3045 E ATLANTIC ST 90023

Certificate Information: 3045 E ATLANTIC ST 90023

Application / Permit
21010-10000-05070
Plan Check / Job No.
B21LA18222
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
(N) ONE STORY ADU 745 SQ FT. PER GCS 65852.2(e)(1)(B) AND LAMC 12.22 A.33(c),(d) AND (g)
Permit Issued
Issued on 7/27/2022
Issuing Office
Metro
Current Status
CofO Issued on 6/15/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/10/2021 APPLICANT
Assigned to Plan Check Engineer 10/14/2021 RAHEL BEYENE
Corrections Issued 10/19/2021 RAHEL BEYENE
Building Plans Picked Up 10/21/2021 APPLICANT
Plan Check Approved 6/7/2022 ADAM HEGAZI
Issued 7/27/2022 APPLICANT
CofO in Progress 6/5/2023 ALIZAH MAYAGOITIA
Permit Finaled 6/15/2023 DEROLD HAUFF
CofO Issued 6/15/2023 DEROLD HAUFF
Permit Finaled 6/15/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 12/16/2021 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 1/19/2022 JEANETTE VONG
Sewer availability Cleared 1/19/2022 JEANETTE VONG
Hydrant and Access approval Cleared 2/23/2022 LAURINDA MEADE
Grading Pre-Inspection Cleared 3/9/2022 LANNY MERRICK
Clean Up Green Up Cleared 5/18/2022 KENTON TRINH
Low Impact Development Cleared 5/25/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 5/26/2022 JEANETTE VONG

Contact Information

Contractor Baron Construction & Design; Lic. No.: 917339-B 1171 N KENMORE AVE APT #8      LOS ANGELES, CA 90029
Engineer Schaefer,, Jeffrey Ambrose; Lic. No.: C91734 3325 E 4TH ST      LONG BEACH, CA 90814

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/15/2022 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 8/15/2022 Partial Inspection FREDDIE RIVERA
Reinforced Concrete Frame 8/15/2022 Partial Inspection FREDDIE RIVERA
Wood Frame 8/15/2022 Partial Inspection FREDDIE RIVERA
Footing/Foundation/Slab 9/7/2022 Approved FREDDIE RIVERA
Insulation 10/5/2022 Partial Approval RYAN SALAZAR
BUILDING-Rough-Frame 10/21/2022 Corrections Issued FREDDIE RIVERA
ELECTRICAL-Rough 10/21/2022 Partial Approval FREDDIE RIVERA
Green Building Rough 10/21/2022 Partial Inspection FREDDIE RIVERA
MERV13>=Rough 10/21/2022 Partial Inspection FREDDIE RIVERA
PLUMBING-Rough 10/21/2022 Partial Approval FREDDIE RIVERA
Verify Sprinkler Sign Off 10/21/2022 Partial Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 11/4/2022 Partial Inspection ALIZAH MAYAGOITIA
HVAC-Rough 11/4/2022 Corrections Issued ALIZAH MAYAGOITIA
Insulation 11/4/2022 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 11/4/2022 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 11/14/2022 Corrections Issued FREDDIE RIVERA
Green Building Rough 11/14/2022 Approved FREDDIE RIVERA
Interior/Exterior Lathing 11/14/2022 Approved FREDDIE RIVERA
MERV13>=Rough 11/14/2022 Partial Inspection FREDDIE RIVERA
PLUMBING-Rough 11/14/2022 Approved FREDDIE RIVERA
Verify Sprinkler Sign Off 11/14/2022 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 11/18/2022 Approved FREDDIE RIVERA
Green Building Rough 11/18/2022 Approved FREDDIE RIVERA
MERV13>=Rough 11/18/2022 Approved FREDDIE RIVERA
Pre-Inspection 11/18/2022 Conditional Approval FREDDIE RIVERA
Rough-Elec/Plmb/HVAC 11/18/2022 Approved FREDDIE RIVERA
Drywall Nailing 11/30/2022 Approved FREDDIE RIVERA
Interior/Exterior Lathing 11/30/2022 Partial Approval FREDDIE RIVERA
Interior/Exterior Lathing 12/9/2022 Approved CALEB MEISTER
Shower Pan 12/9/2022 Approved CALEB MEISTER
Gas Test 3/1/2023 Partial Inspection FREDDIE RIVERA
Sewer 3/1/2023 Approved FREDDIE RIVERA
Underground Mechanical 3/1/2023 Partial Approval FREDDIE RIVERA
ELECTRICAL-Final 4/25/2023 Corrections Issued FREDDIE RIVERA
Final 4/25/2023 Corrections Issued FREDDIE RIVERA
Green Building Final 4/25/2023 Partial Approval FREDDIE RIVERA
MERV13>=Final 4/25/2023 Partial Inspection FREDDIE RIVERA
PLUMBING-Final 4/25/2023 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 4/25/2023 SGSOV Not Ready FREDDIE RIVERA
Service/Power Release 4/25/2023 Not Ready for Inspection FREDDIE RIVERA
Smoke Detectors 4/25/2023 Approved FREDDIE RIVERA
Final 6/1/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
Green Building Final 6/1/2023 Approved ALIZAH MAYAGOITIA
MERV13>=Final 6/1/2023 Approved ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 6/1/2023 SGSOV Not Ready ALIZAH MAYAGOITIA
Service/Power Release 6/1/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
ELECTRICAL-Final 6/2/2023 Approved ALIZAH MAYAGOITIA
Final 6/2/2023 OK to Issue CofO ALIZAH MAYAGOITIA
HVAC-Final 6/2/2023 Approved ALIZAH MAYAGOITIA
PLUMBING-Final 6/2/2023 Approved ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 6/2/2023 SGSOV Approved ALIZAH MAYAGOITIA
Service/Power Release 6/2/2023 Approved ALIZAH MAYAGOITIA