11100 W PEORIA ST 91352
Certificate Information: 11100 W PEORIA ST 91352
- Application / Permit
- 21010-10002-01829
- Plan Check / Job No.
- B21LA19407
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (52) Foundation Only
- Work Description
- SUPPLEMENTAL TO PERMIT # 21010-10000-01829 : FOUNDATION ONLY PERMIT FOR NEW 3 STORY MOTIION PICTURE/ SOUND STUDIO & OFFICE BUILDING. ( BUILDING #1) (MICROPILES PERMIT APPLICATION# 21010-10003-01829)
- Permit Issued
- Issued on 2/23/2022
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 12/18/2023
Permit Application Status History
| Plan Check Approved | 2/4/2022 | GARO TELMI |
| Issued | 2/23/2022 | APPLICANT |
| Permit Finaled | 12/15/2023 | DANNY RODRIGUEZ |
Permit Application Clearance Information
| Address approval | Cleared | 10/18/2021 | LEE GUILBEAUX |
| Drainage to Storm Drain | Cleared | 10/18/2021 | LEE GUILBEAUX |
| Eng Process Fee Ord 176,300 | Cleared | 10/18/2021 | LEE GUILBEAUX |
| Green Code | Cleared | 10/18/2021 | GARO TELMI |
| Highway dedication | Cleared | 10/18/2021 | LEE GUILBEAUX |
| Permit | Cleared | 10/18/2021 | LEE GUILBEAUX |
| Roof/Waste drainage to street | Cleared | 10/18/2021 | LEE GUILBEAUX |
| Sewer availability | Cleared | 10/18/2021 | LEE GUILBEAUX |
| DAS Clearance | Cleared | 10/19/2021 | GARO TELMI |
| Internal circulation | Cleared | 10/19/2021 | DURRE SHAMSI |
| Transportation Demand Ord. | Cleared | 10/19/2021 | DURRE SHAMSI |
| Low Impact Development | Cleared | 10/21/2021 | ORVAL HERNANDEZ-MARCI |
| Stormwater Pollution Mitigatn | Cleared | 10/21/2021 | ORVAL HERNANDEZ-MARCI |
| Hydrant and Access approval | Cleared | 10/22/2021 | MATTHEW CRAIG |
| Fire Marshal Fire Life Safety | Cleared | 10/27/2021 | VIDAL GARCIA |
| Trees in Parkway | Cleared | 10/27/2021 | JOEL HERNANDEZ |
| Construction within easement | Cleared | 12/7/2021 | WALTER RAMIREZ |
| CPC | Cleared | 12/9/2021 | ANNA VIDAL |
| Clean Up Green Up | Cleared | 12/9/2021 | ANNA VIDAL |
| Frnt yard landscape/Water mgmt | Cleared | 12/9/2021 | ANNA VIDAL |
| Miscellaneous | Cleared | 12/9/2021 | ANNA VIDAL |
| Prkng lot landscape/Water mgmt | Cleared | 12/9/2021 | ANNA VIDAL |
| Site Plan review | Cleared | 12/9/2021 | ANNA VIDAL |
| ZI | Cleared | 12/9/2021 | ANNA VIDAL |
| Excavation more than 5-ft deep | Cleared | 2/4/2022 | CALOSHA APPROVED |
| Grading Pre-Inspection | Cleared | 2/4/2022 | BRIAN MILLER |
Contact Information
| Architect | Bastien,, Gary L; Lic. No.: C11164 | 15661 RED HILL AVENUE SUITE 150 TUSTIN, CA 92780 |
| Contractor | Snyder Langston Llc; Lic. No.: 1019188-B | 17962 COWAN IRVINE, CA 92614 |
| Engineer | Benson,, Thomas Clifford; Lic. No.: GE2091 | 645 W LA CROSSE ST GLENDORA, CA 91741 |
| Engineer | Cocke,, David Winbern; Lic. No.: S3005 | 19210 S VERMONT AVENUE BLDNG B SUITE 210 GARDENA, CA 90248 |
| Engineer | Rieke,, Axel Dieter; Lic. No.: C71407 | 2900 22ND ST 13 SAN FRANCISCO, CA 94110 |
| Engineer | Vandervis,, Jacob; Lic. No.: C46301 | 701 NORTH PARKCENTER DR SANTA ANA, CA 92705 |
Inspector Information
| JOHN KITCKO, (818) 374-1109 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 2/25/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Excavation/Setback/Form/Re-Bar | 2/28/2022 | Not Ready for Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 2/28/2022 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 2/28/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Piling/Pier/Caisson | 3/1/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Piling/Pier/Caisson | 3/2/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Pre-Inspection | 3/25/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 4/12/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 4/13/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 4/14/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 4/15/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 4/19/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Piling/Pier/Caisson | 4/19/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 4/27/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 4/28/2022 | Partial Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 4/29/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/2/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/2/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/3/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/4/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/5/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/6/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/6/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/9/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/9/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/10/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/10/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/10/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/11/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/11/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/11/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/12/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/12/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/13/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/13/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/13/2022 | Partial Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/16/2022 | Partial Approval | DANIEL VARNUM |
| Deputy Methane Barrier | 5/17/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/17/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/18/2022 | Conditional Approval | KENNETH ROBERTS |
| Deputy Reinf. Concrete | 5/18/2022 | Conditional Approval | KENNETH ROBERTS |
| Deputy Methane Barrier | 5/19/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/19/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/20/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/20/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 5/20/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/23/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/23/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/24/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/25/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Methane Barrier | 5/26/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Methane Barrier | 5/27/2022 | Conditional Approval | KENNETH ROBERTS |
