21300 W BURBANK BLVD 91367

Certificate Information: 21300 W BURBANK BLVD 91367

Application / Permit
21010-10000-05025
Plan Check / Job No.
B21LA18094
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(10) Home for the Aged with special care
Work Description
(N) ON GRADE 6-STORY TYPE 1A MIXED USE SENIOR APARTMENT, HOTEL, RETAIL, RESTAURANT, OFFICE, AND PARKING GARAGE BUILDING. **BUILDING 1, ** **See comments for Change of Address**
Permit Issued
Issued on 2/16/2024
Issuing Office
Metro
Current Status
Issued on 2/16/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/7/2021 APPLICANT
Disabled Access Plans Picked Up 10/26/2021 APPLICANT
Assigned to Plan Check Engineer 10/28/2021 JOHNNY WU
Corrections Issued 12/20/2021 JOHNNY WU
Quality Review Completed 12/20/2021 FARUK SEZER
Applicant returned to address corrections 1/25/2022 JOHNNY WU
Applicant returned to address corrections 4/22/2022 JOHNNY WU
Applicant returned to address corrections 5/6/2022 JOHNNY WU
Applicant returned to address corrections 5/12/2022 JOHNNY WU
Applicant returned to address corrections 5/18/2022 JOHNNY WU
Applicant returned to address corrections 5/19/2022 JOHNNY WU
Applicant returned to address corrections 5/23/2022 JOHNNY WU
Applicant returned to address corrections 8/26/2022 JOHNNY WU
Applicant returned to address corrections 8/31/2022 JOHNNY WU
Applicant returned to address corrections 10/13/2022 JOHNNY WU
Applicant returned to address corrections 3/1/2023 JOHNNY WU
Applicant returned to address corrections 3/7/2023 JOHNNY WU
Applicant returned to address corrections 3/13/2023 JOHNNY WU
Applicant returned to address corrections 4/12/2023 JOHNNY WU
Applicant returned to address corrections 4/21/2023 JOHNNY WU
Applicant returned to address corrections 4/24/2023 JOHNNY WU
Applicant returned to address corrections 7/19/2023 JOHNNY WU
Plan Check Approved 2/12/2024 JOHNNY WU
Issued 2/16/2024 APPLICANT

Permit Application Clearance Information

Miscellaneous Cleared 11/5/2021 JOHNNY WU
Address approval Cleared 12/30/2021 JOHN LIN
Address approval Cleared 12/30/2021 JOHN LIN
Eng Process Fee Ord 176,300 Cleared 1/3/2022 JOHN LIN
Miscellaneous Cleared 11/23/2022 MIGUEL GAMBOA
Miscellaneous Cleared 11/23/2022 MIGUEL GAMBOA
Miscellaneous Cleared 11/23/2022 MIGUEL GAMBOA
Miscellaneous Cleared 11/23/2022 MIGUEL GAMBOA
Site Plan review Cleared 11/23/2022 MIGUEL GAMBOA
ZA Case Cleared 11/23/2022 MIGUEL GAMBOA
ZA Case Cleared 11/23/2022 MIGUEL GAMBOA
ZA Case Cleared 11/23/2022 MIGUEL GAMBOA
ZA Case Cleared 11/23/2022 MIGUEL GAMBOA
Low Impact Development Cleared 1/26/2023 SARAH YOUSSEF
Disturb/Remove Protected Trees Cleared 2/13/2023 ADALBERTO VERA
Trees in Parkway Cleared 2/16/2023 ADALBERTO VERA
Building over 36-ft Cleared 4/12/2023 CALOSHA APPROVED
Food establishment approval Cleared 4/12/2023 LACDHS APPROVED
Roof/Waste drainage to street Cleared 4/12/2023 DAGOVERTO GUERRERO
Food Service Establishment Cleared 4/13/2023 KENNETH BROWNE
Sewer availability Cleared 4/17/2023 CARLOS AGUILERA
Hydrant and Access approval Cleared 5/26/2023 KURT CORRAL
Fire Marshal Fire Life Safety Cleared 7/21/2023 ANDREW KO
Construction within easement Cleared 8/21/2023 TORI CHEN
Highway dedication Cleared 1/2/2024 CARLOS AGUILERA
DAS Clearance Cleared 1/9/2024 SHINE LIN
Green Code Cleared 1/10/2024 KHEDER ALRAZAA
Permit Cleared 1/17/2024 COLIN LOREDO
Specific Plan Cleared 1/24/2024 SHEILA AHORAIAN
Transportation Demand Ord. Cleared 1/24/2024 SHEILA AHORAIAN
Driveway location Cleared 1/29/2024 SHEILA AHORAIAN
Internal circulation Cleared 1/29/2024 SHEILA AHORAIAN
Miscellaneous Cleared 2/9/2024 NATHAN ROMINE
Specific Plan Cleared 2/9/2024 NATHAN ROMINE
ZI Cleared 2/9/2024 NATHAN ROMINE

Contact Information

Architect Wong,, Wilbur; Lic. No.: C29795 17911 VON KARMAN AVENUE #200      IRVINE, CA 92614
Contractor O'Neil W E Construction Co Of California; Lic. No.: 494031-B 909 N PACIFIC COAST HWY   STE 400    EL SEGUNDO, CA 90245
Engineer Dinsick,, Andrew James; Lic. No.: C72802 233 1/2 QUINCY AVE      LONG BEACH, CA 90803
Engineer Knapton,, Michael James; Lic. No.: L8012 2626 ESCALA CIR      SAN DIEGO, CA 92108
Engineer Van, Gaale, Mark Allan; Lic. No.: C58680 185 W ORANGEWOOD AVE STE 200      ORANGE, CA 92868
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205
Geologist Duke,, Steven Kenneth; Lic. No.: EG2269 4 SILVERBREEZE      IRVINE, CA 92614
Landscape Architect Case,, Casey Scott; Lic. No.: LA6032 2671 CROW CANYON ROAD      SAN RAMON, CA 94583

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/21/2024 Partial Inspection JEFFREY FULTON
Pre-Inspection 2/26/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 3/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/11/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 3/14/2024 Approved ROBERT DAVIS
Footing/Foundation/Slab 3/14/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/15/2024 Approved ROBERT DAVIS
Footing/Foundation/Slab 3/15/2024 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 3/18/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 3/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/21/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/22/2024 Conditional Approval KENNETH ROBERTS
Deputy Reinf. Concrete 3/26/2024 Approved ROBERT DAVIS
Footing/Foundation/Slab 3/26/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/27/2024 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 3/27/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/28/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 3/29/2024 Conditional Approval KENNETH ROBERTS
Deputy Reinf. Concrete 4/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/2/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/3/2024 Conditional Approval BRIAN KELLY
Deputy Reinf. Concrete 4/4/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/4/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 4/5/2024 Approved ROBERT DAVIS
Footing/Foundation/Slab 4/5/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/8/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/9/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/9/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/15/2024 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/17/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/17/2024 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 4/18/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 4/18/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/22/2024 Approved ROBERT DAVIS
Reinforced Concrete Frame 4/22/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/23/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/24/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/24/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/26/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/26/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/29/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/29/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/30/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/30/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/1/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/1/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/2/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/2/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/2/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/3/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/3/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/7/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/7/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 5/7/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/8/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/9/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/9/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/10/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/10/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/13/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/13/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/14/2024 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/15/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/15/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/15/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/15/2024 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 5/15/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/16/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/16/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/16/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/17/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/17/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/17/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 5/17/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/17/2024 Approved ROBERT DAVIS
Deputy Drilled-In Anchors 5/20/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/20/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/20/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/20/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/21/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/21/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/21/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/21/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/21/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/21/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/22/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/22/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/22/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/22/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/22/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/22/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/22/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/23/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/23/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/23/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 5/23/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/23/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/23/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/24/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/24/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/24/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 5/24/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/24/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/24/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/28/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/28/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/28/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/28/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/28/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/28/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/29/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/29/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/29/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/29/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/29/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/29/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/30/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/30/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 5/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/30/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/30/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/30/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/31/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 5/31/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/31/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/31/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/31/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/31/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/3/2024 Approved ROBERT DAVIS
Deputy Pre-Stress Concrete 6/3/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/3/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/3/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/3/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/3/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/3/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/4/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/4/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/4/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/4/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/5/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/5/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/5/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/5/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/6/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/6/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/6/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/6/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/7/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/7/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/7/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/7/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/7/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/7/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/7/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/10/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/10/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/10/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/10/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/10/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/10/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/10/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/11/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 6/11/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/11/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/12/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 6/12/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/12/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/13/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 6/13/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/13/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/14/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/14/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 6/14/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/14/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/17/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/18/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/18/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/20/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/20/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/20/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/21/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/21/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/21/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/24/2024 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 6/24/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/25/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 6/25/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 6/25/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/25/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/26/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/26/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/26/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/26/2024 Approved ROBERT DAVIS
Deputy Shotcrete 6/26/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/26/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 6/26/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/27/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/27/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/27/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/27/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 6/27/2024 Approved ROBERT DAVIS
Deputy Shotcrete 6/27/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/27/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 6/27/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/28/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 6/28/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 6/28/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 6/28/2024 Approved ROBERT DAVIS
