6728 N SEPULVEDA BLVD 1-405 91411

Certificate Information: 6728 N SEPULVEDA BLVD 1-405 91411

Application / Permit
21010-10000-04987
Plan Check / Job No.
B21LA17956
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6 STORY 405 UNITS (41 ELI = 11%) AFFORDABLE HOUSING APARTMENT TO INCLUDE 5 STORY TYPE IIIA APARTMENT OVER 4 LEVEL TYPE IA PARKING/AMENITIES, TIER 3 TOC WITH ADDITIONAL INCENTIVES
Permit Issued
Issued on 12/12/2024
Issuing Office
Metro
Current Status
Issued on 12/12/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Plan Check Approved 11/13/2024 MANUEL MONTUFAR
Application Withdrawn-Void 12/11/2024 DANIEL LUERA-SIERRA
Re-Activate Application 12/11/2024 MANUEL MONTUFAR
Plan Check Approved 12/11/2024 MANUEL MONTUFAR
Issued 12/12/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 8/9/2022 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 9/16/2022 CARLOS AGUILERA
"Q" conditions Cleared 10/25/2022 BRENNEN OBETO
Frnt yard landscape/Water mgmt Cleared 10/25/2022 BRENNEN OBETO
Miscellaneous Cleared 10/25/2022 BRENNEN OBETO
Miscellaneous Cleared 10/25/2022 BRENNEN OBETO
Miscellaneous Cleared 10/25/2022 BRENNEN OBETO
Miscellaneous Cleared 10/25/2022 BRENNEN OBETO
Miscellaneous Cleared 10/25/2022 BRENNEN OBETO
Opn space landscape/Water mgmt Cleared 10/25/2022 BRENNEN OBETO
ZA Case Cleared 10/25/2022 BRENNEN OBETO
ZA Case Cleared 10/25/2022 BRENNEN OBETO
ZA Case Cleared 10/25/2022 BRENNEN OBETO
ZI Cleared 10/25/2022 BRENNEN OBETO
Highway dedication Cleared 10/27/2022 LEE GUILBEAUX
Permit Cleared 10/27/2022 LEE GUILBEAUX
Sewer availability Cleared 10/27/2022 CARLOS AGUILERA
Construction near power lines Cleared 10/28/2022 WALTER RAMIREZ
Construction within easement Cleared 10/28/2022 WALTER RAMIREZ
Trees in Parkway Cleared 11/23/2022 ADALBERTO VERA
Hydrant and Access approval Cleared 12/6/2022 MATTHEW CRAIG
Building over 36-ft Cleared 11/30/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/30/2023 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 3/21/2024 LEE GUILBEAUX
Green Code Cleared 4/16/2024 MANUEL MONTUFAR
Fire Marshal Fire Life Safety Cleared 6/14/2024 MENOA AGHAJANI
Low Impact Development Cleared 8/5/2024 ANDRES COVARRUBIAS
DAS Clearance Cleared 8/7/2024 MANUEL MONTUFAR
Roof/Waste drainage to street Cleared 8/7/2024 EDGAR ALCARAZ
Miscellaneous Cleared 10/8/2024 ROSALINDA MEZA
Density Bonus 12.22.A.31 Cleared 10/31/2024 BLAKE BOULIGNY
Miscellaneous Cleared 11/5/2024 ROSALINDA MEZA

Contact Information

Architect Strickland,, Carrie; Lic. No.: C33063 811 SE STARK STREET SUITE 210      PORTLAND, OR 97214
Contractor Uncommon Builders Llc; Lic. No.: 1046026-B 9220 WINNETKA AVE      CHATSWORTH, CA 91311
Engineer Hicks,, Joseph M; Lic. No.: C93183 500 N VICTORY BLVD      BURBANK, CA 91502
Engineer Larocca,, Francis; Lic. No.: C75121 2008A BELMONT LANE      REDONDO BEACH, CA 90278
Engineer Volnyy,, Vladimir; Lic. No.: S4817 11342 PALA MESA DR      NORTHRIDGE, CA 91326
Engineer Woodley,, George Allen; Lic. No.: C54744 12645 CLARK STREET      SANTA FE SPRINGS, CA 90670
Landscape Architect Kim,, Samuel Kyun; Lic. No.: LA3249 2669 SATURN ST      BREA, CA 92821

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Drywall Nailing 7/27/2026   
Insulation 7/27/2026   

