355 S OGDEN DR 90036

Certificate Information: 355 S OGDEN DR 90036

Application / Permit
21010-10000-05966
Plan Check / Job No.
B21LA21546
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 8-Story mixed used Apartment & Retail building ( 5 story Type III-A Residential units over 3 levels of Type I above grade parking & Retail at ground level & 2 levels of subterrenean parking).
Permit Issued
Issued on 6/15/2023
Issuing Office
Metro
Current Status
Issued on 6/15/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 11/23/2021 APPLICANT
Green Plans Picked Up 12/7/2021 APPLICANT
Assigned to Plan Check Engineer 12/9/2021 GARO TELMI
Disabled Access Plans Picked Up 12/16/2021 APPLICANT
Corrections Issued 1/5/2022 GARO TELMI
Quality Review Completed 1/13/2022 KEN GILL
Building Plans Picked Up 1/18/2022 APPLICANT
Applicant returned to address corrections 2/7/2022 GARO TELMI
Applicant returned to address corrections 2/11/2022 GARO TELMI
Applicant returned to address corrections 3/10/2022 GARO TELMI
Applicant returned to address corrections 3/24/2022 GARO TELMI
Applicant returned to address corrections 4/7/2022 GARO TELMI
Applicant returned to address corrections 5/5/2022 GARO TELMI
Applicant returned to address corrections 9/21/2022 GARO TELMI
Applicant returned to address corrections 12/7/2022 GARO TELMI
Plan Check Approved 4/13/2023 GARO TELMI
Issued 6/15/2023 APPLICANT
Permit Closed-Status Void 4/4/2024 EDWIN GREGORYONA
Re-Activate Permit 4/5/2024 EDWIN GREGORYONA

Permit Application Clearance Information

Address approval Cleared 1/12/2022 JEANETTE VONG
Driveway location Cleared 4/19/2022 TAIMOUR TANAVOLI
Internal circulation Cleared 4/19/2022 TAIMOUR TANAVOLI
Bicycle Parking Cleared 6/17/2022 JEREMY CHOK
Encroachment in public way Cleared 6/21/2022 JEREMY CHOK
Highway dedication Cleared 7/19/2022 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 8/9/2022 WALLIE JONG
Construction near power lines Cleared 8/10/2022 RIDWAN HARDY
Construction within easement Cleared 8/10/2022 RIDWAN HARDY
Trees in Parkway Cleared 8/11/2022 ADALBERTO VERA
Certificate of Compliance Cleared 9/14/2022 LOUIS ORTEGA
Hydrant and Access approval Cleared 9/22/2022 KURT CORRAL
Sewer availability Cleared 10/4/2022 CELINA MORENO
Low Impact Development Cleared 12/7/2022 ORVAL HERNANDEZ-MARCI
Work Adjacent to Public Way Cleared 12/19/2022 JOSE RODRIGUEZ
Miscellaneous Cleared 12/20/2022 ROBIN ETNIEL
Methane Ordinance Cleared 2/3/2023 WILLIAM JOHNS
Stormwater Pollution Mitigatn Cleared 2/13/2023 ORVAL HERNANDEZ-MARCI
Permit Cleared 2/22/2023 LINDA MARGARET
Roof/Waste drainage to street Cleared 2/22/2023 WALLIE JONG
Drainage to Storm Drain Cleared 2/23/2023 ALBERT TAM
Fire Marshal Fire Life Safety Cleared 4/4/2023 WILLIAM JOHNS
Green Code Cleared 4/4/2023 AARON COSTA
DAS Clearance Cleared 4/6/2023 SHINE LIN
CPC Cleared 4/10/2023 BOB BABAJIAN
Miscellaneous Cleared 4/10/2023 BOB BABAJIAN
Miscellaneous Cleared 4/10/2023 BOB BABAJIAN
Miscellaneous Cleared 4/10/2023 BOB BABAJIAN
Opn space landscape/Water mgmt Cleared 4/10/2023 BOB BABAJIAN
Prkng lot landscape/Water mgmt Cleared 4/10/2023 BOB BABAJIAN
Site Plan review Cleared 4/10/2023 BOB BABAJIAN
ZA Case Cleared 4/10/2023 BOB BABAJIAN
ZA Case Cleared 4/10/2023 BOB BABAJIAN
ZA Case Cleared 4/10/2023 BOB BABAJIAN
ZA Case Cleared 4/10/2023 BOB BABAJIAN
ZA Case Cleared 4/10/2023 BOB BABAJIAN
Building over 36-ft Cleared 4/13/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/13/2023 CALOSHA APPROVED

Contact Information

Architect Pitts,, Jean L; Lic. No.: C27115 4151 MANZANITA      IRVINE, CA 92604
Contractor Holland Construction Inc; Lic. No.: 944880-B 1111 MAIN STREET STE 700      VANCOUVER, WA 98660
Engineer Adams,, Jelisa; Lic. No.: GE3092 26632 EL TOBOSO      MISSION VIEJO, CA 92691
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Johnson,, Jeremy Allen; Lic. No.: C71475 28363 BERYLWOOD PL      VALENCIA, CA 91354
Engineer Rahe,, Daniel Lucus; Lic. No.: L9425 990 N. CATALINA AVE      PASADENA, CA 91104
Engineer Smith,, Chris Wayne; Lic. No.: S6106 1852 CORINTH AVE #11      LOS ANGELES, CA 90025

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 6/20/2023 Conditional Approval GREGORY POMISH
Pre-Inspection 6/20/2023 Partial Inspection GREGORY POMISH
Deputy Methane Barrier 6/21/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 6/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 7/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/25/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/25/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 7/25/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 7/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 8/16/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/16/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 8/16/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 8/16/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 8/16/2023 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 8/16/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 8/17/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 8/18/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 8/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 8/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/24/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/28/2023 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/28/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/28/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 8/28/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 8/28/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/30/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/5/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/7/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/8/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/8/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 9/8/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 9/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 9/11/2023 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 9/12/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/12/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/12/2023 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 9/13/2023 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 9/13/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/13/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/13/2023 Conditional Approval GREGORY POMISH
Piling/Pier/Caisson 9/13/2023 Partial Approval GREGORY POMISH
Deputy Methane Barrier 9/14/2023 Conditional Approval GREGORY POMISH
Deputy Other (see comments) 9/14/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/14/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/14/2023 Conditional Approval GREGORY POMISH
Piling/Pier/Caisson 9/14/2023 Partial Approval GREGORY POMISH
Deputy Other (see comments) 9/15/2023 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/15/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/15/2023 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/15/2023 Partial Approval GREGORY POMISH
METHANE-Barrier 9/15/2023 Partial Inspection GREGORY POMISH
METHANE-Subgrade 9/15/2023 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/19/2023 Conditional Approval LARRY ARNICK
Deputy Shotcrete 9/19/2023 Conditional Approval LARRY ARNICK
Piling/Pier/Caisson 9/19/2023 Not Ready for Inspection LARRY ARNICK
Deputy Methane Barrier 9/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/21/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 9/21/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/22/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/22/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/22/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/22/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 9/22/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 9/22/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/26/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/27/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 9/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/28/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/28/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/28/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/29/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 9/29/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/29/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 9/29/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 9/29/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 9/29/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/2/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 10/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/3/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/4/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/4/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/4/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/5/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/5/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 10/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/6/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/6/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 10/6/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 10/6/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/10/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/11/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/12/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/12/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/12/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/12/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 10/12/2023 Partial Approval EDWIN GREGORYONA