Deputy Shotcrete 6/28/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/28/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 6/28/2024 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 6/28/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/1/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/1/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 7/1/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/1/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/2/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/2/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/2/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/3/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/3/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/3/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/5/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/5/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/5/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/8/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/8/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/8/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/8/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/9/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/9/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/9/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/9/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/9/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/10/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/10/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/10/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/10/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/11/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/11/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/11/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/12/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/12/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/12/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/12/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/15/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/15/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/15/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/15/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/15/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/16/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/16/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/16/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/16/2024 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 7/16/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 7/16/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/17/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/17/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/17/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/17/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/17/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/18/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/18/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/18/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/18/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/18/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/19/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/19/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/19/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 7/19/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/19/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 7/19/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/19/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/22/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/22/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/22/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/22/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 7/22/2024 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 7/22/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/23/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/23/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/23/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/23/2024 Approved ROBERT DAVIS
Deputy Shotcrete 7/23/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/23/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/23/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/24/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/24/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/24/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/24/2024 Approved ROBERT DAVIS
Deputy Shotcrete 7/24/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/24/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/25/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 7/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/25/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/25/2024 Approved ROBERT DAVIS
Deputy Shotcrete 7/25/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/25/2024 Partial Approval ROBERT DAVIS
Special/Order Compliance 7/25/2024 Approved KENNETH ROBERTS
Deputy Reinf. Concrete 7/26/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 7/26/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/26/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/29/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/30/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/30/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/31/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/31/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 7/31/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/1/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/1/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/2/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/2/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/5/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/5/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/6/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/6/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/6/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/7/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/7/2024 Approved ROBERT DAVIS
Reinforced Concrete Frame 8/7/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 8/7/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/8/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/8/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/8/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/9/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/9/2024 Approved ROBERT DAVIS
Reinforced Concrete Frame 8/9/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/12/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/13/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/13/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/13/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/13/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/14/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/14/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/14/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/14/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/15/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/15/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/15/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/15/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/16/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/16/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/16/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/16/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/19/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/19/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/19/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/20/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/20/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/20/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/21/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/21/2024 Approved ROBERT DAVIS
Green Building Rough 8/21/2024 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 8/21/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 8/21/2024 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 8/21/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 8/22/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/22/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/22/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/23/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 8/23/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/23/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 8/26/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/26/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 8/27/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/27/2024 Approved ROBERT DAVIS
Reinforced Concrete Frame 8/27/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 8/28/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/28/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/28/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/29/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/29/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/29/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/30/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/30/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/3/2024 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 9/3/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/4/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 9/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/4/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/4/2024 OK to Expire Permit ROBERT DAVIS
Deputy Reinf. Concrete 9/5/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 9/5/2024 Conditional Approval ROBERT DAVIS
Special/Order Compliance 9/5/2024 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Deputy Reinf. Concrete 9/6/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 9/6/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/6/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/9/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/9/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/9/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/10/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/10/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 9/10/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/10/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/10/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/11/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/11/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 9/11/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 9/11/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/11/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/12/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/12/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 9/12/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/12/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/13/2024 Approved ROBERT DAVIS
Deputy Pre-Stress Concrete 9/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/13/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 9/13/2024 No Access for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 9/16/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/16/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/16/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 9/16/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/16/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/17/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/17/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/17/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 9/17/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 9/17/2024 Approved ROBERT DAVIS
Drywall Nailing 9/17/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/17/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/18/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/18/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/18/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 9/18/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/19/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/19/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/19/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/20/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/20/2024 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/21/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/23/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/23/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/23/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/23/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/23/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/23/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/24/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/24/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/24/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/24/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/24/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/24/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/25/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/25/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 9/25/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 9/25/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/25/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/26/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/26/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 9/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/26/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 9/26/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/26/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/27/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 9/27/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/27/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/27/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/27/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/27/2024 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/30/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/30/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/1/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/1/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/1/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/2/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/2/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/2/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/2/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/2/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/2/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/3/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/3/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/3/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 10/3/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 10/3/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/3/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 10/3/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/4/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/4/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/4/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/4/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/7/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/7/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/7/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/7/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/8/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/8/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/8/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/8/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/9/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/9/2024 Order to Comply Issued ROBERT DAVIS
Deputy Reinf. Concrete 10/9/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 10/9/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/9/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 10/9/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/10/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/10/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/10/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/10/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/11/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/11/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 10/11/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/15/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/15/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/15/2024 Partial Approval ROBERT DAVIS