Inspection Request History

Deputy Grading 3/19/2025 Conditional Approval ROBERT DAVIS
Pre-Inspection 3/19/2025 Approved ROBERT DAVIS
Deputy Steel/Welding 4/1/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/4/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/9/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 4/21/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/24/2025 Partial Inspection GREGORY POMISH
Special/Order Compliance 4/24/2025 Partial Inspection DEANDRE HOFFMAN
Excavation/Setback/Form/Re-Bar 5/6/2025 Partial Inspection ROBERT DAVIS
Piling/Pier/Caisson 5/6/2025 Partial Inspection ROBERT DAVIS
Deputy Steel/Welding 5/7/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/12/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 5/13/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/15/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 5/16/2025 Conditional Approval JEFFREY DURAN
Excavation/Setback/Form/Re-Bar 6/3/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 6/5/2025 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 6/5/2025 Conditional Approval ROBERT DAVIS
Pre-Inspection 6/24/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/15/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 7/16/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/16/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/18/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/30/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/26/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/27/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/28/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 8/29/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 8/29/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 8/29/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/2/2025 Approved ROBERT DAVIS
Footing/Foundation/Slab 9/2/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/4/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/5/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/8/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/10/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/11/2025 Conditional Approval ROBERT DAVIS
Deputy Grading 9/12/2025 Conditional Approval ROBERT DAVIS
Deputy Other (see comments) 9/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/12/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/15/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/16/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/17/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/18/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/19/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/22/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/22/2025 Partial Approval ROBERT DAVIS
Footing/Foundation/Slab 9/22/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/23/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/23/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/24/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/24/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 9/25/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/26/2025 Conditional Approval BRIAN KELLY
Deputy Pre-Stress Concrete 9/29/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/29/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 9/29/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 9/29/2025 Partial Approval GREGORY POMISH
Piling/Pier/Caisson 9/29/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 9/30/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 9/30/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 9/30/2025 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/1/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 10/1/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/1/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/1/2025 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/2/2025 Approved ROBERT DAVIS
Deputy Reinf. Concrete 10/2/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/2/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/2/2025 Partial Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/3/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/3/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/3/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/6/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/6/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/6/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/6/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/7/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/7/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/8/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/8/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/8/2025 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/9/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/9/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/10/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/10/2025 Approved ROBERT DAVIS
Deputy Shotcrete 10/10/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/10/2025 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/14/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/15/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 10/17/2025 Partial Approval ROBERT DAVIS
Deputy Other (see comments) 10/20/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/20/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/20/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/20/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/21/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 10/21/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 10/21/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 10/22/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/22/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/22/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/22/2025 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 10/23/2025 Conditional Approval BRIAN KELLY
Deputy Reinf. Concrete 10/23/2025 Conditional Approval BRIAN KELLY
Deputy Shotcrete 10/23/2025 Conditional Approval BRIAN KELLY
Deputy Pre-Stress Concrete 10/24/2025 Conditional Approval BRIAN KELLY
Deputy Reinf. Concrete 10/24/2025 Conditional Approval BRIAN KELLY
Deputy Shotcrete 10/24/2025 Conditional Approval BRIAN KELLY
Deputy Reinf. Concrete 10/28/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/28/2025 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/29/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/29/2025 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 10/30/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/30/2025 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/31/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 10/31/2025 Not Ready for Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 11/3/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/3/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/3/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/3/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/3/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/4/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/4/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/5/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/5/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/5/2025 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/6/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/6/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/7/2025 Conditional Approval BRIAN KELLY
Deputy Shotcrete 11/7/2025 Conditional Approval BRIAN KELLY
Footing/Foundation/Slab 11/8/2025 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/10/2025 Conditional Approval RICKEY JACKSON
Footing/Foundation/Slab 11/10/2025 Partial Approval DEANDRE HOFFMAN
Deputy Reinf. Concrete 11/12/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/13/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/13/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/13/2025 Order to Comply Issued GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/13/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/14/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 11/14/2025 Approved JOHN KITCKO