METHANE-Rough 10/12/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 10/12/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 10/12/2023 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/12/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/12/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/16/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/16/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/17/2023 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/17/2023 Conditional Approval GREGORY POMISH
Piling/Pier/Caisson 10/17/2023 Partial Approval GREGORY POMISH
Deputy Methane Barrier 10/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 10/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/19/2023 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 10/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/23/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/23/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/23/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 10/23/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 10/23/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 10/23/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/24/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/25/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/27/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/27/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 10/27/2023 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 10/27/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/27/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 10/31/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/1/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/2/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/6/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/6/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/6/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 11/6/2023 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 11/6/2023 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/8/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 11/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/9/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/9/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/14/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/14/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/15/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/15/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/15/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 11/15/2023 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 11/15/2023 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/17/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/17/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/17/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/20/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/21/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/21/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/21/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/27/2023 Partial Approval GREGORY POMISH
METHANE-Barrier 11/27/2023 Not Ready for Inspection GREGORY POMISH
METHANE-Subgrade 11/27/2023 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/28/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/29/2023 Conditional Approval RAFAEL ESPINOZA
Deputy Shotcrete 11/29/2023 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 11/29/2023 Partial Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 11/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/1/2023 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/1/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 12/1/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 12/1/2023 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 12/1/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/1/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/4/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/5/2023 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/5/2023 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 12/5/2023 Approved EDWIN GREGORYONA
METHANE-Subgrade 12/5/2023 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 12/8/2023 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 12/8/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/13/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/13/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/14/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 12/14/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 12/14/2023 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 12/14/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/14/2023 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/15/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/20/2023 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/20/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/26/2023 Partial Approval EDWIN GREGORYONA
Green Building Rough 12/26/2023 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 12/26/2023 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 12/26/2023 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 12/26/2023 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 12/29/2023 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/2/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/3/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 1/3/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/3/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 1/3/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 1/3/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/3/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/4/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/5/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 1/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/8/2024 No Access for Inspection MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/9/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/9/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 1/9/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/9/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/9/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/10/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/11/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/12/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 1/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/16/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/16/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/18/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/18/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/18/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 1/18/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/18/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/18/2024 OK to Expire Permit EDWIN GREGORYONA
Deputy Reinf. Concrete 1/19/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/19/2024 Conditional Approval MICHAEL ROSENBERG
Piling/Pier/Caisson 1/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/23/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/23/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/24/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/24/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 1/24/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/25/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/25/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/25/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 1/25/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 1/25/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 1/25/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/26/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 1/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/29/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/30/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/30/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/31/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/31/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 1/31/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/6/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 2/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 2/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/8/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/8/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/9/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/12/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/13/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/13/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 2/13/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/13/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/13/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/14/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 2/15/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/16/2024 Order to Comply Issued EDWIN GREGORYONA
