Deputy Reinf. Concrete
|
4/18/2023
|
Approved
|
DERRICK SPENCER
|
|
FLOOD-Proofing Certificate
|
4/19/2023
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/19/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/19/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
4/19/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
4/19/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/20/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
4/20/2023
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/21/2023
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/25/2023
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/27/2023
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
4/27/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/1/2023
|
Approved
|
GRANT WOODS
|
|
Drywall Nailing
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Excavation/Setback/Form/Re-Bar
|
5/1/2023
|
Partial Approval
|
GRANT WOODS
|
|
Final
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Grading Pre-Inspection
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Green Building Final
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
SGSOV-Seismic Gas S/O Valve
|
5/1/2023
|
SGSOV Not Ready
|
GRANT WOODS
|
|
Smoke Detectors
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
5/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
5/23/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
5/24/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
5/25/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
5/30/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/8/2023
|
Conditional Approval
|
DAVID TSAU
|
|
Footing/Foundation/Slab
|
6/8/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/9/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Shotcrete
|
6/14/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Excavation/Setback/Form/Re-Bar
|
6/14/2023
|
Partial Approval
|
GRANT WOODS
|
|
Green Building Rough
|
6/14/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/15/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Shotcrete
|
6/15/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/16/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/20/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/21/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/23/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/26/2023
|
Approved
|
GRANT WOODS
|
|
Green Building Rough
|
6/26/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Reinforced Concrete Frame
|
6/26/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/27/2023
|
Approved
|
GRANT WOODS
|
|
Excavation/Setback/Form/Re-Bar
|
6/27/2023
|
Partial Approval
|
GRANT WOODS
|
|
Reinforced Masonry Frame
|
6/27/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/28/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Shotcrete
|
6/28/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/29/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Excavation/Setback/Form/Re-Bar
|
7/10/2023
|
Partial Approval
|
GRANT WOODS
|
|
Green Building Rough
|
7/10/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/2/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
8/3/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/4/2023
|
Approved
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
8/14/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/15/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/17/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/24/2023
|
Approved
|
GRANT WOODS
|
|
Pre-Inspection
|
8/24/2023
|
Partial Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/28/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2023
|
Partial Approval
|
GRANT WOODS
|
|
Green Building Rough
|
9/11/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/12/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Steel/Welding
|
9/19/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Steel/Welding
|
9/20/2023
|
Corrections Issued
|
GRANT WOODS
|
|
Deputy Steel/Welding
|
9/26/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Steel/Welding
|
10/3/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Steel/Welding
|
10/10/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
10/18/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
10/19/2023
|
Approved
|
GRANT WOODS
|
|
Green Building Rough
|
10/19/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
10/19/2023
|
Partial Approval
|
GRANT WOODS
|
|
Green Building Rough
|
10/25/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
10/25/2023
|
Partial Approval
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
10/26/2023
|
Partial Approval
|
GRANT WOODS
|
|
Green Building Rough
|
10/26/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
10/27/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Green Building Rough
|
11/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Masonry Wall/Backfill
|
11/1/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
11/1/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
11/15/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
11/15/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Masonry Wall/Backfill
|
11/16/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
11/17/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
11/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
11/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Wood Frame
|
11/29/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
12/6/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Green Building Rough
|
12/7/2023
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
12/7/2023
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Wood Construction
|
12/12/2023
|
Conditional Approval
|
DAVID TSAU
|
|
Wood Frame
|
12/13/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Wood Construction
|
12/14/2023
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Wood Construction
|
12/18/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
1/8/2024
|
No Access for Inspection
|
GRANT WOODS
|
|
Drywall Nailing
|
1/11/2024
|
Partial Approval
|
GRANT WOODS
|
|
Light Gage Steel Frame
|
1/24/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
2/9/2024
|
Partial Approval
|
GRANT WOODS
|
|
Wood Frame
|
2/9/2024
|
Partial Approval
|
GRANT WOODS
|
|
Insulation
|