Green Building Rough 10/15/2024 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 10/15/2024 Conditional Approval ROBERT DAVIS
Verify Sprinkler Sign Off 10/15/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Pre-Stress Concrete 10/16/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/16/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/16/2024 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/16/2024 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 10/16/2024 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 10/17/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 10/17/2024 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 10/17/2024 Partial Approval MARTIN TAVITIAN
Deputy Steel/Welding 10/17/2024 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 10/17/2024 Partial Approval MARTIN TAVITIAN
Deputy Pre-Stress Concrete 10/18/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/18/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/18/2024 Conditional Approval CAMERON CHABAN
Deputy Steel/Welding 10/18/2024 Conditional Approval CAMERON CHABAN
Deputy Pre-Stress Concrete 10/21/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/21/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 10/21/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/21/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/21/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 10/22/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/22/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 10/22/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/22/2024 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 10/23/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/23/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 10/23/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/23/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/24/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 10/24/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 10/24/2024 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/24/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/24/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/25/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 10/25/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/25/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 10/25/2024 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/25/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/25/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/28/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/28/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/28/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/28/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 10/28/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/28/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/28/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/28/2024 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 10/28/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/29/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/29/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/29/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/29/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/29/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/29/2024 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 10/29/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/30/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/30/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/30/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/30/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/30/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 10/30/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/31/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/31/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/31/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 10/31/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/31/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/31/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/1/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/1/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/1/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/1/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/1/2024 Partial Inspection ROBERT DAVIS
Deputy Pre-Stress Concrete 11/4/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/4/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/5/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/5/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/5/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/5/2024 Order to Comply Issued ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/5/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/6/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/6/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/6/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/6/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/6/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/7/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/7/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/7/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/7/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/7/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/7/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/7/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/8/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/8/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/8/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/8/2024 Order to Comply Issued GREGORY POMISH
Deputy Reinf. Masonry 11/8/2024 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/8/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/8/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/8/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/12/2024 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 11/12/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/12/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/12/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/12/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/12/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/12/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/13/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/13/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/13/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/13/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/14/2024 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 11/14/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/14/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/14/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/14/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/14/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/14/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 11/14/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/14/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/14/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/15/2024 Approved ROBERT DAVIS
Deputy Pre-Stress Concrete 11/15/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 11/15/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 11/15/2024 Approved ROBERT DAVIS
Deputy Shotcrete 11/15/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/15/2024 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/15/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/18/2024 Conditional Approval JOHN KITCKO
Deputy Pre-Stress Concrete 11/18/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Concrete 11/18/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/18/2024 Conditional Approval JOHN KITCKO
Deputy Shotcrete 11/18/2024 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 11/18/2024 Conditional Approval JOHN KITCKO
Drywall Nailing 11/18/2024 Partial Approval JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/18/2024 Not Ready for Inspection JOHN KITCKO
Deputy Drilled-In Anchors 11/19/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/19/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/19/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/19/2024 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/19/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/19/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/19/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/20/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/20/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/20/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/20/2024 Conditional Approval ROBERT DAVIS
Drywall Nailing 11/20/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/20/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/21/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/21/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/21/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 11/21/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/21/2024 Approved ROBERT DAVIS
Deputy Shotcrete 11/21/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/21/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/21/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/21/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 11/21/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/22/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/22/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/22/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/22/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/22/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/22/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/22/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/22/2024 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 11/22/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/25/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/25/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/25/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/25/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/25/2024 Conditional Approval ROBERT DAVIS
Drywall Nailing 11/25/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/25/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 11/26/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/26/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/26/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/26/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/26/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/26/2024 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 11/26/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 11/27/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 11/27/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/27/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 11/27/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/27/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 11/27/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/27/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 11/27/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/2/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/2/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/2/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/2/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/2/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/2/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/3/2024 Approved ROBERT DAVIS
Deputy Pre-Stress Concrete 12/3/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/3/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/3/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 12/3/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/3/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 12/3/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/4/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/4/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/4/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 12/4/2024 Approved ROBERT DAVIS
Deputy Reinf. Masonry 12/4/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/4/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/4/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/4/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 12/5/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/5/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/5/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/5/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/5/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/5/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/6/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/6/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/6/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/6/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/6/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/6/2024 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/9/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/9/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/9/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/9/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/9/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/9/2024 Corrections Issued ROBERT DAVIS
Deputy Reinf. Concrete 12/10/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/10/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 12/10/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/10/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 12/10/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/11/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/11/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/11/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/11/2024 Conditional Approval ROBERT DAVIS
Drywall Nailing 12/11/2024 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/11/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/11/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/12/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/12/2024 Approved ROBERT DAVIS
Deputy Reinf. Concrete 12/12/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/12/2024 Approved ROBERT DAVIS
Deputy Steel/Welding 12/12/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/12/2024 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 12/12/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/13/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/13/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/13/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/13/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/13/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 12/16/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/16/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/16/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/16/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/16/2024 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/17/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/17/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/17/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/17/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/17/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/17/2024 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/17/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/18/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/18/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/18/2024 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 12/18/2024 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/19/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/19/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/19/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/19/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/19/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/19/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/20/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/20/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/20/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/20/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/20/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/20/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/23/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/23/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/23/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/23/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/23/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/23/2024 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/23/2024 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/24/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/24/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/24/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/24/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/24/2024 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 12/24/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 12/26/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/26/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/26/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/26/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/26/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/26/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 12/27/2024 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/27/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/27/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/27/2024 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/27/2024 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/27/2024 Conditional Approval GREGORY POMISH