| Reinforced Concrete Frame | 5/27/2022 | Partial Approval | KENNETH ROBERTS |
| Footing/Foundation/Slab | 6/6/2022 | Partial Approval | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 6/6/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 6/29/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 6/30/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/1/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/6/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 7/7/2022 | Conditional Approval | GREGORY POMISH |
| Deputy Steel/Welding | 7/11/2022 | Conditional Approval | JOHN KITCKO |
| Deputy Steel/Welding | 7/12/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 7/13/2022 | Partial Approval | GREGORY POMISH |
| Deputy Steel/Welding | 7/14/2022 | Partial Approval | GREGORY POMISH |
| Deputy Steel/Welding | 7/15/2022 | Partial Approval | GREGORY POMISH |
| Deputy Steel/Welding | 7/18/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/19/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/20/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/21/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 7/22/2022 | Conditional Approval | GREGORY POMISH |
| Deputy Steel/Welding | 7/27/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/28/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/29/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/1/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/2/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/3/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/4/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/5/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 8/8/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/16/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 8/17/2022 | Conditional Approval | ROBERT DAVIS |
| Deputy Steel/Welding | 8/18/2022 | Conditional Approval | GREGORY POMISH |
| Deputy Steel/Welding | 8/19/2022 | Conditional Approval | GREGORY POMISH |
| Deputy Steel/Welding | 8/22/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/23/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/24/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/25/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 8/26/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 8/29/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Light Gage Steel Frame | 8/29/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 8/30/2022 | Partial Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 9/1/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/7/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/8/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/9/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/19/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/20/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/21/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/22/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 9/23/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/5/2022 | Partial Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/12/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/13/2022 | Partial Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/18/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 10/19/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 10/20/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 10/21/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/24/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 10/24/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 10/26/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/26/2022 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 10/27/2022 | Approved | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 10/27/2022 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 10/28/2022 | Approved | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 11/30/2022 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 12/1/2022 | Conditional Approval | JEFFREY DURAN |
| Deputy Steel/Welding | 12/2/2022 | Approved | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 12/28/2022 | Partial Inspection | ANDREW DORSO |
| Reinforced Concrete Frame | 1/25/2023 | Partial Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 3/8/2023 | Partial Approval | DANNY RODRIGUEZ |
| Deputy Reinf. Concrete | 5/8/2023 | Approved | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 5/24/2023 | Not Ready for Inspection | ANDREW DORSO |
| Reinforced Concrete Frame | 5/25/2023 | Not Ready for Inspection | ANDREW DORSO |
| Reinforced Concrete Frame | 7/6/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 7/7/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 7/11/2023 | Partial Approval | CAMERON CHABAN |
| Reinforced Concrete Frame | 7/14/2023 | Partial Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 7/17/2023 | Corrections Issued | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 7/17/2023 | Partial Inspection | DANNY RODRIGUEZ |
| Light Gage Steel Frame | 7/18/2023 | Partial Approval | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 7/20/2023 | Partial Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 7/20/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 7/21/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 7/25/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Footing/Foundation/Slab | 7/26/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 8/1/2023 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Reinforced Concrete Frame | 9/7/2023 | Partial Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 10/27/2023 | Partial Inspection | DANNY RODRIGUEZ |
| Final | 12/15/2023 | Permit Finaled | DANNY RODRIGUEZ |
| Green Building Final | 12/15/2023 | Approved | DANNY RODRIGUEZ |
| Smoke Detectors | 12/15/2023 | Approved | DANNY RODRIGUEZ |