Deputy Shotcrete 11/14/2025 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 11/14/2025 Not Ready for Inspection JOHN KITCKO
Deputy Pre-Stress Concrete 11/17/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/17/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/18/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/18/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/19/2025 Conditional Approval BRIAN KELLY
Deputy Shotcrete 11/19/2025 Conditional Approval BRIAN KELLY
Deputy Pre-Stress Concrete 11/20/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/20/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/20/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/21/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/21/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/21/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 11/24/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 11/24/2025 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 11/24/2025 Not Ready for Inspection ROBERT DAVIS
Deputy Pre-Stress Concrete 11/25/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/25/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/25/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/25/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 11/26/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/26/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/26/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/26/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/1/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/1/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/1/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/2/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/2/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/2/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/3/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/3/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/3/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/4/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/4/2025 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 12/4/2025 Not Ready for Inspection ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/5/2025 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/9/2025 Partial Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 12/9/2025 Partial Inspection GREGORY POMISH
Deputy Pre-Stress Concrete 12/10/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/10/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/10/2025 Partial Approval GREGORY POMISH
Deputy Shotcrete 12/10/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/11/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/11/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/11/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/11/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/12/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/12/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/12/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/12/2025 Partial Approval GREGORY POMISH
Deputy Other (see comments) 12/15/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/15/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/15/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/16/2025 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/16/2025 Partial Approval GREGORY POMISH
Deputy Other (see comments) 12/17/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/17/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/17/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/17/2025 Partial Approval GREGORY POMISH
Deputy Other (see comments) 12/18/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/18/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/18/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/18/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/19/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/19/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/19/2025 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/19/2025 Partial Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/22/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/22/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/22/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/23/2025 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/23/2025 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/23/2025 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 12/24/2025 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 12/24/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/24/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 12/26/2025 Approved JOHN KITCKO
Deputy Reinf. Concrete 12/26/2025 Approved JOHN KITCKO
Deputy Shotcrete 12/26/2025 Approved JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/26/2025 Not Ready for Inspection JOHN KITCKO
Excavation/Setback/Form/Re-Bar 12/27/2025 Partial Approval JOHN KITCKO
Deputy Pre-Stress Concrete 12/29/2025 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/29/2025 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 12/30/2025 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 12/30/2025 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 12/30/2025 Partial Inspection ROBERT DAVIS
Deputy Pre-Stress Concrete 12/31/2025 Conditional Approval ROBERT DAVIS
Deputy Pre-Stress Concrete 1/2/2026 Approved ROBERT DAVIS
Deputy Reinf. Concrete 1/2/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/2/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/5/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/5/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/6/2026 Approved ROBERT DAVIS
Deputy Shotcrete 1/6/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/6/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/7/2026 Approved ROBERT DAVIS
Deputy Shotcrete 1/7/2026 Approved ROBERT DAVIS
Deputy Reinf. Concrete 1/8/2026 Approved ROBERT DAVIS
Deputy Shotcrete 1/8/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/8/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/9/2026 Approved ROBERT DAVIS
Deputy Shotcrete 1/9/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/9/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/12/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/13/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/14/2026 Approved ROBERT DAVIS
Deputy Shotcrete 1/14/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/14/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 1/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/16/2026 Approved ROBERT DAVIS
Deputy Shotcrete 1/16/2026 Conditional Approval ROBERT DAVIS
Green Building Rough 1/16/2026 Not Ready for Inspection ROBERT DAVIS
Reinforced Concrete Frame 1/16/2026 Partial Approval ROBERT DAVIS
Verify Sprinkler Sign Off 1/16/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/21/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/21/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/22/2026 Conditional Approval ROBERT DAVIS
Special/Order Compliance 1/22/2026 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/23/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/23/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/27/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/28/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/28/2026 Partial Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/29/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 1/30/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 1/30/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/2/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/3/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/4/2026 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/6/2026 Not Ready for Inspection ROBERT DAVIS
Special/Order Compliance 2/6/2026 Partial Inspection BRIAN KELLY