Deputy Wood Construction 12/27/2024 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/27/2024 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 12/27/2024 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 12/30/2024 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 12/31/2024 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/31/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/31/2024 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/31/2024 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/31/2024 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 12/31/2024 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 12/31/2024 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/31/2024 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/31/2024 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 1/2/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/2/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/2/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/2/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/2/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/2/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/2/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/3/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/3/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/3/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/3/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/3/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/3/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/6/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/6/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/6/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/6/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/6/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/6/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 1/6/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 1/7/2025 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 1/7/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/7/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/7/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/7/2025 Approved ROBERT DAVIS
Deputy Shotcrete 1/7/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/7/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/7/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 1/7/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/7/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/8/2025 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 1/8/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/8/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/8/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/8/2025 No Access for Inspection ROBERT DAVIS
Deputy Wood Construction 1/8/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/8/2025 No Access for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/8/2025 No Access for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/9/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/9/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/9/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 1/9/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/10/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/10/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 1/10/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/13/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/14/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/14/2025 No Result Entered CAMERON CHABAN
Deputy Reinf. Masonry 1/14/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/14/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/14/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/14/2025 No Result Entered CAMERON CHABAN
Deputy Wood Construction 1/14/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/14/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/14/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/15/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/15/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/15/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/15/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/15/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/15/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/15/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/15/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/15/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/16/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/16/2025 No Result Entered CAMERON CHABAN
Deputy Pre-Stress Concrete 1/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/16/2025 No Result Entered CAMERON CHABAN
Deputy Reinf. Masonry 1/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/16/2025 No Result Entered CAMERON CHABAN
Deputy Shotcrete 1/16/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/16/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 1/16/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/16/2025 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 1/16/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/17/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/17/2025 No Result Entered CAMERON CHABAN
Deputy Pre-Stress Concrete 1/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/17/2025 No Result Entered CAMERON CHABAN
Deputy Reinf. Masonry 1/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/17/2025 No Result Entered CAMERON CHABAN
Deputy Shotcrete 1/17/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/17/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/17/2025 No Result Entered CAMERON CHABAN
Deputy Wood Construction 1/17/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/17/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/17/2025 No Access for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 1/21/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/21/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/21/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/21/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/21/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/21/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/22/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/22/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/22/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/22/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/22/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/22/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/23/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/23/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/23/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/23/2025 Approved ROBERT DAVIS
Deputy Reinf. Masonry 1/23/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/23/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/23/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 1/23/2025 No Access for Inspection ROBERT DAVIS
Masonry Wall/Backfill 1/23/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/24/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/24/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 1/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/24/2025 Approved ROBERT DAVIS
Deputy Shotcrete 1/24/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/24/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/24/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/24/2025 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 1/24/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/27/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/27/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/27/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/27/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/27/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/27/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 1/28/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/28/2025 Approved ROBERT DAVIS
Deputy Shotcrete 1/28/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/28/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/28/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/28/2025 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 1/28/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/29/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/29/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/29/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/29/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/29/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/29/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/29/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/29/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 1/30/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/30/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/30/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/30/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/30/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/30/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/30/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/30/2025 Partial Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 1/31/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/31/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/31/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/31/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/31/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 1/31/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/31/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 1/31/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/31/2025 Partial Approval ROBERT DAVIS
Structural Steel Frame 1/31/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/3/2025 Order to Comply Issued GREGORY POMISH
Deputy Pre-Stress Concrete 2/3/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/3/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 2/3/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/3/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/3/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 2/3/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 2/3/2025 Not Ready for Inspection GREGORY POMISH
Structural Steel Frame 2/3/2025 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/4/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/4/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/4/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/4/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/4/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/4/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/5/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/5/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/5/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/5/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/5/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/5/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/5/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 2/6/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/6/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/6/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/6/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/6/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/6/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 2/7/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/7/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/7/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/7/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/7/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/7/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 2/7/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/7/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/10/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/10/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/10/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/10/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/10/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 2/10/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/11/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/11/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/11/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/11/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 2/11/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/12/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/12/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 2/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/12/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/12/2025 Approved ROBERT DAVIS
Deputy Wood Construction 2/12/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/12/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/12/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 2/13/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/13/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 2/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/13/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/13/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/13/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/13/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/13/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/14/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/14/2025 Approved ROBERT DAVIS
Deputy Reinf. Masonry 2/14/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/14/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/14/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/14/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/14/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 2/18/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/18/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 2/18/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/18/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/18/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/19/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/19/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/19/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/19/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/19/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/19/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/19/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/19/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/20/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/20/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/20/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/20/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/20/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/20/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/21/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/21/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/21/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/21/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/21/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/21/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 2/24/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/24/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/24/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/24/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/24/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/24/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/25/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/25/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/25/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/25/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/25/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/25/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/25/2025 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 2/25/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/26/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/26/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/26/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/26/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/26/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/26/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/27/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/27/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/27/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/27/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/27/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/27/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 2/28/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 2/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/28/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/28/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 2/28/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/28/2025 Partial Approval ROBERT DAVIS
