2724 E EAGLE ST 90033

Certificate Information: 2724 E EAGLE ST 90033

Application / Permit
21010-10000-06374
Plan Check / Job No.
B21LA23055
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSED DETACHED 2-STORY ADU WITH 2-CAR CARPORT AT 1ST FLOOR. ADU PER LAMC 12.22 A.33(c)-(d)
Permit Issued
Issued on 8/9/2022
Issuing Office
Metro
Current Status
CofO Issued on 2/12/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/15/2021 APPLICANT
Assigned to Plan Check Engineer 1/13/2022 ADRIANA LOPEZ
Corrections Issued 1/19/2022 ADRIANA LOPEZ
Quality Review Completed 1/19/2022 KEN GILL
Building Plans Picked Up 1/25/2022 APPLICANT
Applicant returned to address corrections 5/13/2022 ADRIANA LOPEZ
Applicant returned to address corrections 5/27/2022 ADRIANA LOPEZ
Plan Check Approved 5/27/2022 ADRIANA LOPEZ
Issued 8/9/2022 APPLICANT
CofO in Progress 2/8/2024 FREDDIE RIVERA
Permit Finaled 2/12/2024 DEROLD HAUFF
CofO Issued 2/12/2024 DEROLD HAUFF
Permit Finaled 2/12/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 1/27/2022 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 1/27/2022 ABEL CASILLAS
Sewer availability Cleared 1/27/2022 ABEL CASILLAS
Clean Up Green Up Cleared 1/31/2022 ANACANY HURTADO
Low Impact Development Cleared 3/18/2022 ANTHONY VARGAS
Tenant Habitability Plan Cleared 3/23/2022 MICHAEL SOTO
Grading Pre-Inspection Cleared 4/1/2022 ROBERT HUGHES
GPI Written Notices Cleared 5/13/2022 KIRK LINKLATER
Roof/Waste drainage to street Cleared 5/17/2022 AMAAN MALIK

Contact Information

Contractor Owner-Builder       ,
Engineer Mejia,, Fernando Finuliar; Lic. No.: C54382 8305 DUCOR AVE      WEST HILLS, CA 91304

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

METHANE-Barrier 9/12/2022 Partial Inspection FREDDIE RIVERA
METHANE-Subgrade 9/12/2022 Partial Inspection FREDDIE RIVERA
Pre-Inspection 9/12/2022 Approved FREDDIE RIVERA
Footing/Foundation/Slab 9/26/2022 Partial Inspection FREDDIE RIVERA
METHANE-Barrier 9/26/2022 Approved FREDDIE RIVERA
METHANE-Subgrade 9/26/2022 Corrections Issued FREDDIE RIVERA
Sewer 9/26/2022 Partial Inspection FREDDIE RIVERA
Sewer 9/27/2022 Partial Approval FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 10/5/2022 Partial Approval RYAN SALAZAR
Floor/Roof Diaphrgm/Shear Wall 11/1/2022 Partial Approval JOSE AVILA
METHANE-Barrier 11/1/2022 Approved JOSE AVILA
Reinforced Concrete Frame 11/1/2022 Partial Approval JOSE AVILA
BUILDING-Rough-Frame 11/23/2022 Partial Inspection FREDDIE RIVERA
ELECTRICAL-Rough 11/23/2022 Corrections Issued FREDDIE RIVERA
Green Building Rough 11/23/2022 Partial Inspection FREDDIE RIVERA
METHANE-Rough 11/23/2022 Approved FREDDIE RIVERA
PLUMBING-Rough 11/23/2022 Partial Inspection FREDDIE RIVERA
Rough-Elec/Plmb/HVAC 11/23/2022 Partial Inspection FREDDIE RIVERA
Underground Mechanical 11/23/2022 Partial Inspection FREDDIE RIVERA
Verify Sprinkler Sign Off 11/23/2022 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 11/30/2022 Approved FREDDIE RIVERA
ELECTRICAL-Rough 11/30/2022 Approved FREDDIE RIVERA
Green Building Rough 11/30/2022 Approved FREDDIE RIVERA
PLUMBING-Rough 11/30/2022 Approved FREDDIE RIVERA
Insulation 12/13/2022 Corrections Issued ALIZAH MAYAGOITIA
Interior/Exterior Lathing 12/13/2022 Partial Approval ALIZAH MAYAGOITIA
Shower Pan 12/13/2022 Approved ALIZAH MAYAGOITIA
Insulation 12/28/2022 Corrections Issued FREDDIE RIVERA
Insulation 12/30/2022 Approved RUBEN SALAS
Drywall Nailing 1/4/2023 Partial Approval FREDDIE RIVERA
Shower Pan 2/10/2023 Approved FREDDIE RIVERA
Sewer 3/6/2023 Corrections Issued FREDDIE RIVERA
Sewer 3/24/2023 Approved FREDDIE RIVERA
Underground Mechanical 4/4/2023 Approved FREDDIE RIVERA
Drywall Nailing 6/6/2023 Approved FREDDIE RIVERA
Final 6/6/2023 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 6/6/2023 Approved FREDDIE RIVERA
Green Building Final 6/6/2023 Partial Inspection FREDDIE RIVERA
METHANE-Subgrade 6/6/2023 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 6/6/2023 SGSOV Not Ready FREDDIE RIVERA
Service/Power Release 6/6/2023 Partial Inspection FREDDIE RIVERA
Smoke Detectors 6/6/2023 Approved FREDDIE RIVERA
Final 6/21/2023 Partial Inspection FREDDIE RIVERA
Green Building Final 6/21/2023 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 6/21/2023 SGSOV Not Ready FREDDIE RIVERA
Service/Power Release 6/21/2023 Partial Inspection FREDDIE RIVERA
ELECTRICAL-Rough 7/3/2023 Approved FREDDIE RIVERA
Final 7/3/2023 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 7/3/2023 SGSOV Not Ready FREDDIE RIVERA
Service/Power Release 7/3/2023 Partial Inspection FREDDIE RIVERA
Final 12/14/2023 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 12/14/2023 SGSOV Approved FREDDIE RIVERA
Service/Power Release 12/14/2023 Approved FREDDIE RIVERA
Final 2/1/2024 Corrections Issued FREDDIE RIVERA
Final 2/8/2024 OK to Issue CofO FREDDIE RIVERA