717 N SEWARD ST 90038

Certificate Information: 717 N SEWARD ST 90038

Application / Permit
21010-10000-05063
Plan Check / Job No.
B21LA18207
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
NEW 4 STORY TYPE I-B OFFICE BUILDING WITH LARGE ROOF DECK AT 4TH FLOOR & OVER 2 LEVELS OF TYPE I-A SUBTERRANEAN PARKING GARAGE .
Permit Issued
Issued on 3/8/2024
Issuing Office
Metro
Current Status
Issued on 3/8/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/4/2021 APPLICANT
Assigned to Plan Check Engineer 10/21/2021 GARO TELMI
Disabled Access Plans Picked Up 10/28/2021 APPLICANT
Corrections Issued 11/3/2021 GARO TELMI
Green Plans Picked Up 11/15/2021 APPLICANT
Quality Review Completed 11/23/2021 MINYE PAK
Building Plans Picked Up 11/24/2021 APPLICANT
Applicant returned to address corrections 12/14/2021 GARO TELMI
Applicant returned to address corrections 1/4/2022 GARO TELMI
Applicant returned to address corrections 1/25/2022 GARO TELMI
Applicant returned to address corrections 2/8/2022 GARO TELMI
Applicant returned to address corrections 3/25/2022 SAM CHANG
Applicant returned to address corrections 1/26/2023 GARO TELMI
Applicant returned to address corrections 4/6/2023 GARO TELMI
Applicant returned to address corrections 6/23/2023 GARO TELMI
Applicant returned to address corrections 7/6/2023 GARO TELMI
Applicant returned to address corrections 7/25/2023 GARO TELMI
Applicant returned to address corrections 12/20/2023 GARO TELMI
Applicant returned to address corrections 1/31/2024 GARO TELMI
Applicant returned to address corrections 2/5/2024 GARO TELMI
Plan Check Approved 3/8/2024 GARO TELMI
Issued 3/8/2024 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/18/2021 CELINA MORENO
Address approval Cleared 12/21/2021 CINDY QI
Sewer availability Cleared 2/14/2022 CINDY QI
Hydrant and Access approval Cleared 4/7/2022 KURT CORRAL
Trees in Parkway Cleared 4/19/2022 ADALBERTO VERA
Low Impact Development Cleared 6/10/2022 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 6/14/2022 AMAAN MALIK
Encroachment in public way Cleared 12/13/2022 JEREMY CHOK
Bicycle Parking Cleared 12/27/2022 JEREMY CHOK
Permit Cleared 3/1/2023 AMAAN MALIK
Building over 36-ft Cleared 3/23/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/23/2023 CALOSHA APPROVED
Comm Cor/Mini-Mall Cleared 5/25/2023 DANIEL CORONADO
Comm Cor/Mini-Mall Cleared 5/25/2023 DANIEL CORONADO
Site Plan review Cleared 5/25/2023 DANIEL CORONADO
ZA Case Cleared 5/25/2023 DANIEL CORONADO
ZA Case Cleared 5/25/2023 DANIEL CORONADO
ZA Case Cleared 5/25/2023 DANIEL CORONADO
ZA Case Cleared 5/25/2023 DANIEL CORONADO
ZI Cleared 5/25/2023 DANIEL CORONADO
Highway dedication Cleared 6/21/2023 CELINA MORENO
Internal circulation Cleared 6/29/2023 MOHAMMAD HASAN
Transportation Demand Ord. Cleared 6/29/2023 MOHAMMAD HASAN
Construction near power lines Cleared 10/13/2023 RIDWAN HARDY
Construction within easement Cleared 10/13/2023 RIDWAN HARDY
Work Adjacent to Public Way Cleared 10/23/2023 JOSE RODRIGUEZ
Green Code Cleared 2/2/2024 DONALD CRICHLOW
Comm Cor/Mini-Mall Cleared 2/8/2024 DANIEL CORONADO
DAS Clearance Cleared 2/8/2024 GARO TELMI
Prkng lot landscape/Water mgmt Cleared 2/8/2024 DANIEL CORONADO
CPC Cleared 2/12/2024 ANNA VIDAL
Miscellaneous Cleared 2/12/2024 ANNA VIDAL
Miscellaneous Cleared 2/12/2024 ANNA VIDAL
Fire Marshal Fire Life Safety Cleared 2/13/2024 MENOA AGHAJANI