Insulation 2/28/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/3/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/3/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/3/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/3/2025 Partial Approval ROBERT DAVIS
Insulation 3/3/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/4/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/4/2025 Approved ROBERT DAVIS
Deputy Steel/Welding 3/4/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/4/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/4/2025 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 3/4/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/4/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 3/5/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/5/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/5/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/5/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/5/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/5/2025 Partial Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 3/6/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/6/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/6/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/6/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/6/2025 Conditional Approval GREGORY POMISH
Deputy Wood Construction 3/6/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/6/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/6/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/7/2025 Conditional Approval GREGORY POMISH
Deputy Wood Construction 3/7/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/7/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 3/7/2025 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/10/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 3/10/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/10/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/10/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/10/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/10/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 3/10/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/11/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/11/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/11/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/11/2025 Not Ready for Inspection ROBERT DAVIS
Reinforced Masonry Frame 3/11/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/12/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/12/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/12/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/12/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/12/2025 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/12/2025 Partial Approval ROBERT DAVIS
Wall Anchors 3/12/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 3/13/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/13/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 3/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/13/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/13/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/13/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/13/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/13/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/14/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/14/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/14/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/14/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/14/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 3/14/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 3/17/2025 Partial Approval ROBERT DAVIS
Insulation 3/17/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/17/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/18/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/18/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/18/2025 Conditional Approval ROBERT DAVIS
Insulation 3/18/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/18/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/19/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/19/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/19/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/19/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/19/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/19/2025 Partial Approval ROBERT DAVIS
Insulation 3/19/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/20/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/20/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/20/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/20/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/21/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/21/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/21/2025 Conditional Approval ROBERT DAVIS
Insulation 3/21/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/21/2025 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/22/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/24/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/24/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 3/24/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/24/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/24/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/24/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/25/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/25/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/25/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 3/25/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/25/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 3/26/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/26/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/26/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/26/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 3/26/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/26/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/26/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/26/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 3/26/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/26/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/27/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 3/27/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/27/2025 Partial Approval ROBERT DAVIS
Insulation 3/27/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/27/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/28/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/28/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 3/28/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/28/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/28/2025 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/28/2025 Partial Approval ROBERT DAVIS
Insulation 3/28/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/28/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/1/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/1/2025 Partial Approval ROBERT DAVIS
Insulation 4/1/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/1/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/2/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/2/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/2/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/2/2025 Partial Approval ROBERT DAVIS
Insulation 4/2/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/2/2025 Corrections Issued ROBERT DAVIS
Deputy Drilled-In Anchors 4/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/3/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/3/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/3/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/4/2025 Approved ROBERT DAVIS
Deputy Wood Construction 4/4/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/4/2025 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/4/2025 Partial Approval ROBERT DAVIS
Insulation 4/4/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/4/2025 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 4/4/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/7/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/7/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/7/2025 Partial Inspection ROBERT DAVIS
Insulation 4/7/2025 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 4/7/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/7/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 4/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/8/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/8/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/8/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/8/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/8/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/8/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 4/9/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/9/2025 Approved ROBERT DAVIS
Deputy Reinf. Masonry 4/9/2025 Approved ROBERT DAVIS
Deputy Steel/Welding 4/9/2025 Approved ROBERT DAVIS
Deputy Wood Construction 4/9/2025 Approved ROBERT DAVIS
Drywall Nailing 4/9/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/9/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/9/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/10/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/10/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/10/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/10/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/11/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/11/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/11/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/11/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/11/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 4/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/14/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/14/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/14/2025 Partial Approval ROBERT DAVIS
Insulation 4/14/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/14/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/15/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/15/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/15/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/15/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/15/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/15/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/15/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/15/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/16/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/16/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/16/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/16/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/16/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/16/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/16/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/16/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/17/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/17/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/17/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/17/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/17/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/17/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/17/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/17/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/18/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/18/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/18/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/18/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 4/18/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/18/2025 Partial Approval ROBERT DAVIS
Insulation 4/18/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/18/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/21/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/21/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/21/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/21/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/21/2025 Partial Approval ROBERT DAVIS
Interior/Exterior Lathing 4/21/2025 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 4/21/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/22/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/22/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/22/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/22/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/22/2025 Partial Approval ROBERT DAVIS
Insulation 4/22/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/22/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/23/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 4/23/2025 Partial Approval GREGORY POMISH
Insulation 4/23/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/23/2025 Partial Inspection GREGORY POMISH
Drywall Nailing 4/24/2025 Partial Approval GREGORY POMISH
Insulation 4/24/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/24/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/25/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/25/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/25/2025 Partial Approval ROBERT DAVIS
Insulation 4/25/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/25/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/28/2025 Conditional Approval ROBERT DAVIS
Insulation 4/28/2025 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 4/28/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/28/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 4/29/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 4/29/2025 Partial Approval GREGORY POMISH
Insulation 4/29/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 4/29/2025 Partial Inspection GREGORY POMISH
Deputy Steel/Welding 4/30/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/30/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 4/30/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/30/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/1/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/1/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/1/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/1/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/1/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/1/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/1/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/2/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/2/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/2/2025 Conditional Approval ROBERT DAVIS
Interior/Exterior Lathing 5/2/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/2/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/5/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/5/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/5/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/5/2025 Partial Approval ROBERT DAVIS