Deputy Reinf. Concrete 2/9/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 2/9/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 2/10/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 2/10/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/10/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/11/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 2/11/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/11/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/12/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/17/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/17/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 2/20/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 2/25/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 2/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/2/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/2/2026 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 3/2/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/3/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/4/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/4/2026 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/4/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 3/5/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/5/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 3/5/2026 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/5/2026 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 3/6/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 3/6/2026 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/6/2026 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/11/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/16/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/16/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 3/16/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 3/17/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/17/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 3/17/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/18/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/18/2026 Approved ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/18/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/19/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/25/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/25/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 3/25/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/26/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/26/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 3/27/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 3/27/2026 Conditional Approval ROBERT DAVIS
Deputy Steel/Welding 3/27/2026 Conditional Approval ROBERT DAVIS
Drywall Nailing 3/27/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 3/27/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 3/31/2026 Conditional Approval ROBERT DAVIS
Masonry Wall/Backfill 4/1/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/2/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/3/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/7/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/7/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/7/2026 Conditional Approval ROBERT DAVIS
Structural Steel Frame 4/7/2026 Approved ROBERT DAVIS
Deputy Reinf. Concrete 4/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/8/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/9/2026 Conditional Approval ROBERT DAVIS
Deputy Shotcrete 4/9/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/10/2026 Approved ROBERT DAVIS
Deputy Reinf. Masonry 4/10/2026 Approved ROBERT DAVIS
Deputy Shotcrete 4/10/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/10/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/13/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/13/2026 Approved ROBERT DAVIS
Masonry Wall/Backfill 4/13/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/14/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 4/14/2026 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/15/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/16/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/16/2026 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/16/2026 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 4/17/2026 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/17/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/17/2026 Conditional Approval GREGORY POMISH
Wood Frame 4/17/2026 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 4/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/20/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/21/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/21/2026 Conditional Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 4/21/2026 Not Ready for Inspection ROBERT DAVIS
Wood Frame 4/21/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 4/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/22/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/23/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 4/24/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 4/24/2026 Conditional Approval ROBERT DAVIS
Light Gage Steel Frame 4/27/2026 Partial Approval ROBERT DAVIS
Wood Frame 4/27/2026 Partial Approval ROBERT DAVIS
Reinforced Masonry Frame 4/29/2026 Partial Approval ROBERT DAVIS
Wood Frame 4/29/2026 Partial Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 4/30/2026 Partial Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/4/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Masonry 5/4/2026 Conditional Approval ROBERT DAVIS
Insulation 5/5/2026 Partial Approval ROBERT DAVIS
Wood Frame 5/5/2026 Partial Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/6/2026 Conditional Approval ROBERT DAVIS
Deputy Drilled-In Anchors 5/7/2026 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 5/8/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 5/13/2026 Conditional Approval ROBERT DAVIS
Wood Frame 5/13/2026 Partial Approval ROBERT DAVIS
Insulation 5/14/2026 Not Ready for Inspection ROBERT DAVIS
Wood Frame 5/14/2026 Partial Approval ROBERT DAVIS
Insulation 5/18/2026 Partial Approval ROBERT DAVIS
Insulation 5/19/2026 Not Ready for Inspection ROBERT DAVIS
Wood Frame 5/19/2026 Not Ready for Inspection ROBERT DAVIS
Wood Frame 5/26/2026 Partial Approval ROBERT DAVIS
Deputy Steel/Welding 5/28/2026 Conditional Approval JEFFREY DURAN
Insulation 5/29/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 6/3/2026 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/5/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 6/8/2026 Partial Approval ROBERT DAVIS
Insulation 6/8/2026 Partial Approval ROBERT DAVIS
Wood Frame 6/8/2026 Partial Approval ROBERT DAVIS
Wood Frame 6/9/2026 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/10/2026 Approved ROBERT DAVIS
Insulation 6/10/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/10/2026 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/11/2026 Partial Approval ROBERT DAVIS
Insulation 6/11/2026 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/18/2026 Corrections Issued ROBERT DAVIS
Insulation 6/18/2026 Not Ready for Inspection ROBERT DAVIS
Light Gage Steel Frame 6/18/2026 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/23/2026 Partial Approval ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 6/25/2026 Partial Approval ROBERT DAVIS
Insulation 6/25/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 6/25/2026 Not Ready for Inspection ROBERT DAVIS
Floor/Roof Diaphrgm/Shear Wall 7/6/2026 Partial Approval ROBERT DAVIS
Insulation 7/6/2026 Partial Approval ROBERT DAVIS
Light Gage Steel Frame 7/6/2026 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 7/7/2026 Conditional Approval ROBERT DAVIS
Deputy Reinf. Concrete 7/8/2026 Conditional Approval ROBERT DAVIS
Excavation/Setback/Form/Re-Bar 7/8/2026 Partial Approval ROBERT DAVIS
Insulation 7/9/2026 Partial Approval ROBERT DAVIS
Wood Frame 7/9/2026 Partial Approval ROBERT DAVIS
Drywall Nailing 7/14/2026 Partial Approval ROBERT DAVIS