Contact Information

Architect House,, James Douglas; Lic. No.: C15526 10125 WASHINGTON BLVD      CULVER CITY, CA 90232
Contractor Kprs Construction Services Inc; Lic. No.: 751130-B 2850 SATURN STREET      BREA, CA 92821
Engineer Davis,, Richard Hays; Lic. No.: C48082 2015 CANTATA DR      LOS ANGELES, CA 90068
Engineer Reppuhn,, Nikolaus Yongbok; Lic. No.: C83924 1205 DUNNING WAY      SAN DIMAS, CA 91773
Engineer Rogers,, Robert S; Lic. No.: L8348 103 PETERSON PLACE      STEVENSVILLE, MT 59870
Engineer Smith,, Chris Wayne; Lic. No.: S6106 1852 CORINTH AVE #11      LOS ANGELES, CA 90025
Engineer Zen,, Petrina; Lic. No.: GE3217 905 PIEDMONT      IRVINE, CA 92620

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/3/2024 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 5/3/2024 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 5/3/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/6/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 5/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 5/30/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 5/30/2024 Partial Inspection EDWIN GREGORYONA
Green Building Rough 5/30/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 5/30/2024 Partial Inspection EDWIN GREGORYONA
METHANE-Rough 5/30/2024 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 5/30/2024 Partial Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 5/30/2024 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/30/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Methane Barrier 6/18/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 6/18/2024 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 6/18/2024 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 6/18/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/28/2024 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 6/28/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 6/28/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 6/28/2024 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 7/3/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/5/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/5/2024 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 7/5/2024 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 7/5/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/16/2024 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 7/16/2024 Partial Approval EDWIN GREGORYONA
METHANE-Subgrade 7/16/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/17/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/19/2024 Partial Approval EDWIN GREGORYONA
Deputy Methane Barrier 7/22/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/22/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 7/25/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 7/25/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 7/25/2024 Not Ready for Inspection EDWIN GREGORYONA
Piling/Pier/Caisson 7/25/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 7/26/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 7/31/2024 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/6/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/6/2024 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 8/7/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/8/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/12/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/14/2024 Not Ready for Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 8/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 8/15/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/16/2024 Not Ready for Inspection TIMOTHY POWELL
METHANE-Rough 8/16/2024 Not Ready for Inspection TIMOTHY POWELL
Reinforced Concrete Frame 8/16/2024 Partial Approval TIMOTHY POWELL
Verify Sprinkler Sign Off 8/16/2024 Not Ready for Inspection TIMOTHY POWELL
Excavation/Setback/Form/Re-Bar 8/20/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 8/26/2024 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 8/29/2024 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 8/29/2024 Approved EDWIN GREGORYONA
METHANE-Subgrade 8/29/2024 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/3/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/4/2024 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 9/4/2024 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 9/4/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 9/4/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/5/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/9/2024 Pending Review
Excavation/Setback/Form/Re-Bar 9/10/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/11/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/12/2024 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/19/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 9/30/2024 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 10/1/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/8/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/10/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/11/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/15/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/17/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/30/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/31/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/4/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/5/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/12/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/13/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/21/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/26/2024 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/27/2024 Partial Inspection MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 12/2/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/5/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/6/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/11/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/12/2024 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 12/16/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 12/20/2024 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/23/2024 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 12/27/2024 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 12/31/2024 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/6/2025 Partial Approval EDWIN GREGORYONA
Piling/Pier/Caisson 1/9/2025 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/23/2025 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 1/29/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/30/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/11/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/13/2025 Partial Inspection EDWIN GREGORYONA
Pre-Inspection 2/13/2025 Approved EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/18/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/20/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/21/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/21/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/24/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 2/28/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/6/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/10/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 3/10/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/10/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/17/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/19/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/21/2025 Not Ready for Inspection EDWIN GREGORYONA
Special/Order Compliance 3/21/2025 Approved EDWIN GREGORYONA
Light Gage Steel Frame 3/25/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/27/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/3/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/7/2025 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 4/8/2025 Approved EDWIN GREGORYONA
Light Gage Steel Frame 4/10/2025 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 4/22/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/29/2025 Partial Approval MARTIN TAVITIAN
Interior/Exterior Lathing 5/2/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 5/7/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/15/2025 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/21/2025 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 6/2/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/11/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/12/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 6/17/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/27/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/2/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/14/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/22/2025 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/22/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/30/2025 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/30/2025 Not Ready for Inspection DAVID BURKHEAD
Interior/Exterior Lathing 8/1/2025 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 8/8/2025 Partial Approval MARTIN TAVITIAN
Pre-Inspection 9/25/2025 Approved EDWIN GREGORYONA
Pre-Inspection 3/3/2026 Approved MARTIN TAVITIAN