Insulation 5/5/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/5/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/6/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/6/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/6/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/6/2025 Partial Approval ROBERT DAVIS
Insulation 5/6/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/6/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/7/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/7/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/7/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/7/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/7/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/7/2025 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 5/7/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/7/2025 Partial Approval ROBERT DAVIS
Structural Steel Frame 5/7/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/8/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/8/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/8/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/9/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/9/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/9/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/9/2025 Partial Approval ROBERT DAVIS
Insulation 5/9/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/9/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/12/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/12/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/12/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/12/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/12/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/12/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/13/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/13/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/13/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/13/2025 Partial Approval ROBERT DAVIS
Insulation 5/13/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/13/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/14/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/14/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/14/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/14/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/14/2025 Partial Approval ROBERT DAVIS
Insulation 5/14/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/14/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/15/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/15/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/15/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/15/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/15/2025 No Access for Inspection ROBERT DAVIS
Insulation 5/15/2025 No Access for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/15/2025 No Access for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/16/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 5/16/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 5/16/2025 Conditional Approval JEFFREY DURAN
Deputy Wood Construction 5/16/2025 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 5/19/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/19/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/19/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/19/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/19/2025 Partial Approval ROBERT DAVIS
Insulation 5/19/2025 Approved ROBERT DAVIS
Interior/Exterior Lathing 5/19/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/19/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/20/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/20/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/20/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/20/2025 Partial Approval ROBERT DAVIS
Insulation 5/20/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/20/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/21/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/21/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/21/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/21/2025 Partial Approval ROBERT DAVIS
Insulation 5/21/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/21/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/22/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/22/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/22/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/22/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/22/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/22/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/23/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/23/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/23/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/23/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/23/2025 Partial Approval ROBERT DAVIS
Insulation 5/23/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/23/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/27/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/27/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/27/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/27/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/27/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/27/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/28/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/28/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/28/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/28/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/28/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/28/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/29/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/29/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/29/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/29/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/29/2025 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 5/29/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 5/29/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 5/29/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/30/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/30/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/30/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 5/30/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 5/30/2025 Partial Approval ROBERT DAVIS
Insulation 5/30/2025 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 5/30/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 5/30/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/2/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/2/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/2/2025 Conditional Approval ROBERT DAVIS
Insulation 6/2/2025 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 6/2/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/2/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/3/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/3/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/3/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/3/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 6/3/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/3/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/4/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/4/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/4/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/4/2025 Partial Approval ROBERT DAVIS
Insulation 6/4/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/4/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/5/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/5/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/5/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/5/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 6/5/2025 Conditional Approval ROBERT DAVIS
Wood Frame 6/5/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/6/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/6/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/6/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/6/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/6/2025 Partial Approval ROBERT DAVIS
Insulation 6/6/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/6/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/9/2025 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 6/9/2025 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/9/2025 Conditional Approval DANIEL VARNUM
Deputy Wood Construction 6/9/2025 Conditional Approval DANIEL VARNUM
Drywall Nailing 6/9/2025 Partial Approval DANIEL VARNUM
Insulation 6/9/2025 Not Ready for Inspection DANIEL VARNUM
Light Gage Steel Frame 6/9/2025 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 6/10/2025 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 6/10/2025 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 6/10/2025 Conditional Approval DANIEL VARNUM
Deputy Wood Construction 6/10/2025 Conditional Approval DANIEL VARNUM
Drywall Nailing 6/10/2025 Partial Inspection DANIEL VARNUM
Insulation 6/10/2025 Partial Inspection DANIEL VARNUM
Light Gage Steel Frame 6/10/2025 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 6/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/11/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/11/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/11/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 6/11/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/11/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/12/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/12/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/12/2025 Partial Approval ROBERT DAVIS
Insulation 6/12/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/12/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/13/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/13/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/13/2025 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/16/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/16/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/16/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/16/2025 Partial Approval ROBERT DAVIS
Insulation 6/16/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/16/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/17/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/17/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/17/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/17/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 6/17/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/17/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/18/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/18/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/18/2025 Partial Approval ROBERT DAVIS
Insulation 6/18/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/18/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/20/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/20/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/20/2025 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/20/2025 Partial Approval ROBERT DAVIS
Insulation 6/20/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/20/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 6/23/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/23/2025 Partial Approval ROBERT DAVIS
Insulation 6/23/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/23/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 6/24/2025 Partial Approval ROBERT DAVIS
Insulation 6/24/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/24/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/25/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/25/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/25/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/25/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/25/2025 Partial Approval ROBERT DAVIS
Insulation 6/25/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/25/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 6/26/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/26/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/26/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/26/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 6/26/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/26/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 6/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/27/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/27/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 6/27/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 6/27/2025 Partial Approval ROBERT DAVIS
Insulation 6/27/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/27/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 6/30/2025 Partial Approval ROBERT DAVIS
Insulation 6/30/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/30/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/1/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/1/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/1/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/1/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/1/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 7/1/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/2/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/2/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/2/2025 Partial Approval ROBERT DAVIS
Insulation 7/2/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/2/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 7/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/3/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/3/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/3/2025 Partial Approval ROBERT DAVIS
Insulation 7/3/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/3/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/7/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/7/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/7/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/8/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/8/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/8/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/8/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 7/9/2025 Partial Approval ROBERT DAVIS
Insulation 7/9/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/9/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/10/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/10/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/10/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 7/11/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/11/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/11/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/11/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 7/14/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/14/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/14/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/15/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/15/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/15/2025 Not Ready for Inspection ROBERT DAVIS
Wall Anchors 7/15/2025 Partial Approval ROBERT DAVIS
Deputy Wood Construction 7/16/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 7/16/2025 Partial Approval GREGORY POMISH
Insulation 7/16/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 7/16/2025 Partial Approval GREGORY POMISH
Drywall Nailing 7/17/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/17/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/17/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 7/18/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/18/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/18/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/21/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/21/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/21/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/22/2025 Partial Approval ROBERT DAVIS
Insulation 7/22/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/22/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/23/2025 Partial Approval ROBERT DAVIS