Deputy Reinf. Concrete 2/16/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/20/2024 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 2/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/21/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/21/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 2/21/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/21/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/21/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/22/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/26/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/27/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 2/27/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 2/27/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 2/27/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 2/27/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 2/29/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 2/29/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/1/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/5/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/5/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 3/5/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/5/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/5/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/7/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 3/7/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 3/7/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/8/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 3/8/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/11/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/12/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/13/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 3/13/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 3/13/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 3/14/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/15/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/18/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/19/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/19/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 3/19/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/19/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/19/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/20/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/21/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 3/22/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 3/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/27/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 3/27/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 3/27/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 3/27/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 3/27/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 3/29/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/29/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/4/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/4/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/4/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/4/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/4/2024 Not Ready for Inspection EDWIN GREGORYONA
Green Building Rough 4/8/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/8/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/8/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/8/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/9/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/9/2024 Partial Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 4/9/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 4/9/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 4/11/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/11/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/11/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/12/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/12/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/17/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 4/22/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/22/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/22/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/23/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/23/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 4/23/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/29/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/29/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/29/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 4/29/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/29/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/30/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 4/30/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/8/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/8/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 5/8/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/8/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/8/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/15/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/15/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 5/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/15/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/15/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/16/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/16/2024 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 5/16/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/20/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/20/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/20/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 5/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/20/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/20/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/22/2024 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 5/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/31/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/31/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/31/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 5/31/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/31/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/31/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/5/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/5/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/6/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/6/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/6/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/6/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/10/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/10/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 6/10/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 6/10/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/10/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/11/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/11/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/11/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 6/11/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 6/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/12/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/13/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/13/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/13/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 6/17/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/18/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/18/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 6/24/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/24/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/24/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/26/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 6/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 6/28/2024 Conditional Approval DAVID BURKHEAD
Wood Frame 6/28/2024 Partial Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/1/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/1/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 7/2/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/9/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/11/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/11/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 7/12/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/12/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/19/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/19/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/19/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/23/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/23/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/26/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 7/29/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 7/31/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/31/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 7/31/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/1/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/1/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/6/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/8/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/8/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/8/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/9/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/13/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/13/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/13/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 8/15/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/15/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/16/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/16/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 8/19/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/19/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/19/2024 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 8/19/2024 Partial Approval MARTIN TAVITIAN