3/8/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
3/19/2024
|
Partial Approval
|
GRANT WOODS
|
|
Pre-Inspection
|
3/20/2024
|
Partial Approval
|
GRANT WOODS
|
|
Insulation
|
3/22/2024
|
Partial Approval
|
GRANT WOODS
|
|
Insulation
|
3/29/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
4/5/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/8/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Wood Construction
|
4/9/2024
|
Approved
|
GRANT WOODS
|
|
Wood Frame
|
4/9/2024
|
Partial Approval
|
GRANT WOODS
|
|
Wood Frame
|
4/11/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
4/17/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
4/22/2024
|
Approved
|
GRANT WOODS
|
|
Wood Frame
|
4/22/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Insulation
|
4/23/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
4/25/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Special/Order Compliance
|
4/26/2024
|
Partial Approval
|
GRANT WOODS
|
|
Special/Order Compliance
|
4/26/2024
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
5/3/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
5/6/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
5/6/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
5/8/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Wood Frame
|
5/8/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
5/14/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Insulation
|
5/15/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Interior/Exterior Lathing
|
5/17/2024
|
Partial Approval
|
PAUL DAVIDSON
|
|
Drywall Nailing
|
5/22/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
5/29/2024
|
Partial Approval
|
GRANT WOODS
|
|
Insulation
|
5/29/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Insulation
|
6/10/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Insulation
|
6/12/2024
|
Partial Approval
|
GRANT WOODS
|
|
Insulation
|
6/17/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Reinforced Concrete Frame
|
6/21/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/24/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/25/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Reinforced Concrete Frame
|
6/26/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
7/8/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
7/9/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
7/12/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Excavation/Setback/Form/Re-Bar
|
7/19/2024
|
Partial Approval
|
GRANT WOODS
|
|
Special/Order Compliance
|
7/24/2024
|
Partial Approval
|
GRANT WOODS
|
|
Wood Frame
|
8/2/2024
|
Partial Approval
|
GRANT WOODS
|
|
Insulation
|
8/5/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Wood Construction
|
8/6/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Wood Frame
|
8/6/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
8/8/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/14/2024
|
Approved
|
GRANT WOODS
|
|
Insulation
|
8/14/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
8/15/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Interior/Exterior Lathing
|
8/20/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
8/22/2024
|
Approved
|
GRANT WOODS
|
|
Insulation
|
8/22/2024
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Drywall Nailing
|
8/23/2024
|
Corrections Issued
|
GRANT WOODS
|
|
Interior/Exterior Lathing
|
8/29/2024
|
Partial Approval
|
GRANT WOODS
|
|
Reinforced Concrete Frame
|
9/3/2024
|
Partial Inspection
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
9/5/2024
|
Conditional Approval
|
ALAN NOVAK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/6/2024
|
Partial Inspection
|
ALAN NOVAK
|
|
Reinforced Concrete Frame
|
9/12/2024
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/17/2024
|
Conditional Approval
|
GRANT WOODS
|
|
Interior/Exterior Lathing
|
9/20/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
10/25/2024
|
Partial Approval
|
GRANT WOODS
|
|
Light Gage Steel Frame
|
12/9/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
12/11/2024
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
12/17/2024
|
Partial Approval
|
ALAN NOVAK
|
|
Light Gage Steel Frame
|
1/16/2025
|
Partial Approval
|
ALAN NOVAK
|
|
Pre-Inspection
|
1/29/2025
|
Approved
|
GRANT WOODS
|
|
Drywall Nailing
|
1/31/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Final
|
1/31/2025
|
Corrections Issued
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
1/31/2025
|
Approved
|
GRANT WOODS
|
|
Green Building Final
|
1/31/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Reinforced Concrete Frame
|
1/31/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
SGSOV-Seismic Gas S/O Valve
|
1/31/2025
|
SGSOV Approved
|
GRANT WOODS
|
|
Smoke Detectors
|
1/31/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
1/31/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Drywall Nailing
|
2/11/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Final
|
2/11/2025
|
Partial Inspection
|
GRANT WOODS
|
|
Green Building Final
|
2/11/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Reinforced Concrete Frame
|
2/11/2025
|
Corrections Issued
|
GRANT WOODS
|
|
Smoke Detectors
|
2/11/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Wood Frame
|
2/11/2025
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Special/Order Compliance
|
2/12/2025
|
Partial Approval
|
GRANT WOODS
|
|
Drywall Nailing
|
2/20/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
2/20/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Green Building Final
|
2/20/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
2/20/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Smoke Detectors
|
2/20/2025
|
Approved
|
DERRICK SPENCER
|
|
Wood Frame
|
2/20/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Special/Order Compliance
|
2/21/2025
|
Not Ready for Inspection
|
ALAN NOVAK
|
|
Drywall Nailing
|
2/24/2025
|
Approved
|
GRANT WOODS
|
|
Final
|
2/24/2025
|
Corrections Issued
|
GRANT WOODS
|
|
Green Building Final
|
2/24/2025
|
Approved
|
GRANT WOODS
|
|
Reinforced Concrete Frame
|
2/24/2025
|
Approved
|
GRANT WOODS
|
|
Wood Frame
|
2/24/2025
|
Approved
|
GRANT WOODS
|
|
Final
|
5/7/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
6/2/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Final
|
6/5/2025
|
OK to Issue CofO
|
DERRICK SPENCER
|