Excavation/Setback/Form/Re-Bar
|
12/22/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
12/23/2025
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
1/2/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
SWPPP-Const. Storm Water
|
1/7/2026
|
Completed
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
1/8/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/9/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/12/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/13/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/15/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/16/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
1/20/2026
|
Partial Inspection
|
DANIEL VARNUM
|
|
Deputy Methane Barrier
|
1/26/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/27/2026
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/28/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/29/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
1/30/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
2/3/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
2/4/2026
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
2/5/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
2/6/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
2/6/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Grading Pre-Inspection
|
2/10/2026
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
2/13/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
2/20/2026
|
Approved
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
2/20/2026
|
Partial Approval
|
DANIEL ARMENTA
|
|
Excavation/Setback/Form/Re-Bar
|
3/2/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Grading Pre-Inspection
|
3/2/2026
|
Approved
|
DERRICK SPENCER
|
|
Grading Pre-Inspection
|
3/3/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/10/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/10/2026
|
Conditional Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
3/10/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/12/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/13/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/17/2026
|
Conditional Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
3/17/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
3/18/2026
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/19/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
3/19/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/20/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
3/20/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
3/25/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/31/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/1/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/2/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2026
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/3/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/6/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/7/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/7/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/8/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/9/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/9/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/10/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/13/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
4/13/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
4/13/2026
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/14/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/14/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/15/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/15/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/15/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/16/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
4/16/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/17/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/17/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
4/22/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/24/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Other (see comments)
|
4/27/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/27/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/27/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/28/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/29/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/29/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/30/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
4/30/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
4/30/2026
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/1/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/1/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/1/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
5/4/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/4/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Methane Barrier
|
5/13/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Methane Barrier
|
5/14/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Methane Barrier
|
5/15/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/18/2026
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/19/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/19/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Other (see comments)
|
5/20/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/20/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/21/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/22/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/26/2026
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
5/26/2026
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/27/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/28/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/29/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
5/29/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/1/2026
|
Partial Inspection
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/2/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/3/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/4/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/4/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/5/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/8/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/8/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/9/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/10/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/10/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/11/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/11/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/12/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
6/12/2026
|
No Access for Inspection
|
VASIL MIHALEV
|
|
Deputy Pre-Stress Concrete
|
6/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
6/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
6/18/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/18/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
6/18/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
6/18/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
6/22/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/22/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
6/22/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Methane Barrier
|
6/23/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
6/23/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/23/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
6/23/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
6/24/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/24/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
6/24/2026
|
Approved
|
FARHAD DADBIN
|
|
Reinforced Concrete Frame
|
6/26/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/29/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
6/30/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/2/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/6/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/6/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/6/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/6/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/7/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/7/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/7/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
7/7/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/8/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/8/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/8/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/9/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/9/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/9/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/10/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/10/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/10/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/13/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/13/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/13/2026
|
Approved
|
FARHAD DADBIN
|
|
Reinforced Concrete Frame
|
7/13/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/14/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/14/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/14/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
7/14/2026
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Other (see comments)
|
7/15/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/15/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/15/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/15/2026
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/16/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/16/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/16/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Other (see comments)
|
7/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Pre-Stress Concrete
|
7/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
7/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
7/17/2026
|
Approved
|
FARHAD DADBIN
|
|
Deputy Methane Barrier
|
7/20/2026
|
Approved
|
FARHAD DADBIN
|
|
Excavation/Setback/Form/Re-Bar
|
7/20/2026
|
Partial Approval
|
FARHAD DADBIN
|