8434 S LILIENTHAL AVE 90045

Certificate Information: 8434 S LILIENTHAL AVE 90045

Application / Permit
21010-10000-04852
Plan Check / Job No.
B21LA17479
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
eplan. New Accessory Dwelling unit by Installing a two-bedroom RADCO Approved Factory Built Housing Accessory Dwelling Unit over a raised floor foundation. LADBS ADU Standard Plan ADU30. FBH Per: RAD-31-1029. Per CA Govt. Code 65852.2(e)(1)(D)
Permit Issued
Issued on 2/11/2022
Issuing Office
Current Status
CofO Issued on 3/15/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/22/2021 APPLICANT
Assigned to Plan Check Engineer 9/24/2021 MONICA RAMIREZ
Corrections Issued 9/27/2021 MONICA RAMIREZ
Applicant returned to address corrections 1/7/2022 MONICA RAMIREZ
Applicant returned to address corrections 1/8/2022 MONICA RAMIREZ
No Progress 2/2/2022 MONICA RAMIREZ
Plan Check Approved 2/7/2022 MONICA RAMIREZ
Issued 2/11/2022 APPLICANT
CofO in Progress 3/10/2023 BOBBY KEY
Permit Finaled 3/15/2023 DANIEL ORRANTE
CofO Issued 3/15/2023 DANIEL ORRANTE
Permit Finaled 3/15/2023 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 10/14/2021 DINAH GARIN
Sewer availability Cleared 10/14/2021 DINAH GARIN
Specific Plan Cleared 10/27/2021 PEDRO AYALA
Eng Process Fee Ord 176,300 Cleared 11/4/2021 DINAH GARIN
Construction near power lines Cleared 1/3/2022 RIDWAN HARDY
Low Impact Development Cleared 1/27/2022 CHRIS VONG
Roof/Waste drainage to street Cleared 1/28/2022 DINAH GARIN
Tenant Habitability Plan Cleared 2/7/2022 PHILLIP MUNGUIA

Contact Information

Contractor United Dwelling Construction Inc; Lic. No.: 1066382-B       ,
Engineer Farish,, William Crawford; Lic. No.: C30123 19432 CASTLEWOOD CR      HUNTINGTON BEACH, CA 92648
Engineer Sveiven,, Shane; Lic. No.: C89133 1909 S ALMA STREET      SAN PEDRO, CA 90731

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 6/2/2022 Approved BOBBY KEY
Underground Mechanical 6/2/2022 Approved BOBBY KEY
Excavation/Setback/Form/Re-Bar 6/9/2022 Approved BOBBY KEY
Footing/Foundation/Slab 6/9/2022 Approved BOBBY KEY
BUILDING-Rough-Frame 8/3/2022 Approved BOBBY KEY
Verify Sprinkler Sign Off 8/3/2022 Approved BOBBY KEY
HVAC-Rough 10/13/2022 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 12/14/2022 SGSOV Not Ready BOBBY KEY
ELECTRICAL-Final 1/5/2023 Conditional Approval BOBBY KEY
PLUMBING-Final 1/5/2023 Corrections Issued BOBBY KEY
Service/Power Release 1/5/2023 Not Ready for Inspection BOBBY KEY
Special/Order Compliance 1/5/2023 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 2/24/2023 SGSOV Not Required HERBERT GIRON
Final 2/27/2023 Corrections Issued HERBERT GIRON
Service/Power Release 2/27/2023 Approved HERBERT GIRON
Smoke Detectors 2/27/2023 Approved HERBERT GIRON
Final 3/10/2023 OK to Issue CofO BOBBY KEY