Floor/Roof Diaphrgm/Shear Wall 8/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 8/23/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/23/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 8/26/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 8/26/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/26/2024 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 8/26/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 8/30/2024 Partial Approval MARTIN TAVITIAN
Deputy Steel/Welding 9/5/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 9/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/6/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 9/6/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 9/12/2024 Partial Approval DAVID BURKHEAD
Insulation 9/13/2024 Partial Approval MARTIN TAVITIAN
Wood Frame 9/13/2024 Partial Approval MARTIN TAVITIAN
Pre-Inspection 9/16/2024 Partial Approval CHRISTOPHER BLACKWOOD
Wood Frame 9/16/2024 Partial Approval MARTIN TAVITIAN
Deputy Methane Barrier 9/18/2024 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 9/18/2024 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 9/24/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 9/25/2024 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 9/27/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 9/30/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 9/30/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 9/30/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/1/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/1/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/1/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/1/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/2/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/2/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/2/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/3/2024 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 10/3/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/3/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/3/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/3/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/7/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 10/7/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/8/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/8/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/9/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/9/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 10/9/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/10/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/11/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 10/11/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 10/11/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/17/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/18/2024 Partial Approval MARTIN TAVITIAN
Deputy Wood Construction 10/18/2024 Partial Approval MARTIN TAVITIAN
Green Building Rough 10/18/2024 Approved MARTIN TAVITIAN
METHANE-Rough 10/18/2024 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 10/18/2024 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 10/18/2024 Approved MARTIN TAVITIAN
Deputy Reinf. Concrete 10/21/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/21/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/21/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/22/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/22/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 10/22/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/25/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/25/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/25/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/28/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/28/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 10/28/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 10/28/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/30/2024 Approved CHRISTOPHER BLACKWOOD
Deputy Shotcrete 10/30/2024 Approved CHRISTOPHER BLACKWOOD
Deputy Reinf. Concrete 10/31/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/31/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 10/31/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/31/2024 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 10/31/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/4/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/4/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 11/4/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/4/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 11/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 11/5/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 11/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/6/2024 Partial Approval MARTIN TAVITIAN
Deputy Shotcrete 11/6/2024 Partial Approval MARTIN TAVITIAN
Deputy Wood Construction 11/6/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 11/7/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/7/2024 Partial Approval EDWIN GREGORYONA
Insulation 11/12/2024 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 11/12/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/13/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/13/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/13/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/14/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/14/2024 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 11/15/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/18/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/18/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/19/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 11/19/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/20/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/20/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/20/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/22/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/22/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 11/25/2024 Partial Approval MARTIN TAVITIAN
Wood Frame 11/26/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 12/3/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 12/3/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 12/3/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/3/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/5/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/5/2024 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/5/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/5/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/6/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 12/6/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/6/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/6/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/9/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 12/9/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/9/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/10/2024 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 12/10/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/11/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/11/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/11/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/12/2024 Approved EDWIN GREGORYONA
Special/Order Compliance 12/12/2024 Partial Inspection CHRISTOPHER BLACKWOOD
Wood Frame 12/12/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/18/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/18/2024 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 12/18/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/18/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/18/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/19/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/19/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/19/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 12/20/2024 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 12/20/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/20/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/20/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/24/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 12/26/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 12/26/2024 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 12/26/2024 Partial Approval MARTIN TAVITIAN
Piling/Pier/Caisson 12/27/2024 Partial Approval MARTIN TAVITIAN
Wood Frame 12/30/2024 Partial Approval EDWIN GREGORYONA