Insulation 7/23/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/23/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 7/24/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/24/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/24/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 7/25/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/25/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/25/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/25/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 7/28/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/28/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 7/28/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/28/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 7/29/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 7/29/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/29/2025 Conditional Approval ROBERT DAVIS
Special/Order Compliance 7/30/2025 Corrections Issued ROBERT DAVIS
Deputy Drilled-In Anchors 7/31/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 7/31/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 7/31/2025 Partial Approval ROBERT DAVIS
Insulation 7/31/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 7/31/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/1/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/1/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/1/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/1/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/1/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/4/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/4/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/4/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/4/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/4/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/5/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/5/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/5/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/5/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/5/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 8/6/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/6/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/6/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/6/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/7/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/7/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 8/7/2025 Not Ready for Inspection GREGORY POMISH
Insulation 8/7/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 8/7/2025 Not Ready for Inspection GREGORY POMISH
Interior/Exterior Lathing 8/8/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/8/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 8/11/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/11/2025 Partial Approval ROBERT DAVIS
Insulation 8/11/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/11/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 8/12/2025 Partial Approval ROBERT DAVIS
Insulation 8/12/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 8/12/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 8/13/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/13/2025 Partial Approval ROBERT DAVIS
Insulation 8/13/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/13/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 8/15/2025 Partial Approval ROBERT DAVIS
Insulation 8/15/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/15/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 8/18/2025 Partial Approval ROBERT DAVIS
Insulation 8/18/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/18/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 8/19/2025 Partial Approval GREGORY POMISH
Insulation 8/19/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 8/19/2025 Not Ready for Inspection GREGORY POMISH
Deputy Steel/Welding 8/20/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 8/20/2025 Partial Approval GREGORY POMISH
Insulation 8/20/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 8/20/2025 Partial Approval GREGORY POMISH
Deputy Steel/Welding 8/21/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 8/21/2025 Partial Inspection GREGORY POMISH
Insulation 8/21/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 8/21/2025 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 8/25/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/25/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/25/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 8/26/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/26/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/26/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 8/27/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/27/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 8/27/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 8/28/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/28/2025 Not Ready for Inspection ROBERT DAVIS
Interior/Exterior Lathing 8/28/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 8/29/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 8/29/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 8/29/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 8/29/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 8/29/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 8/29/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/2/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/2/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/2/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/2/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/2/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 9/3/2025 Partial Approval ROBERT DAVIS
Insulation 9/3/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/3/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 9/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/4/2025 Approved ROBERT DAVIS
Deputy Steel/Welding 9/4/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/4/2025 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/4/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/4/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/4/2025 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 9/4/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/5/2025 Approved ROBERT DAVIS
Deputy Steel/Welding 9/5/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/5/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/5/2025 Approved ROBERT DAVIS
Light Gage Steel Frame 9/5/2025 Partial Approval ROBERT DAVIS
Deputy Wood Construction 9/8/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/8/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 9/8/2025 Partial Approval ROBERT DAVIS
T-Bar Ceiling 9/8/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/9/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/9/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/9/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/9/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/9/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Masonry 9/10/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/10/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 9/10/2025 Partial Inspection GREGORY POMISH
Insulation 9/10/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 9/10/2025 Partial Inspection GREGORY POMISH
Deputy Reinf. Masonry 9/11/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/11/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/12/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/12/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/12/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Masonry 9/15/2025 Approved ROBERT DAVIS
Deputy Shotcrete 9/15/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/15/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/15/2025 Partial Approval ROBERT DAVIS
Insulation 9/15/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/15/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 9/16/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/16/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/16/2025 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 9/16/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Masonry 9/17/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/17/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/17/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/17/2025 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 9/17/2025 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 9/19/2025 Partial Approval ROBERT DAVIS
Deputy Shotcrete 9/22/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/22/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/22/2025 Partial Approval ROBERT DAVIS
Insulation 9/22/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/22/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Masonry 9/23/2025 Approved JOHN KITCKO
Deputy Steel/Welding 9/23/2025 Approved JOHN KITCKO
Deputy Reinf. Masonry 9/24/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 9/24/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/24/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 9/25/2025 Partial Approval GREGORY POMISH
Insulation 9/25/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 9/25/2025 Partial Approval GREGORY POMISH
Deputy Steel/Welding 9/26/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 9/26/2025 Not Ready for Inspection GREGORY POMISH
Insulation 9/26/2025 Not Ready for Inspection GREGORY POMISH
Deputy Steel/Welding 9/29/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/30/2025 Conditional Approval ROBERT DAVIS
Deputy Wood Construction 9/30/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 9/30/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 9/30/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 9/30/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 10/1/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/1/2025 Partial Approval ROBERT DAVIS
Insulation 10/1/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/1/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 10/2/2025 Partial Approval ROBERT DAVIS
Insulation 10/2/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/2/2025 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 10/3/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 10/3/2025 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/3/2025 Not Ready for Inspection GREGORY POMISH
Insulation 10/3/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 10/3/2025 Not Ready for Inspection GREGORY POMISH
Deputy Steel/Welding 10/6/2025 Approved ROBERT DAVIS
Insulation 10/6/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/6/2025 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 10/6/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/7/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/7/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/7/2025 Conditional Approval ROBERT DAVIS
Insulation 10/7/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/7/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 10/8/2025 Partial Approval ROBERT DAVIS
Insulation 10/8/2025 Partial Approval ROBERT DAVIS
Wood Frame 10/8/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/9/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/9/2025 Partial Approval ROBERT DAVIS
Insulation 10/9/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/9/2025 OK to Expire Permit ROBERT DAVIS
Deputy Drilled-In Anchors 10/14/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 10/14/2025 Conditional Approval BRIAN KELLY
Drywall Nailing 10/15/2025 Partial Approval ROBERT DAVIS
Insulation 10/15/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 10/15/2025 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 10/16/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 10/16/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/16/2025 Partial Approval ROBERT DAVIS
Insulation 10/16/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/16/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 10/17/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/17/2025 Partial Approval ROBERT DAVIS
Insulation 10/17/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/17/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 10/20/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/20/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 10/20/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/20/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/21/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 10/21/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 10/21/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 10/21/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Steel/Welding 10/22/2025 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/22/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/23/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 10/23/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/24/2025 Conditional Approval DANIEL VARNUM
Green Building Rough 10/24/2025 Not Ready for Inspection DANIEL VARNUM
Reinforced Concrete Frame 10/24/2025 No Access for Inspection DANIEL VARNUM
Verify Sprinkler Sign Off 10/24/2025 Not Ready for Inspection DANIEL VARNUM
Deputy Reinf. Concrete 10/27/2025 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 10/27/2025 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 10/27/2025 Conditional Approval JOHN KITCKO
Light Gage Steel Frame 10/27/2025 Conditional Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 10/28/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/28/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/29/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 10/29/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 10/29/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/30/2025 Conditional Approval BRIAN KELLY
Deputy Reinf. Masonry 10/30/2025 Conditional Approval BRIAN KELLY
Deputy Steel/Welding 10/30/2025 Conditional Approval BRIAN KELLY
Drywall Nailing 10/31/2025 Partial Approval GREGORY POMISH
Insulation 10/31/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 10/31/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/3/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/3/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/3/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 11/3/2025 Not Ready for Inspection GREGORY POMISH
Insulation 11/3/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 11/3/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/4/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/4/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 11/4/2025 Partial Approval GREGORY POMISH
Insulation 11/4/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 11/4/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 11/5/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/6/2025 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 11/6/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 11/7/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/7/2025 Conditional Approval JEFFREY DURAN
Drywall Nailing 11/7/2025 Not Ready for Inspection JEFFREY DURAN
Insulation 11/7/2025 Not Ready for Inspection JEFFREY DURAN
Light Gage Steel Frame 11/7/2025 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Concrete 11/10/2025 Conditional Approval RICKEY JACKSON
Deputy Reinf. Masonry 11/10/2025 Conditional Approval RICKEY JACKSON
Drywall Nailing 11/10/2025 Partial Inspection JEFFREY FULTON
Insulation 11/10/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 11/10/2025 Partial Inspection JEFFREY FULTON
Special/Order Compliance 11/10/2025 Partial Approval SCOTT SOBEL
Deputy Reinf. Concrete 11/12/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/12/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/12/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 11/12/2025 Not Ready for Inspection GREGORY POMISH
Insulation 11/12/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 11/12/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/13/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/13/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/13/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 11/13/2025 Partial Approval GREGORY POMISH
Insulation 11/13/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 11/13/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/14/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 11/14/2025 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 11/14/2025 Conditional Approval JEFFREY DURAN
Drywall Nailing 11/14/2025 Not Ready for Inspection JEFFREY DURAN
Insulation 11/14/2025 Not Ready for Inspection JEFFREY DURAN
Light Gage Steel Frame 11/14/2025 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Concrete 11/17/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/17/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/17/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 11/17/2025 Partial Inspection GREGORY POMISH
