/24/2021 Partial Inspection RICHARD DOCKUS
Underground Mechanical 11/24/2021 Not Ready for Inspection RICHARD DOCKUS
PLUMBING-Rough 12/14/2021 Not Ready for Inspection CHRISTOPHER DELLEFIELD
Underground Mechanical 12/14/2021 Not Ready for Inspection CHRISTOPHER DELLEFIELD
BUILDING-Rough-Frame 12/15/2021 Partial Approval CHRISTOPHER DELLEFIELD
Gas Test 12/15/2021 Approved CHRISTOPHER DELLEFIELD
PLUMBING-Rough 12/15/2021 Partial Approval CHRISTOPHER DELLEFIELD
Floor/Roof Diaphrgm/Shear Wall 12/17/2021 Approved WILLIAM WREN
Floor/Roof Diaphrgm/Shear Wall 12/21/2021 Partial Approval WILLIAM KUEHN
PLUMBING-Rough 12/21/2021 Not Ready for Inspection WILLIAM KUEHN
BUILDING-Rough-Frame 1/6/2022 Corrections Issued CHRISTOPHER DELLEFIELD
Green Building Rough 1/6/2022 Not Ready for Inspection CHRISTOPHER DELLEFIELD
METHANE-Rough 1/6/2022 Approved CHRISTOPHER DELLEFIELD
Rough-Elec/Plmb/HVAC 1/6/2022 Approved CHRISTOPHER DELLEFIELD
Smoke Detectors 1/6/2022 Not Ready for Inspection CHRISTOPHER DELLEFIELD
Verify Sprinkler Sign Off 1/6/2022 Approved CHRISTOPHER DELLEFIELD
Deputy Wood Construction 1/7/2022 Conditional Approval MICHAEL TEMPLE
BUILDING-Rough-Frame 1/11/2022 Conditional Approval CHRISTOPHER DELLEFIELD
Green Building Rough 1/11/2022 Approved CHRISTOPHER DELLEFIELD
Shower Pan 1/11/2022 Approved CHRISTOPHER DELLEFIELD
Gas Test 1/24/2022 Approved CHRISTOPHER DELLEFIELD
PLUMBING-Rough 1/24/2022 Partial Approval CHRISTOPHER DELLEFIELD
Sewer 1/24/2022 Corrections Issued CHRISTOPHER DELLEFIELD
Drywall Nailing 1/26/2022 Approved CHRISTOPHER DELLEFIELD
Insulation 1/26/2022 Corrections Issued CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 1/26/2022 Approved CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 1/28/2022 Approved JOHN HAYES
ELECTRICAL-Rough 2/8/2022 Approved CHRISTOPHER DELLEFIELD
SGSOV-Seismic Gas S/O Valve 3/11/2022 SGSOV Not Ready CHRISTOPHER DELLEFIELD
BUILDING-Rough-Frame 3/18/2022 Approved CHRISTOPHER DELLEFIELD
ELECTRICAL-Final 3/18/2022 Corrections Issued CHRISTOPHER DELLEFIELD
Final 3/18/2022 Corrections Issued CHRISTOPHER DELLEFIELD
Footing/Foundation/Slab 3/18/2022 Approved CHRISTOPHER DELLEFIELD
Green Building Final 3/18/2022 Approved CHRISTOPHER DELLEFIELD
HVAC-Final 3/18/2022 Corrections Issued CHRISTOPHER DELLEFIELD
METHANE-Barrier 3/18/2022 Approved CHRISTOPHER DELLEFIELD
METHANE-Subgrade 3/18/2022 Approved CHRISTOPHER DELLEFIELD
PLUMBING-Final 3/18/2022 Corrections Issued CHRISTOPHER DELLEFIELD
SGSOV-Seismic Gas S/O Valve 3/18/2022 SGSOV Not Ready CHRISTOPHER DELLEFIELD
Service/Power Release 3/18/2022 Not Ready for Inspection CHRISTOPHER DELLEFIELD
Smoke Detectors 3/18/2022 Approved CHRISTOPHER DELLEFIELD
ELECTRICAL-Final 9/23/2022 Approved CHRISTOPHER DELLEFIELD
Final 9/23/2022 Corrections Issued CHRISTOPHER DELLEFIELD
HVAC-Final 9/23/2022 Approved CHRISTOPHER DELLEFIELD
PLUMBING-Final 9/23/2022 Approved CHRISTOPHER DELLEFIELD
SGSOV-Seismic Gas S/O Valve 9/23/2022 SGSOV Approved CHRISTOPHER DELLEFIELD
Service/Power Release 9/23/2022 Not Ready for Inspection CHRISTOPHER DELLEFIELD
Final 9/26/2022 OK to Issue CofO CHRISTOPHER DELLEFIELD
Service/Power Release 9/26/2022 Approved CHRISTOPHER DELLEFIELD