Wood Frame 12/31/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/7/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/7/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/10/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 1/10/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/13/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/13/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/13/2025 Partial Inspection EDWIN GREGORYONA
Wood Frame 1/13/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/15/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/15/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/15/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/16/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/16/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 1/16/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/21/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/22/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/22/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/22/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 1/23/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/23/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/23/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/23/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/28/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/28/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/28/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/28/2025 Partial Approval EDWIN GREGORYONA
Insulation 1/28/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 1/28/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/5/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/5/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/5/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/5/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 2/7/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 2/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 2/11/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/11/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/11/2025 Partial Approval EDWIN GREGORYONA
Insulation 2/11/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 2/11/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/19/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/20/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/20/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/20/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 2/20/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 2/20/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/21/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/21/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/21/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/21/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 2/21/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/24/2025 Approved EDWIN GREGORYONA
Deputy Reinf. Concrete 2/25/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/25/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/25/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/28/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 2/28/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 2/28/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/5/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/5/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/5/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 3/5/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/6/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/6/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/6/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/7/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/7/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/13/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/13/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/13/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/13/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/13/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 3/13/2025 Partial Approval EDWIN GREGORYONA
Deputy Other (see comments) 3/17/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/17/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/19/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/19/2025 Partial Approval EDWIN GREGORYONA
Insulation 3/19/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/21/2025 Partial Approval EDWIN GREGORYONA
Insulation 3/21/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 3/21/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/24/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/25/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/25/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/25/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 3/26/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/26/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 3/26/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/27/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/27/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 3/27/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 3/28/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/28/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/28/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/1/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/1/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/1/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 4/2/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/2/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/2/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/2/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/2/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/2/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/3/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/4/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/4/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/4/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/4/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/4/2025 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 4/4/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 4/7/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 4/7/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/8/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/10/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/14/2025 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 4/16/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/16/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/16/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/17/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/17/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/17/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/22/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/23/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/25/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/30/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/30/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 4/30/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/1/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/1/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/1/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 5/7/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/7/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/9/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/9/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 5/9/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/12/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/14/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/14/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/14/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/15/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/15/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 5/15/2025 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/21/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/21/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/3/2025 Partial Approval MARTIN TAVITIAN
Insulation 6/3/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 6/9/2025 Partial Approval EDWIN GREGORYONA
Insulation 6/9/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/9/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/9/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 6/9/2025 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 6/17/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 7/1/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/16/2025 Partial Approval EDWIN GREGORYONA
Insulation 7/22/2025 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 7/22/2025 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 7/29/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/31/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/7/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/25/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 9/8/2025 Partial Approval EDWIN GREGORYONA
Insulation 9/8/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/18/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/9/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 12/17/2025 Partial Approval EDWIN GREGORYONA
Pre-Inspection 1/16/2026 Approved EDWIN GREGORYONA
Pre-Inspection 3/31/2026 Approved MARTIN TAVITIAN
Pre-Inspection 4/1/2026 Approved MARTIN TAVITIAN
Pre-Inspection 4/13/2026 Approved MARTIN TAVITIAN
Pre-Inspection 5/26/2026 Approved MARTIN TAVITIAN