Insulation 11/17/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 11/17/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/18/2025 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/18/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 11/18/2025 Partial Inspection GREGORY POMISH
Insulation 11/18/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 11/18/2025 Partial Approval GREGORY POMISH
Drywall Nailing 11/19/2025 Partial Approval GREGORY POMISH
Insulation 11/19/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 11/19/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 11/21/2025 Partial Approval GREGORY POMISH
Drywall Nailing 11/24/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 11/24/2025 Partial Approval ROBERT DAVIS
Drywall Nailing 11/25/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/25/2025 Partial Approval GREGORY POMISH
Drywall Nailing 12/1/2025 Not Ready for Inspection GREGORY POMISH
Insulation 12/1/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 12/1/2025 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 12/2/2025 Partial Inspection GREGORY POMISH
Insulation 12/2/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 12/2/2025 Partial Approval GREGORY POMISH
Drywall Nailing 12/3/2025 Partial Approval ROBERT DAVIS
Insulation 12/3/2025 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 12/3/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/4/2025 Not Ready for Inspection ROBERT DAVIS
Insulation 12/4/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/4/2025 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 12/5/2025 Partial Approval ROBERT DAVIS
Insulation 12/5/2025 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 12/5/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 12/8/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/8/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/8/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/8/2025 Not Ready for Inspection GREGORY POMISH
Special/Order Compliance 12/8/2025 Partial Approval SCOTT SOBEL
Deputy Reinf. Concrete 12/9/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/9/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/9/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/9/2025 Not Ready for Inspection GREGORY POMISH
Insulation 12/9/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 12/9/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/10/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/10/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/10/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/10/2025 Partial Approval GREGORY POMISH
Insulation 12/10/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 12/10/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/11/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/11/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/11/2025 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 12/12/2025 Partial Approval GREGORY POMISH
Drywall Nailing 12/15/2025 Not Ready for Inspection GREGORY POMISH
Insulation 12/15/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 12/15/2025 Not Ready for Inspection GREGORY POMISH
Drywall Nailing 12/16/2025 Partial Inspection GREGORY POMISH
Insulation 12/16/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 12/16/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/17/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/18/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/18/2025 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/18/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/18/2025 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/19/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/19/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/19/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/19/2025 Partial Approval GREGORY POMISH
Insulation 12/19/2025 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 12/19/2025 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/22/2025 Conditional Approval ROBERT DAVIS
Drywall Nailing 12/22/2025 Partial Inspection GREGORY POMISH
Insulation 12/22/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/22/2025 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/23/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/23/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/23/2025 Conditional Approval GREGORY POMISH
Drywall Nailing 12/23/2025 Not Ready for Inspection GREGORY POMISH
Insulation 12/23/2025 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 12/23/2025 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/29/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/29/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 12/29/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/29/2025 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/30/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/30/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 12/30/2025 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 1/6/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/7/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 1/9/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/13/2026 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 1/13/2026 Partial Inspection ROBERT DAVIS
Masonry Wall/Backfill 1/13/2026 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/14/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 1/14/2026 Approved ROBERT DAVIS
Drywall Nailing 1/14/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/16/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/16/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/20/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 1/20/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/21/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 1/21/2026 Approved ROBERT DAVIS
Light Gage Steel Frame 1/21/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/22/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 1/22/2026 Approved ROBERT DAVIS
Insulation 1/22/2026 Partial Approval ROBERT DAVIS
Reinforced Concrete Frame 1/22/2026 Partial Approval ROBERT DAVIS
Structural Steel Frame 1/22/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 1/26/2026 Conditional Approval ROBERT DAVIS
T-Bar Ceiling 1/27/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 1/28/2026 Partial Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/29/2026 Partial Approval ROBERT DAVIS
Insulation 1/29/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/29/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 1/29/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 1/30/2026 Not Ready for Inspection ROBERT DAVIS
T-Bar Ceiling 1/30/2026 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 2/2/2026 Not Ready for Inspection ROBERT DAVIS
T-Bar Ceiling 2/2/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 2/3/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/4/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 2/4/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 2/5/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/5/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/5/2026 Approved ROBERT DAVIS
Light Gage Steel Frame 2/5/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/6/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/6/2026 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 2/6/2026 Not Ready for Inspection ROBERT DAVIS
T-Bar Ceiling 2/6/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/9/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 2/9/2026 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 2/9/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/10/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/10/2026 Approved ROBERT DAVIS
Deputy Steel/Welding 2/10/2026 Approved ROBERT DAVIS
Insulation 2/10/2026 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 2/10/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/11/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/11/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 2/11/2026 Approved ROBERT DAVIS
Light Gage Steel Frame 2/11/2026 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 2/12/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 2/12/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 2/14/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 2/14/2026 Not Ready for Inspection ROBERT DAVIS
Special/Order Compliance 2/14/2026 Corrections Issued ROBERT DAVIS
T-Bar Ceiling 2/14/2026 Corrections Issued ROBERT DAVIS
Drywall Nailing 2/18/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/18/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 2/19/2026 Partial Approval ROBERT DAVIS
Special/Order Compliance 2/20/2026 Partial Inspection ROBERT DAVIS
Light Gage Steel Frame 2/25/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/2/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/2/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/2/2026 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/2/2026 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/3/2026 Conditional Approval ROBERT DAVIS
Structural Steel Frame 3/3/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/4/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/4/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/4/2026 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/4/2026 Conditional Approval GREGORY POMISH
Drywall Nailing 3/4/2026 Not Ready for Inspection GREGORY POMISH
Insulation 3/4/2026 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/5/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/5/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/5/2026 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/5/2026 Conditional Approval GREGORY POMISH
Drywall Nailing 3/5/2026 Not Ready for Inspection GREGORY POMISH
Insulation 3/5/2026 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 3/5/2026 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/6/2026 Conditional Approval BRIAN KELLY
Deputy Reinf. Concrete 3/6/2026 Conditional Approval BRIAN KELLY
Deputy Reinf. Masonry 3/6/2026 Conditional Approval BRIAN KELLY
Deputy Steel/Welding 3/6/2026 Conditional Approval BRIAN KELLY
Drywall Nailing 3/10/2026 Partial Approval ROBERT DAVIS
Insulation 3/10/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 3/10/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 3/11/2026 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/11/2026 Partial Approval ROBERT DAVIS
Insulation 3/11/2026 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 3/11/2026 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 3/11/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 3/11/2026 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 3/12/2026 Not Ready for Inspection ROBERT DAVIS
Insulation 3/12/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 3/12/2026 Partial Approval ROBERT DAVIS
T-Bar Ceiling 3/12/2026 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 3/13/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 3/17/2026 Not Ready for Inspection ROBERT DAVIS
Insulation 3/17/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/17/2026 Not Ready for Inspection ROBERT DAVIS
Drywall Nailing 3/18/2026 Not Ready for Inspection ROBERT DAVIS
Insulation 3/18/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 3/18/2026 Partial Approval ROBERT DAVIS
Special/Order Compliance 3/19/2026 Partial Inspection ROBERT DAVIS
Drywall Nailing 3/20/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/20/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 3/27/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/27/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 3/31/2026 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 3/31/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/31/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/31/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 3/31/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/1/2026 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/1/2026 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/1/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/1/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/1/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/6/2026 Approved ROBERT DAVIS
Deputy Shotcrete 4/6/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/6/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/7/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/7/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/7/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/8/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/8/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 4/8/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/9/2026 Conditional Approval ROBERT DAVIS
Drywall Nailing 4/13/2026 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/13/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 4/13/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/17/2026 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 4/17/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 4/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/24/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 4/27/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/27/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/28/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/29/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/29/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 4/30/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/30/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/1/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/1/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Drilled-In Anchors 5/4/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/4/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 5/4/2026 Not Ready for Inspection ROBERT DAVIS
Final 5/4/2026 Not Ready for Inspection ROBERT DAVIS
Green Building Final 5/4/2026 Not Ready for Inspection ROBERT DAVIS
Green Building Rough 5/4/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 5/4/2026 Partial Approval ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 5/4/2026 SGSOV Not Ready ROBERT DAVIS
Smoke Detectors 5/4/2026 Not Ready for Inspection ROBERT DAVIS
Verify Sprinkler Sign Off 5/4/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/5/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/5/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/6/2026 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 5/11/2026 Partial Approval ROBERT DAVIS
Special/Order Compliance 5/11/2026 Corrections Issued ROBERT DAVIS
Deputy Drilled-In Anchors 5/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/12/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/13/2026 Conditional Approval ROBERT DAVIS
Structural Steel Frame 5/14/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 5/18/2026 Approved ROBERT DAVIS
Structural Steel Frame 5/18/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/19/2026 Conditional Approval ROBERT DAVIS
T-Bar Ceiling 5/19/2026 Corrections Issued ROBERT DAVIS
Deputy Reinf. Concrete 5/20/2026 Conditional Approval ROBERT DAVIS
Reinforced Masonry Frame 5/20/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/22/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 5/28/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 5/28/2026 Partial Approval ROBERT DAVIS
Structural Steel Frame 5/28/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 5/28/2026 Partial Approval ROBERT DAVIS
Masonry Wall/Backfill 5/29/2026 Not Ready for Inspection ROBERT DAVIS
Masonry Wall/Backfill 6/2/2026 Partial Approval ROBERT DAVIS
Deputy Wood Construction 6/5/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/17/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/23/2026 Conditional Approval ROBERT DAVIS
Reinforced Concrete Frame 6/23/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/24/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/24/2026 Partial Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 6/29/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/30/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/1/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 7/1/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/6/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/7/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/8/2026 No Result Entered ROBERT DAVIS
Masonry Wall/Backfill 7/8/2026 No Result Entered ROBERT DAVIS